          A BILL TO BE ENTITLED
         | 
      
      
        | 
           
			 | 
        
          AN ACT
         | 
      
      
        | 
           
			 | 
        relating to the regulation of the amount of installed electric  | 
      
      
        | 
           
			 | 
        generation capacity. | 
      
      
        | 
           
			 | 
               BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | 
      
      
        | 
           
			 | 
               SECTION 1.  Section 39.001, Utilities Code, is amended by  | 
      
      
        | 
           
			 | 
        amending Subsection (a) and adding Subsection (d-1) to read as  | 
      
      
        | 
           
			 | 
        follows: | 
      
      
        | 
           
			 | 
               (a)  The legislature finds that the production and sale of  | 
      
      
        | 
           
			 | 
        electricity is not a monopoly warranting regulation of rates,  | 
      
      
        | 
           
			 | 
        operations, and services and that the public interest in  | 
      
      
        | 
           
			 | 
        competitive electric markets requires that, except for  | 
      
      
        | 
           
			 | 
        transmission and distribution services and for the recovery of  | 
      
      
        | 
           
			 | 
        stranded costs, generation capacity and electric services and their  | 
      
      
        | 
           
			 | 
        prices should be determined by customer choices and the normal  | 
      
      
        | 
           
			 | 
        forces of competition.  As a result, this chapter is enacted to  | 
      
      
        | 
           
			 | 
        protect the public interest during the transition to and in the  | 
      
      
        | 
           
			 | 
        establishment of a fully competitive electric power industry. | 
      
      
        | 
           
			 | 
               (d-1)  The legislature finds that the amount of installed  | 
      
      
        | 
           
			 | 
        generation capacity is best determined by investor, generator, and  | 
      
      
        | 
           
			 | 
        customer choices through the normal forces of competition. As a  | 
      
      
        | 
           
			 | 
        result, regulatory authorities may not mandate or otherwise  | 
      
      
        | 
           
			 | 
        regulate the amount of installed generation capacity or require a  | 
      
      
        | 
           
			 | 
        surplus or reserve of installed generation capacity above actual or  | 
      
      
        | 
           
			 | 
        forecasted levels of load. | 
      
      
        | 
           
			 | 
               SECTION 2.  Section 39.152(a), Utilities Code, is amended to  | 
      
      
        | 
           
			 | 
        read as follows: | 
      
      
        | 
           
			 | 
               (a)  The commission shall certify a power region if: | 
      
      
        | 
           
			 | 
                     (1)  a sufficient number of interconnected utilities in  | 
      
      
        | 
           
			 | 
        the power region fall under the operational control of an  | 
      
      
        | 
           
			 | 
        independent organization as described by Section 39.151; and | 
      
      
        | 
           
			 | 
                     (2)  the power region has a generally applicable tariff  | 
      
      
        | 
           
			 | 
        that guarantees open and nondiscriminatory access for all users to  | 
      
      
        | 
           
			 | 
        transmission and distribution facilities in the power region as  | 
      
      
        | 
           
			 | 
        provided by Section 39.203[; and
         | 
      
      
        | 
           
			 | 
                     [(3)
           
           
          no person owns and controls more than 20 percent 
         | 
      
      
        | 
           
			 | 
        
          of the installed generation capacity located in or capable of 
         | 
      
      
        | 
           
			 | 
        
          delivering electricity to a power region, as determined according 
         | 
      
      
        | 
           
			 | 
        
          to Section 39.154]. | 
      
      
        | 
           
			 | 
               SECTION 3.  Section 39.262(d), Utilities Code, is amended to  | 
      
      
        | 
           
			 | 
        read as follows: | 
      
      
        | 
           
			 | 
               (d)  The affiliated power generation company shall  | 
      
      
        | 
           
			 | 
        reconcile, and either credit or bill to the transmission and  | 
      
      
        | 
           
			 | 
        distribution utility, the net sum of: | 
      
      
        | 
           
			 | 
                     (1)  the former electric utility's final fuel balance  | 
      
      
        | 
           
			 | 
        determined under Section 39.202(c); and | 
      
      
        | 
           
			 | 
                     (2)  any difference between the price of power obtained  | 
      
      
        | 
           
			 | 
        through the capacity auctions under Section [Sections] 39.153 and  | 
      
      
        | 
           
			 | 
        former Section 39.156 and the power cost projections that were  | 
      
      
        | 
           
			 | 
        employed for the same time period in the ECOM model to estimate  | 
      
      
        | 
           
			 | 
        stranded costs in the proceeding under Section 39.201. | 
      
      
        | 
           
			 | 
               SECTION 4.  Sections 39.152(d), 39.153(d), 39.154, 39.156,  | 
      
      
        | 
           
			 | 
        39.157(c), and 39.158(a), Utilities Code, are repealed. | 
      
      
        | 
           
			 | 
               SECTION 5.  This Act takes effect September 1, 2015. |