GENERAL ASSEMBLY OF NORTH CAROLINA
SESSION 2015
H 2
HOUSE BILL 765
Senate Agriculture/Environment/Natural Resources Committee Substitute Adopted 6/29/15
Short Title: Regulatory Reform Act of 2015. |
(Public) |
|
Sponsors: |
|
|
Referred to: |
|
|
April 15, 2015
A BILL TO BE ENTITLED
AN ACT to provide further REGULATORY RELIEF TO THE CITIZENS OF nORTH CAROLINA by providing for various administrative reforms, by eliminating certain unnecessary or outdated statutes and regulations and modernizing or simplifying cumbersome or outdated regulations, and by making various other statutory changes.
The General Assembly of North Carolina enacts:
PART I. ADMINISTRATIVE REFORMS
REPEAL OBSOLETE STATUTES
SECTION 1.1. The following statues are repealed:
(1) G.S. 14‑197. Using profane or indecent language on public highways; counties exempt.
(2) G.S. 14‑401.8. Refusing to relinquish party telephone line in emergency; false statement of emergency.
BURDEN OF PROOF IN CERTAIN CONTESTED CASES
SECTION 1.2.(a) Article 3 of Chapter 150B of the General Statutes is amended by adding a new section to read:
"§ 150B‑25.1. Burden of proof.
(a) Except as otherwise provided by law or by this section, the petitioner in a contested case has the burden of proving the facts alleged in the petition by a preponderance of the evidence.
(b) In a contested case involving the imposition of civil fines or penalties by a State agency for violation of the law, the burden of showing by a preponderance of the evidence that the person who was fined actually committed the act for which the fine or penalty was imposed rests with the State agency.
(c) The burden of showing by a preponderance of the evidence that a career State employee subject to Chapter 126 of the General Statutes was discharged, suspended, or demoted for just cause rests with the agency employer."
SECTION 1.2.(b) The Joint Legislative Administrative Procedure Oversight Committee shall study whether there are other categories of contested cases in which the burden of proof should be placed with the agency.
SECTION 1.2.(c) This section is effective when this act becomes law and applies to contested cases commenced on or after that date.
LEGISLATIVE APPOINTMENTS
SECTION 1.3.(a) G.S. 120‑121 is amended by adding two new subsections to read:
"(e) The following applies in any case where the Speaker of the House of Representatives or the President Pro Tempore of the Senate is directed by law to make a recommendation for an appointment by the General Assembly, and the legislator is also directed to make the recommendation in consultation with or upon the recommendation of a third party:
(1) The recommendation or consultation is discretionary and is not binding upon the legislator.
(2) The third party must submit the recommendation or consultation at least 60 days prior to the expiration of the term or within 10 business days from the occurrence of a vacancy.
(3) Failure by the third party to submit the recommendation or consultation to the legislator within the time periods required under this subsection shall be deemed a waiver by the third party of the opportunity.
(f) The following applies in any case where the Speaker of the House of Representatives or the President Pro Tempore of the Senate is directed by law to make a recommendation for an appointment by the General Assembly, and the legislator is also directed to make the recommendation from nominees provided by a third party:
(1) The third party must submit the nominees at least 60 days prior to the expiration of the term or within 10 business days from the occurrence of a vacancy.
(2) Failure by the third party to submit the nomination to the legislator within the time periods required under this subsection shall be deemed a waiver by the third party of the opportunity."
SECTION 1.3.(b) Article 16 of Chapter 120 of the General Statutes is amended by adding a new section to read:
"§ 120‑124. Appointments made by legislators.
(a) In any case where a legislator is called upon by law to appoint a member to a board or commission upon the recommendation of or in consultation with a third party, the recommendation or consultation is discretionary and is not binding upon the legislator. The third party must submit the recommendation or consultation at least 60 days prior to the expiration of the term or within 10 business days from the occurrence of a vacancy.
(b) In any case where a legislator is called upon by law to appoint a member to a board or commission from nominees provided by a third party, the third party must submit the nominees at least 60 days prior to the expiration of the term or within 10 business days from the occurrence of a vacancy. This subsection does not apply to nominations made under G.S. 120‑99(a) or G.S. 120‑100(b).
(c) Failure to submit the recommendation, consultation, or nomination within the time periods required under this section shall be deemed a waiver by the third party of the opportunity."
SECTION 1.3.(c) This section is effective when this act becomes law and applies to recommendations, consultations, and nominations made on or after that date.
allow attorneys' fees when the state is the prevailing party in certain civil actions and clarify and standardize the requirements to award ATTORNEYS' fees in actions involving the state
SECTION 1.4.(a) G.S. 6‑19.1 reads as rewritten:
"§ 6‑19.1.
Attorney's fees to parties appealing or defending against agency decision.in
certain actions involving the State.
(a) Prevailing Party Is Not the State. – In any civil action, other than an adjudication for the purpose of establishing or fixing a rate, or a disciplinary action by a licensing board, brought by the State or brought by a party who is contesting State action pursuant to G.S. 150B‑43 or any other appropriate provisions of law, unless the prevailing party is the State, the court may, in its discretion, allow the prevailing party to recover reasonable attorney's fees, including attorney's fees applicable to the administrative review portion of the case, in contested cases arising under Article 3 of Chapter 150B, to be taxed as court costs against the appropriate agency of the State if:
(1) The court finds that the agency acted without substantial justification in pressing its claim against the party; and
(2) The court finds that there are no special
circumstances that would make the award of attorney's fees unjust. The party
shall petition for the attorney's fees within 30 days following final
disposition of the case. The petition shall be supported by an affidavit
setting forth the basis for the request.
Nothing in this section subsection shall be
deemed to authorize the assessment of attorney's fees for the administrative
review portion of the case in contested cases arising under Article 9 of
Chapter 131E of the General Statutes.
Nothing in this section grants permission to bring an
action against an agency otherwise immune from suit or gives a right to bring
an action to a party who otherwise lacks standing to bring the action.
Any attorney's fees assessed against an agency of the
State under this section subsection shall be charged against
the operating expenses of the agency and shall not be reimbursed from any other
source.
(b) Expired.
(c) Prevailing Party Is the State. – In any civil action or other proceeding, the court must allow the State to recover reasonable attorneys' fees and costs if the State is the prevailing party and the claim or issue involves one or both of the following:
(1) Contesting the State's ability to construct transportation improvements.
(2) Seeking relief based on environmental impact.
Reasonable attorneys' fees include attorneys' fees applicable to any administrative portion of the case. The attorneys' fees must be taxed as court costs against any law firm seeking relief against the State. Contracts between the law firm and named parties in the action to reimburse the law firm for attorneys' fees are valid and enforceable. Law firms may avoid liability under this subsection if the named parties post a bond for the payment of attorneys' fees and costs in an amount determined by the presiding judge. Upon motion of either party, the presiding judge may adjust the amount of the required bond at reasonable times.
(d) Petition and Award. – The prevailing party must petition for the attorneys' fees within 30 days following final disposition of the case. The petition must be supported by an affidavit setting forth the basis for the request. When the presiding judge determines that an award of attorneys' fees is to be made under this section, the judge must issue a written order including the factual basis and amount of attorneys' fees to be awarded.
(e) No Grant of Jurisdiction. – Nothing in this section grants permission to bring an action against the State when otherwise immune from suit or gives a right to bring an action to a party who otherwise lacks standing to bring the action.
(f) Definitions. – The following definitions apply in this section:
(1) Law firm. – Any entity or individual providing legal services in the action against the State.
(2) State. – The State and its agencies as defined in G.S. 150B‑2(1a)."
SECTION 1.4.(b) This section becomes effective September 1, 2015, and applies to all actions or other proceedings filed on and after that date.
OCCUPATIONAL LICENSING BOARD INVESTIGATORS AND INSPECTORS
SECTION 1.5. Chapter 93B of the General Statutes is amended by adding a new section to read:
"§ 93B‑8.2. Prohibit licensees from serving as investigators.
No occupational licensing board shall contract with or employ a person licensed by the board to serve as an investigator or inspector if the licensee is actively practicing in the profession or occupation over which the board has jurisdiction. Nothing in this section shall prevent a board from employing licensees who are not otherwise employed in the same profession or occupation or for other purposes."
NO FISCAL NOTE REQUIRED FOR LESS STRINGENT RULES
SECTION 1.6.(a) G.S. 150B‑21.3A(d) reads as rewritten:
"(d) Timetable. – The Commission shall establish a schedule for the review and readoption of existing rules in accordance with this section on a decennial basis as follows:
…
(2) With regard to the readoption of rules as required
by sub‑subdivision (c)(2)g. of this section, once the final determination
report becomes effective, the Commission shall establish a date by which the
agency must readopt the rules. The Commission shall consult with the agency and
shall consider the agency's rule‑making priorities in establishing the
readoption date. The agency may amend a rule as part of the readoption process.
If a rule is readopted without substantive change, change or if the
rule is amended to impose a less stringent burden on regulated persons, the
agency is not required to prepare a fiscal note as provided by G.S. 150B‑21.4."
SECTION 1.6.(b) This section is effective when this act becomes law and applies to periodic review of existing rules occurring pursuant to G.S. 150B‑21.3A on or after that date.
APO TO MAKE RECOMMENDATIONS ON OCCUPATIONAL LICENSING BOARD CHANGES
SECTION 1.7. Pursuant to G.S. 120‑70.101(3a), the Joint Legislative Administrative Procedure Oversight Committee (APO) shall review the recommendations contained in the Joint Legislative Program Evaluation Oversight Committee's report, entitled "Occupational Licensing Agencies Should Not be Centralized, but Stronger Oversight is Needed," to determine the best way to accomplish the recommendations contained in the report and to improve oversight of occupational licensing boards. In conducting the review, APO shall consult with occupational licensing boards, licensees, associations representing licensees, the Department of Commerce, and other interested parties. The APO cochairs may establish subcommittees to assist with various parts of the review, including determining whether licensing authority should be continued for the 12 boards identified in the report. The APO shall propose legislation to the 2016 Regular Session of the 2015 General Assembly.
TECHNICAL CORRECTION
SECTION 1.8. G.S. 20‑116 reads as rewritten:
"§ 20‑116. Size of vehicles and loads.
…
(g) …
(3) A truck, trailer, or other vehicle:
a. Licensed vehicle licensed for
7,500 pounds or less gross vehicle weight and loaded with rock, gravel, stone,
or any other similar substance that could fall, blow, leak, or sift, or
licensed for any gross vehicle weight and loaded with sand; orsand,
b. Licensed for 7,500 pounds or less gross
vehicle weight and loaded with rock, gravel, stone, or any other similar
substance that could fall, blow, leak, sift, or drop;
shall not be driven or moved on any highway unless:
a. The height of the load against all four walls does not extend above a horizontal line six inches below the top when loaded at the loading point;
b. The load is securely covered by tarpaulin or some other suitable covering; or
c. The vehicle is constructed to prevent any of its load from falling, dropping, sifting, leaking, blowing, or otherwise escaping therefrom.
…."
PART II. BUSINESS REGULATION
MANUFACTURED HOME LICENSE/CRIMINAL HISTORY CHECK
SECTION 2.2. G.S. 143‑143.10A reads as rewritten:
"§ 143‑143.10A. Criminal history checks of applicants for licensure.
(a) Definitions. – The following definitions shall apply in this section:
(1) Applicant. – A person applying for initial licensure
as a manufactured home manufacturer, dealer, salesperson, salesperson
or set‑up contractor.
…
(b) All applicants for initial licensure shall consent to a criminal history record check. Refusal to consent to a criminal history record check may constitute grounds for the Board to deny licensure to an applicant. The Board shall ensure that the State and national criminal history of an applicant is checked. Applicants shall obtain criminal record reports from one or more reporting services designated by the Board to provide criminal record reports. Each applicant is required to pay the designated service for the cost of the criminal record report. In the alternative, the Board may provide to the North Carolina Department of Public Safety the fingerprints of the applicant to be checked, a form signed by the applicant consenting to the criminal record check and the use of fingerprints and other identifying information required by the State or National Repositories of Criminal Histories, and any additional information required by the Department of Public Safety. The Board shall keep all information obtained pursuant to this section confidential.
.…"
AMEND DEFINITION OF "EMPLOYEE" UNDER THE WORKERS' COMPENSATION ACT TO EXCLUDE VOLUNTEERS AND OFFICERS OF CERTAIN NONPROFIT CORPORATIONS AND ASSOCIATIONS
SECTION 2.3. G.S. 97‑2(2) reads as rewritten:
"§ 97‑2. Definitions.
When used in this Article, unless the context otherwise requires:
…
(2) Employee. – The term "employee" means every person engaged in an employment under any appointment or contract of hire or apprenticeship, express or implied, oral or written, including aliens, and also minors, whether lawfully or unlawfully employed, but excluding persons whose employment is both casual and not in the course of the trade, business, profession, or occupation of his employer, and as relating to those so employed by the State, the term "employee" shall include all officers and employees of the State, including such as are elected by the people, or by the General Assembly, or appointed by the Governor to serve on a per diem, part‑time or fee basis, either with or without the confirmation of the Senate; as relating to municipal corporations and political subdivisions of the State, the term "employee" shall include all officers and employees thereof, including such as are elected by the people. The term "employee" shall include members of the North Carolina National Guard while on State active duty under orders of the Governor and members of the North Carolina State Defense Militia while on State active duty under orders of the Governor. The term "employee" shall include deputy sheriffs and all persons acting in the capacity of deputy sheriffs, whether appointed by the sheriff or by the governing body of the county and whether serving on a fee basis or on a salary basis, or whether deputy sheriffs serving upon a full‑time basis or a part‑time basis, and including deputy sheriffs appointed to serve in an emergency, but as to those so appointed, only during the continuation of the emergency. The sheriff shall furnish to the board of county commissioners a complete list of all deputy sheriffs named or appointed by him immediately after their appointment and notify the board of commissioners of any changes made therein promptly after such changes are made. Any reference to an employee who has been injured shall, when the employee is dead, include also the employee's legal representative, dependents, and other persons to whom compensation may be payable: Provided, further, that any employee, as herein defined, of a municipality, county, or of the State of North Carolina, while engaged in the discharge of the employee's official duty outside the jurisdictional or territorial limits of the municipality, county, or the State of North Carolina and while acting pursuant to authorization or instruction from any superior officer, shall have the same rights under this Article as if such duty or activity were performed within the territorial boundary limits of their employer.
Every Except as otherwise
provided herein, every executive officer elected or appointed and empowered
in accordance with the charter and bylaws of a corporation shall be considered
as an employee of such corporation under this Article.
Any such executive officer of a corporation may, notwithstanding any other provision of this Article, be exempt from the coverage of the corporation's insurance contract by such corporation's specifically excluding such executive officer in such contract of insurance, and the exclusion to remove such executive officer from the coverage shall continue for the period such contract of insurance is in effect, and during such period such executive officers thus exempted from the coverage of the insurance contract shall not be employees of such corporation under this Article.
All county agricultural extension service employees who do not receive official federal appointments as employees of the United States Department of Agriculture and who are field faculty members with professional rank as designated in the memorandum of understanding between the North Carolina Agricultural Extension Service, North Carolina State University, A & T State University, and the boards of county commissioners shall be deemed to be employees of the State of North Carolina. All other county agricultural extension service employees paid from State or county funds shall be deemed to be employees of the county board of commissioners in the county in which the employee is employed for purposes of workers' compensation.
The term "employee" shall also include members of the Civil Air Patrol currently certified pursuant to G.S. 143B‑1031(a) when performing duties in the course and scope of a State‑approved mission pursuant to Subpart C of Part 5 of Article 13 of Chapter 143B of the General Statutes.
"Employee" shall not include any person performing voluntary service as a ski patrolman who receives no compensation for such services other than meals or lodging or the use of ski tow or ski lift facilities or any combination thereof.
"Employee" shall not include any person elected or appointed and empowered as an executive officer, director, or committee member under the charter, articles, or bylaws of a nonprofit corporation subject to Chapter 47A, 47C, 47F, 55A, or 59B of the General Statutes, or any organization exempt from federal income tax under section 501(c)(3) of the Internal Revenue Code, who performs only voluntary service for the nonprofit corporation, provided that the person receives no remuneration for the voluntary service other than reasonable reimbursement for expenses incurred in connection with the voluntary service. When a nonprofit corporation as described herein employs one or more persons who do receive remuneration other than reasonable reimbursement for expenses, then any volunteer officers, directors, or committee members excluded from the definition of "employee" by operation of this paragraph shall be counted as employees for the sole purpose of determining the number of persons regularly employed in the same business or establishment pursuant to G.S. 97‑2(1). Other than for the limited purpose of determining the number of persons regularly employed in the same business or establishment, such volunteer nonprofit officers, directors, or committee members shall not be "employees" under the Act. Nothing herein shall prohibit a nonprofit corporation as described herein from voluntarily electing to provide for workers' compensation benefits in the manner provided in G.S. 97‑93 for volunteer officers, directors, or committee members excluded from the definition of "employee" by operation of this paragraph. This paragraph shall not apply to any volunteer firefighter, volunteer member of an organized rescue squad, an authorized pickup firefighter when that individual is engaged in emergency fire suppression activities for the North Carolina Forest Service, a duly appointed and sworn member of an auxiliary police department organized pursuant to G.S. 160A‑282, or a senior member of the State Civil Air Patrol functioning under Subpart C of Part 5 of Article 13 of Chapter 143B of the General Statutes, even if such person is elected or appointed and empowered as an executive officer, director, or committee member under the charter, articles, or bylaws of a nonprofit corporation as described herein.
Any sole proprietor or partner of a business or any member of a limited liability company may elect to be included as an employee under the workers' compensation coverage of such business if he is actively engaged in the operation of the business and if the insurer is notified of his election to be so included. Any such sole proprietor or partner or member of a limited liability company shall, upon such election, be entitled to employee benefits and be subject to employee responsibilities prescribed in this Article.
Employee" "Employee"
shall include an authorized pickup firefighter of the North Carolina Forest
Service of the Department of Agriculture and Consumer Services when that
individual is engaged in emergency fire suppression activities for the North
Carolina Forest Service. As used in this section, "authorized pickup
firefighter" means an individual who has completed required fire
suppression training as a wildland firefighter and who is available as needed
by the North Carolina Forest Service for emergency fire suppression activities,
including immediate dispatch to wildfires and standby for initial attack on
fires during periods of high fire danger.
It shall be a rebuttable presumption that the term "employee" shall not include any person performing services in the sale of newspapers or magazines to ultimate consumers under an arrangement whereby the newspapers or magazines are to be sold by that person at a fixed price and the person's compensation is based on the retention of the excess of the fixed price over the amount at which the newspapers or magazines are charged to the person."
PART III. STATE AND LOCAL GOVERNMENT REGULATION
REDUCE STATE AGENCY MOBILE DEVICE REPORTING FREQUENCY
SECTION 3.1. Subsection 6A.14(a) of S.L. 2011‑145 reads as rewritten:
"SECTION 6A.14.(a) Every executive branch agency within State government shall develop a policy to limit the issuance and use of mobile electronic devices to the minimum required to carry out the agency's mission. By September 1, 2011, each agency shall provide a copy of its policy to the Chairs of the Appropriations Committee and the Appropriations Subcommittee on General Government of the House of Representatives, the Chairs of the Appropriations/Base Budget Committee and the Appropriations Committee on General Government and Information Technology of the Senate, the Chairs of the Joint Legislative Oversight Committee on Information Technology, the Fiscal Research Division, and the Office of State Budget and Management.
State‑issued mobile electronic devices shall be used only for State business. Agencies shall limit the issuance of cell phones, smart phones, and any other mobile electronic devices to employees for whom access to a mobile electronic device is a critical requirement for job performance. The device issued and the plan selected shall be the minimum required to support the employees' work requirements. This shall include considering the use of pagers in lieu of a more sophisticated device. The requirement for each mobile electronic device issued shall be documented in a written justification that shall be maintained by the agency and reviewed annually. All State agency heads, in consultation with the Office of Information Technology Services and the Office of State Budget and Management, shall document and review all authorized cell phone, smart phone, and other mobile electronic communications device procurement, and related phone, data, Internet, and other usage plans for and by their employees. Agencies shall conduct periodic audits of mobile device usage to ensure that State employees and contractors are complying with agency policies and State requirements for their use.
Beginning October 1, 2011, each agency shall report quarterly
annually to the Chairs of the House of Representatives Committee on
Appropriations and the House of Representatives Subcommittee on General
Government, the Chairs of the Senate Committee on Appropriations and the Senate
Appropriations Committee on General Government and Information Technology, the
Joint Legislative Oversight Committee on Information Technology, the Fiscal Research
Division, and the Office of State Budget and Management on the following:
(1) Any changes to agency policies on the use of mobile devices.
(2) The number and types of new devices issued since the last report.
(3) The total number of mobile devices issued by the agency.
(4) The total cost of mobile devices issued by the agency.
(5) The number of each type of mobile device issued, with the total cost for each type."
GOOD SAMARITAN EXPANSION
SECTION 3.3.(a) G.S. 14‑56 reads as rewritten:
"§ 14‑56. Breaking or entering into or breaking out of railroad cars, motor vehicles, trailers, aircraft, boats, or other watercraft.
(a) If any person, with intent to commit any felony or larceny therein, breaks or enters any railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind, containing any goods, wares, freight, or other thing of value, or, after having committed any felony or larceny therein, breaks out of any railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind containing any goods, wares, freight, or other thing of value, that person is guilty of a Class I felony. It is prima facie evidence that a person entered in violation of this section if he is found unlawfully in such a railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft.
(b) It shall not be a violation of this section for any person to break or enter any railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind to provide assistance to a person inside the railroad car, motor vehicle, trailer, aircraft, boat, or watercraft of any kind if one or more of the following circumstances exist:
(1) The person acts in good faith to access the person inside the railroad car, motor vehicle, trailer, aircraft, boat, or watercraft of any kind in order to provide first aid or emergency health care treatment or because the person inside is, or is in imminent danger of becoming, unconscious, ill, or injured.
(2) It is reasonably apparent that the circumstances require prompt decisions and actions in medical, other health care, or other assistance for the person inside the railroad car, motor vehicle, trailer, aircraft, boat, or watercraft of any kind.
(3) The necessity of immediate health care treatment or removal of the person from the railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind is so reasonably apparent that any delay in the rendering of treatment or removal would seriously worsen the physical condition or endanger the life of the person."
SECTION 3.3.(b) This section becomes effective September 1, 2015, and applies to offenses committed on or after that date.
SECTION 3.4.(a) Chapter 1 of the General Statutes is amended by adding a new Article to read:
"Article 43F.
"Immunity for Damage to Vehicle.
"§ 1‑539.27. Immunity from civil liability for damage to railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft necessary for assistance.
Any person who enters or attempts to enter any railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind shall not be liable in civil damages for any damage to the railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind if one or more of the following circumstances exist:
(1) The person acts in good faith to access a person inside the railroad car, motor vehicle, trailer, aircraft, boat, or watercraft of any kind in order to provide first aid or emergency health care treatment or because the person inside is, or is in imminent danger of becoming, unconscious, ill, or injured.
(2) It is reasonably apparent that the circumstances require prompt decisions and actions in medical care, other health care, or other assistance.
(3) The necessity of immediate health care treatment or removal of the person from the railroad car, motor vehicle, trailer, aircraft, boat, or other watercraft of any kind is so reasonably apparent that any delay in the rendering of treatment or removal would seriously worsen the physical condition or endanger the life of the person.
This section shall not apply to any acts of gross negligence, wanton conduct, or intentional wrongdoing."
SECTION 3.4.(b) This section becomes effective September 1, 2015, and applies to causes of action arising on or after that date.
AUTHORIZE DMV TO ISSUE PERMANENT PLATES FOR TRAILERS ATTACHED TO MOTORCYCLES
SECTION 3.5.(a) G.S. 20‑84(b) is amended by adding a new subdivision to read:
"(20) A trailer used as an attachment to the rear of a motorcycle."
SECTION 3.5.(b) This section becomes effective July 1, 2015.
STATUS FOR PROVIDERS OF MH/DD/SA SERVICES WHO ARE NATIONALLY ACCREDITED
SECTION 3.7. G.S. 122C‑81 reads as rewritten:
"§ 122C‑81. National accreditation benchmarks.
(a) As used in this section, the term:
(1) "National accreditation" applies to accreditation by an entity approved by the Secretary that accredits mental health, developmental disabilities, and substance abuse services.
(2) "Provider" applies to only those providers of services, including facilities, requiring national accreditation, which services are designated by the Secretary pursuant to subsection (b) of this section.
(b) The Secretary, through the Medicaid State Plan, Medicaid waiver, or rules adopted by the Secretary, shall designate the mental health, developmental disabilities, and substance abuse services that require national accreditation. In accordance with rules of the Commission, the Secretary may exempt a provider that is accredited under this section and in good standing with the national accrediting agency from undergoing any routine monitoring that is duplicative of the oversight by the national accrediting agency.
…
(e) The Commission may adopt rules establishing a procedure by which a provider that is accredited under this section and in good standing with the national accrediting agency may be exempt from undergoing any routine monitoring that is duplicative of the oversight by the national accrediting agency. Any provider shall continue to be subject to inspection by the Secretary, provided the inspection is not duplicative of inspections required by the national accrediting agency. Rules adopted under this subsection may not waive any requirements that may be imposed under federal law."
CLARIFY THAT WHEN A NEW PERMIT OR TRANSITIONAL PERMIT IS ISSUED FOR AN ESTABLISHMENT, ANY PREVIOUS PERMIT FOR THAT SAME ESTABLISHMENT IN THAT LOCATION BECOMES VOID
SECTION 3.8. G.S. 130A‑248(c) reads as rewritten:
"(c) If ownership of an establishment is
transferred or the establishment is leased, the new owner or lessee shall apply
for a new permit. The new owner or lessee may also apply for a transitional
permit. A transitional permit may be issued upon the transfer of ownership or
lease of an establishment to allow the correction of construction and equipment
problems that do not represent an immediate threat to the public health. Upon
issuance of a new permit or a transitional permit for anthe same establishment,
any previously issued permit for an establishment in that location becomes
void. This subsection does not prohibit issuing more than one owner or
lessee a permit for the same location if (i) more than one establishment is
operated in the same physical location and (ii) each establishment satisfies
all of the rules and requirements of subsection (g) of this section."
open and fair competition with respect to the materials used in wastewater, stormwater, and other water projects
SECTION 3.9.(a) Article 8 of Chapter 143 of the General Statutes is amended by adding a new section to read:
"§ 143‑129.10. Public entities shall consider all acceptable piping materials in State‑funded water, wastewater, or stormwater projects.
(a) Consideration of All Acceptable Piping Materials Required. – A public entity shall consider all acceptable piping materials before determining which piping material should be used in the construction, development, financing, maintaining, rebuilding, improving, repairing, procuring, or operating of a water, wastewater, or stormwater drainage project that is funded in whole or in part with State funds unless sound engineering practices, as determined by a professional engineer licensed to practice pursuant to Chapter 89C of the General Statutes, suggest that one type of acceptable piping material is more suitable for a particular project.
(b) Definitions. – The following definitions apply in this section:
(1) Acceptable piping material. – Piping material that meets or exceeds the standards issued by the American Society for Testing and Materials, the American Water Works Association, or the American Association of State Highway & Transportation Officials.
(2) Public entity. – A State agency, county, city, sanitary district created under Part 2 of Article 2 of Chapter 130A of the General Statutes, authority created under Article 1 of Chapter 162A of the General Statutes, metropolitan sewerage district created under Article 5 of Chapter 162A of the General Statutes, county water and sewer district created under Article 6 of Chapter 162A of the General Statutes, or any other political subdivision of the State."
SECTION 3.9.(b) This section becomes effective October 1, 2015, and applies to projects initiated on or after that date.
LICENSED SURVEYOR TO MARK BOUNDARIES OF STATE PROPERTIES
SECTION 3.10.(a) G.S. 146‑33 reads as rewritten:
"§ 146‑33. State agencies to locate and mark boundaries of lands.
(a) Every State agency shall locate and identify, and shall mark and keep marked, the boundaries of all lands allocated to that agency or under its control. The Department of Administration shall locate and identify, and mark and keep marked, the boundaries of all State lands not allocated to or under the control of any other State agency. The chief administrative officer of every State agency is authorized to contract with the Division of Adult Correction of the Department of Public Safety for the furnishing, upon such conditions as may be agreed upon from time to time between the Division of Adult Correction of the Department of Public Safety and the chief administrative officer of that agency, of prison labor for use where feasible in the performance of these duties.
(b) If a State agency contracts with a person who is not employed by the State to mark or keep marked the boundaries of lands allocated to that agency, or under that agency's control, that State agency shall use only a licensed professional engineer or surveyor."
SECTION 3.10.(b) This section becomes effective October 1, 2015, and applies to surveys or markings conducted on or after that date.
AMEND UNDERGROUND DAMAGE PREVENTION REVIEW BOARD, ENFORCEMENT, AND CIVIL PENALTIES
SECTION 3.12. G.S. 87‑129 reads as rewritten:
"§ 87‑129. Underground Damage Prevention Review Board; enforcement; civil penalties.
(a) The Notification Center shall establish an There
is hereby established the Underground Damage Prevention Review Board to
review reports of alleged violations of this Article. The members of the Board
shall be appointed by the Governor. The Board shall consist of the following
members:15 members as follows:
(1) A representative from the North Carolina Department of Transportation;
(2) A representative from a facility contract locator;
(3) A representative from the Notification Center;
(4) A representative from an electric public utility;
(5) A representative from the telecommunications industry;
(6) A representative from a natural gas utility;
(7) A representative from a hazardous liquid transmission pipeline company;
(8) A representative recommended by the League of Municipalities;
(9) A highway contractor licensed under G.S. 87‑10(b)(2) who does not own or operate facilities;
(10) A public utilities contractor licensed under G.S. 87‑10(b)(3) who does not own or operate facilities;
(11) A surveyor licensed under Chapter 89C of the General Statutes;
(12) A representative from a rural water system;
(13) A representative from an investor‑owned water system;
(14) A representative from an electric membership corporation; and
(15) A representative from a cable company.
(a1) Each member of the Board shall be appointed for a term of four years. Members of the Board may serve no more than two consecutive terms. Vacancies in appointments made by the Governor occurring prior to the expiration of a term shall be filled by appointment for the unexpired term.
(a2) No member of the Board may serve on a case where there would be a conflict of interest.
(a3) The Governor may remove any member at any time for cause.
(a4) Eight members of the Board shall constitute a quorum.
(a5) The Governor shall designate one member of the Board as chair.
(a6) The Board may adopt rules to implement this Article.
(b) The Notification Center shall transmit all reports
of alleged violations of this Article to the Board, including any information
received by the Notification Center regarding the report. The Board shall
meet at least quarterly to review all reports filed pursuant to G.S. 87‑120(e).
The Board shall act as an arbitrator between the parties to the report. If,
after reviewing the report and any accompanying information, the Board
determines that a violation of this Article has occurred, the Board shall
notify the violating party in writing of its determination and the recommended
penalty. The violating party
(b1) The Board shall review all reports of alleged violations of this Article and accompanying information. If the Board determines that a person has violated any provision of this Article, the Board shall determine the appropriate action or penalty to impose for each such violation. Actions and penalties may include training, education, and a civil penalty not to exceed two thousand five hundred dollars ($2,500). The Board shall notify each person who is determined to have violated this Article in writing of the Board's determination and the Board's recommended action or penalty. A person determined to be in violation of this Article may request a hearing before the Board, after which the Board may reverse or uphold its original finding. If the Board recommends a penalty, the Board shall notify the Utilities Commission of the recommended penalty, and the Utilities Commission shall issue an order imposing the penalty.
(c) A party person determined by the
Board under subsection (b) (b1) of this section to have violated
this Article may initiate appeal the Board's determination by
initiating an arbitration proceeding before the Utilities Commission. Commission
within 30 days of the Board's determination. If the violating party elects
to initiate an arbitration proceeding, the violating party shall pay a filing
fee of two hundred fifty dollars ($250.00) to the Utilities Commission, and the
Utilities Commission shall open a docket regarding the report. The Utilities
Commission shall direct the parties enter into an arbitration process. The
parties shall be responsible for selecting and contracting with the arbitrator.
Upon completion of the arbitration process, the Utilities Commission shall
issue an order encompassing the outcome of the binding arbitration process,
including a determination of fault, a penalty, and assessing the costs of
arbitration to the non‑prevailing party. Any party may
(c1) A person may timely appeal an order
issued by the Utilities Commission pursuant to this section to the superior
court division of the General Court of Justice in the county where the alleged
violation of this Article occurred or in Wake County, for trial de novo. de
novo within 30 days of entry of the Utilities Commission's order. The
authority granted to the Utilities Commission within this section is limited to
this section and does not grant the Utilities Commission any authority that
they are not otherwise granted under Chapter 62 of the General Statutes.
(d) Any person who violates any provision of this
Article shall be subject to a penalty as set forth in this subsection. The
provisions of this Article do not affect any civil remedies for personal injury
or property damage otherwise available to any person, except as otherwise
specifically provided for in this Article. The penalty provisions of this
Article are cumulative to and not in conflict with provisions of law with
respect to civil remedies for personal injury or property damage. The clear
proceeds of any civil penalty assessed under this section shall be used as
provided in Section 7(a) of Article IX of the North Carolina Constitution. The
penalties for a violation of this Article shall be as follows:In any
arbitration proceeding before the Utilities Commission, any actions and
penalties assessed against any person for violation of this Article shall
include the actions and penalties set out in subsection (b1) of this section.
(1) If the violation was the result of
negligence, the penalty shall be a requirement of training, a requirement of
education, or both.
(2) If the violation was the result of gross
negligence, the penalty shall be a civil penalty of one thousand dollars
($1,000), a requirement of training, a requirement of education, or a
combination of the three.
(3) If the violation was the result of
willful or wanton negligence or intentional conduct, the penalty shall be a
civil penalty of two thousand five hundred dollars ($2,500), a requirement of
training, and a requirement of education."
CONFORM NORTH CAROLINA ALL‑TERRAIN VEHICLE LAWS TO NATIONAL SAFETY AND DESIGN STANDARDS FOR YOUTH OPERATORS
SECTION 3.13.(a) G.S. 20‑171.15 reads as rewritten:
"§ 20‑171.15. Age restrictions.
(a) It is unlawful for any parent or legal guardian of
a person less than eightsix years of age to knowingly permit that
person to operate an all‑terrain vehicle.
(b) It is unlawful for any parent or legal
guardian of a person less than 12 years of age to knowingly permit that person
to operate an all‑terrain vehicle with an engine capacity of 70 cubic
centimeter displacement or greater.
(c) It is unlawful for any parent or legal guardian of
a person less than 16 years of age to knowingly permit that person to operate
an all‑terrain vehicle with an engine capacity greater than 90 cubic
centimeter displacement.in violation of the Age Restriction Warning
Label affixed by the manufacturer as required by the applicable American
National Standards Institute/Specialty Vehicle Institute of America (ANSI/SVIA)
design standard.
(d) It is unlawful for any parent or legal guardian of a person less than 16 years of age to knowingly permit that person to operate an all‑terrain vehicle unless the person is under the continuous visual supervision of a person 18 years of age or older while operating the all‑terrain vehicle.
(e) Subsections (b) and Subsection (c)
of this section do does not apply to any parent or legal guardian
of a person born on or before August 15, 1997, who permits that person to
operate an all‑terrain vehicle and who establishes proof that the parent
or legal guardian owned the all‑terrain vehicle prior to August 15, 2005."
SECTION 3.13.(b) G.S. 20‑171.17 reads as rewritten:
"§ 20‑171.17. Prohibited acts by sellers.
No person shall knowingly sell or offer to sell an all‑terrain vehicle:
(1) For use by a person under the age of eightsix
years.
(2) With an engine capacity of 70 cubic centimeter
displacement or greater for use by a person less than 12 years of age.In
violation of the Age Restriction Warning Label affixed by the manufacturer as
required by the applicable American National Standards Institute/Specialty
Vehicle Institute of America (ANSI/SVIA) design standard for use by a person
less than 16 years of age.
(3) With an engine capacity of greater than
90 cubic centimeter displacement for use by a person less than 16 years of age."
PART IV. ENVIRONMENTAL AND NATURAL RESOURCES REGULATION
ENVIRONMENTAL SELF‑AUDIT PRIVILEGE AND LIMITED IMMUNITY
SECTION 4.1.(a) Chapter 8 of the General Statutes is amended by adding a new Part to read:
"Part 7D. Environmental Audit Privilege and Limited Immunity.
"§ 8‑58.50. Purpose.
(a) In order to encourage owners and operators of facilities and persons conducting activities regulated under those portions of the General Statutes set forth in G.S. 8‑58.52, or conducting activities regulated under other environmental laws, to conduct voluntary internal environmental audits of their compliance programs and management systems and to assess and improve compliance with statutes, an environmental audit privilege is recognized to protect the confidentiality of communications relating to voluntary internal environmental audits.
(b) Notwithstanding any other provisions of law, nothing in this Part shall be construed to protect owners and operators of facilities and regulated persons from a criminal investigation or prosecution carried out by any appropriate governmental entity.
(c) Notwithstanding any other provision of law, any privilege granted by this Part shall apply only to those communications, oral or written, pertaining to and made in connection with the environmental audit and shall not apply to the facts relating to the violation itself.
"§ 8‑58.51. Definitions.
The following definitions apply in this Part:
(1) "Department" means the Department of Environment and Natural Resources.
(2) "Enforcement agencies" means the Department, any other agency of the State, and units of local government responsible for enforcement of environmental laws.
(3) "Environmental audit" means a voluntary, internal evaluation or review of one or more facilities or an activity at one or more facilities regulated under federal, State, regional, or local environmental law, or of compliance programs, or management systems related to the facility or activity if designed to identify and prevent noncompliance and to improve compliance with these laws. For the purposes of this Part, an environmental audit does not include an environmental site assessment of a facility conducted solely in anticipation of the purchase, sale, or transfer of the business or facility. An environmental audit may be conducted by the owner or operator, the parent corporation of the owner or operator or by their officers or employees, or by independent contractors. An environmental audit must be a discrete activity with a specified beginning date and scheduled ending date reflecting the auditor's bona fide intended completion schedule.
(4) "Environmental audit report" means a document marked or identified as such with a completion date existing either individually or as a compilation prepared in connection with an environmental audit. An environmental audit report may include field notes and records of observations, findings, opinions, suggestions, recommendations, conclusions, drafts, memoranda, drawings, photographs, computer‑generated or electronically recorded information, maps, charts, graphs, and surveys, provided the supporting information is collected or developed for the primary purpose and in the course of an environmental audit. An environmental audit report, when completed, may include all of the following components:
a. An audit report prepared by an auditor, which may include the scope and date of the audit and the information gained in the audit, together with exhibits and appendices and may include conclusions, recommendations, exhibits, and appendices.
b. Memoranda and documents analyzing any portion of the audit report or issues relating to the implementation of an audit report.
c. An implementation plan that addresses correcting past noncompliance, improving current compliance, or preventing future noncompliance.
(5) "Environmental laws" means all provisions of federal, State, and local laws, rules, and ordinances pertaining to environmental matters.
"§ 8‑58.52. Applicability.
This Part applies to activities regulated under environmental laws, including all of the following provisions of the General Statutes, and rules adopted thereunder:
(1) Article 7 of Chapter 74.
(2) Chapter 104E.
(3) Article 25 of Chapter 113.
(4) Articles 1, 4, and 7 of Chapter 113A.
(5) Article 9 of Chapter 130A.
(6) Articles 21, 21A, and 21B of Chapter 143.
(7) Part 1 of Article 7 of Chapter 143B.
"§ 8‑58.53. Environmental audit report; privilege.
(a) An environmental audit report or any part of an environmental audit report is privileged and, therefore, immune from discovery and is not admissible as evidence in civil or administrative proceedings, except as provided in G.S. 8‑58.54 and G.S. 8‑58.56. Provided, however, all of the following documents are exempt from the privilege established by this Part:
(1) Information obtained by observation of an enforcement agency.
(2) Information obtained from a source independent of the environmental audit.
(3) Documents, communication, data, reports, or other information required to be collected, maintained, otherwise made available, or reported to an enforcement agency or any other entity by environmental laws, permits, orders, consent agreements, or as otherwise provided by law.
(4) Documents prepared either prior to the beginning of the environmental audit or subsequent to the completion date of the audit report and, in all cases, any documents prepared independent of the audit or audit report.
(5) Documents prepared as a result of multiple or continuous self‑auditing conducted in an effort to intentionally avoid liability for violations.
(6) Information that is knowingly misrepresented or misstated or that is knowingly deleted or withheld from an environmental audit report, whether or not included in a subsequent environmental audit report.
(7) Information in instances where the material shows evidence of noncompliance with environmental laws, permits, orders, consent agreements, and the owner or operator failed to either promptly take corrective action or eliminate any violation of law identified during the environmental audit within a reasonable period of time.
(b) If an environmental audit report or any part of an environmental audit report is subject to the privilege provided for in subsection (a) of this section, no person who conducted or participated in the audit or who significantly reviewed the audit report may be compelled to testify regarding the audit report or a privileged part of the audit report except as provided for in G.S. 8‑58.53(d), 8‑58.54, or 8‑58.56.
(c) Nothing in this Part shall be construed to restrict a party in a proceeding before the Industrial Commission from obtaining or discovering any evidence necessary or appropriate for the proof of any issue pending in an action before the Commission, regardless of whether evidence is privileged pursuant to this Part. Further, nothing in this Part shall be construed to prevent the admissibility of evidence that is otherwise relevant and admissible in a proceeding before the Industrial Commission, regardless of whether the evidence is privileged pursuant to this Part. Provided, however, the Commission, upon motion made by a party to the proceeding, may issue appropriate protective orders preventing disclosure of information outside of the Commission's proceeding.
(d) Nothing in this Part shall be construed to circumvent the employee protection provisions provided by federal or State law.
(e) The privilege created by this Part does not apply to criminal investigations or proceedings. Where an audit report is obtained, reviewed, or used in a criminal proceeding, the privilege created by this Part shall continue to apply and is not waived in civil and administrative proceedings and is not discoverable or admissible in civil or administrative proceedings even if disclosed during a criminal proceeding.
"§ 8‑58.54. Waiver of privilege.
(a) The privilege established under G.S. 8‑58.53 does not apply to the extent that it is expressly waived in writing by the owner or operator of a facility at which an environmental audit was conducted and who prepared or caused to be prepared the audit report as a result of the audit.
(b) The audit report and information generated by the audit may be disclosed without waiving the privilege established under G.S. 8‑58.53 to all of the following persons:
(1) A person employed by the owner or operator or the parent corporation of the audited facility.
(2) A legal representative of the owner or operator or parent corporation.
(3) An independent contractor retained by the owner or operator or parent corporation to conduct an audit on or to address an issue or issues raised by the audit.
(c) Disclosure of an audit report or information generated by the audit under all of the following circumstances shall not constitute a waiver of the privilege established under G.S. 8‑58.53:
(1) Disclosure made under the terms of a confidentiality agreement between the owner or operator of the facility audited and a potential purchaser of the business or facility audited.
(2) Disclosure made under the terms of a confidentiality agreement between governmental officials and the owner or operator of the facility audited.
(3) Disclosure made under the terms of a confidentiality agreement between a customer, lending institution, or insurance company with an existing or proposed relationship with the facility.
"§ 8‑58.55. Notification of audit.
In order to assert the privilege established under G.S. 8‑58.53, the owner or operator of the facility conducting the environmental audit shall, upon inspection of the facility by an enforcement agency, or no later than 10 working days after completion of an agency's inspection, notify the enforcement agency of the existence of any audit relevant to the subject of the agency's inspection, as well as the beginning date and completion date of that audit. Any environmental audit report shall include a signed certification from the owner or operator of the facility that documents the date the audit began and the completion date of the audit.
"§ 8‑58.56. Revocation of privilege in civil and administrative proceedings.
In a civil or administrative proceeding, an enforcement agency may seek by motion a declaratory ruling on the issue of whether an environmental audit report is privileged. The court shall revoke the privilege established under G.S. 8‑58.53 for an audit report if the factors set forth in this section apply. In a civil proceeding, the court, after an in camera review, shall revoke the privilege established under G.S. 8‑58.53 if the court determines that disclosure of the environmental audit report was sought after the effective date of this Part and either of the following apply:
(1) The privilege is asserted for purposes of deception or evasion.
(2) The material shows evidence of significant noncompliance with applicable environmental laws; the owner or operator of the facility has not promptly initiated and pursued with diligence appropriate action to achieve compliance with these environmental laws or has not made reasonable efforts to complete any necessary permit application; and, as a result, the owner or operator of the facility did not or will not achieve compliance with applicable environmental laws or did not or will not complete the necessary permit application within a reasonable period of time.
"§ 8‑58.57. Privilege in criminal proceedings.
The privilege established under G.S. 8‑58.53 is not applicable in any criminal proceeding.
"§ 8‑58.58. Burden of proof.
A party asserting the privilege established under G.S. 8‑58.53 has the burden of proving that (i) the materials claimed as privileged constitute an environmental audit report as defined by this Part and (ii) compliance has been achieved or will be achieved within a reasonable period of time. A party seeking disclosure under G.S. 8‑58.56 has the burden of proving the condition for disclosure set forth in that section.
"§ 8‑58.59. Stipulations; declaratory rulings.
The parties to a proceeding may at any time stipulate to entry of an order directing that specific information contained in an environmental audit report is or is not subject to the privilege. In the absence of an ongoing proceeding, where the parties are not in agreement, an enforcement agency may seek a declaratory ruling from a court on the issue of whether the materials are privileged under G.S. 8‑58.53 and whether the privilege, if existing, should be revoked pursuant to G.S. 8‑58.56.
"§ 8‑58.60. Construction of Part.
Nothing in this Part limits, waives, or abrogates any of the following:
(1) The scope or nature of any statutory or common law privilege, including the work‑product privilege or the attorney‑client privilege.
(2) Any existing ability or authority under State law to challenge privilege.
(3) An enforcement agency's ability to obtain or use documents or information that the agency otherwise has the authority to obtain under State law adopted pursuant to federally delegated programs.
"§ 8‑58.61. Voluntary disclosure; limited immunity from civil and administrative penalties and fines.
(a) An owner or operator of a facility is immune from imposition of civil and administrative penalties and fines for a violation of environmental laws voluntarily disclosed subject to the requirements and criteria set forth in this section. Provided, however, that waiver of penalties and fines shall not be granted until the applicable enforcement agency has certified that the violation was corrected within a reasonable period of time. If compliance is not certified by the enforcement agency, the enforcement agency shall retain discretion to assess penalties and fines for the violation.
(b) If a person or entity makes a voluntary disclosure of a violation of environmental laws discovered through performance of an environmental audit, that person has the burden of proving (i) that the disclosure is voluntary by establishing the elements set forth in subsection (c) of this section and (ii) that the person is therefore entitled to immunity from any administrative or civil penalties associated with the issues disclosed. Nothing in this section may be construed to provide immunity from criminal penalties.
(c) For purposes of this section, disclosure is voluntary if all of the following criteria are met:
(1) The disclosure is made within 14 days following a reasonable investigation of the violation's discovery through the environmental audit.
(2) The disclosure is made to an enforcement agency having regulatory authority over the violation disclosed.
(3) The person or entity making the disclosure initiates an action to resolve the violation identified in the disclosure in a diligent manner.
(4) The person or entity making the disclosure cooperates with the applicable enforcement agency in connection with investigation of the issues identified in the disclosure.
(5) The person or entity making the disclosure diligently pursues compliance and promptly corrects the noncompliance within a reasonable period of time.
(d) A disclosure is not voluntary for purposes of this section if any of the following factors apply:
(1) Specific permit conditions require monitoring or sampling records and reports or assessment plans and management plans to be maintained or submitted to the enforcement agency pursuant to an established schedule.
(2) Environmental laws or specific permit conditions require notification of releases to the environment.
(3) The violation was committed intentionally, willfully, or through criminal negligence by the person or entity making the disclosure.
(4) The violation was not corrected in a diligent manner.
(5) The violation posed or poses a significant threat to public health, safety, and welfare; the environment; and natural resources.
(6) The violation occurred within one year of a similar prior violation at the same facility, and immunity from civil and administrative penalties was granted by the applicable enforcement agency for the prior violation.
(7) The violation has resulted in a substantial economic benefit to the owner or operator of the facility.
(8) The violation is a violation of the specific terms of a judicial or administrative order.
(e) If a person meets the burden of proving that the disclosure is voluntary, the burden shifts to the enforcement agency to prove that the disclosure was not voluntary, based upon the factors set forth in this section. The person claiming immunity from civil or administrative penalties or fines under this section retains the ultimate burden of proving the violations were voluntarily disclosed.
(f) A voluntary disclosure made pursuant to this section is subject to disclosure pursuant to the Public Records Act in accordance with the provisions of Chapter 132 of the General Statutes.
"§ 8‑58.62. Additional limitations on exercise of privilege or immunity.
An owner or operator of a facility who makes a voluntary disclosure of a violation of environmental laws discovered through performance of an environmental audit shall only be entitled to exercise of the privilege or immunity established by this Part once in a two‑year period, not more than twice in a five‑year period, and not more than three times in a 10‑year period.
"§ 8‑58.63. Preemption of local laws.
No local law, rule, ordinance, or permit condition may circumvent or limit the privilege established by this Part or the exercise of the privileges or the presumption and immunity established by this Part."
SECTION 4.1.(b) This section becomes effective July 1, 2015, and applies to environmental audits, as defined in G.S. 8‑58.51, as enacted by subsection (a) of this section, that are conducted on or after that date.
REPEAL RECYCLING REQUIREMENTS FOR DISCARDED COMPUTER EQUIPMENT AND TELEVISIONS
SECTION 4.2.(a) Part 2H of Article 9 of Chapter 130A of the General Statutes is repealed.
SECTION 4.2.(b) G.S. 130A‑309.09A(d)(8) is repealed.
PROHIBIT IMPLEMENTATION AND ENFORCEMENT OF FEDERAL STANDARDS FOR WOOD HEATERS AND FOR FUEL SOURCES THAT PROVIDE HEAT OR HOT WATER TO A RESIDENCE OR BUSINESS
SECTION 4.3.(a) G.S. 143‑215.107 reads as rewritten:
"§ 143‑215.107. Air quality standards and classifications.
(a) Duty to Adopt Plans, Standards, etc. – The Commission is hereby directed and empowered, as rapidly as possible within the limits of funds and facilities available to it, and subject to the procedural requirements of this Article and Article 21:
…
(10) To Except as provided in subsections (h)
and (i) of this section, to develop and adopt standards and plans necessary
to implement requirements of the federal Clean Air Act and implementing
regulations adopted by the United States Environmental Protection Agency.
…
(h) With respect to any regulation adopted by the United States Environmental Protection Agency limiting emissions from wood heaters and adopted after May 1, 2014, neither the Commission nor the Department shall do any of the following:
(1) Issue rules limiting emissions from wood heaters to implement the federal regulations described in this subsection.
(2) Enforce against a manufacturer, distributor, or consumer the federal regulations described in this subsection.
(i) Neither the Commission nor the Department shall enforce any federal air emissions standard adopted by the United States Environmental Protection Agency after May 1, 2014, that would jeopardize the health, safety, or economic well‑being of a citizen of this State through the regulation of fuel combustion that is used directly or indirectly to provide (i) hot water or comfort heating to a residence or (ii) comfort heating to a business."
SECTION 4.3.(b) G.S. 143‑213 is amended by adding a new subdivision to read:
"(31) "Wood heater" means a fireplace, wood stove, pellet stove, wood‑fired hydronic heater, wood‑burning forced‑air furnace, or masonry wood heater or other similar appliance designed for heating a residence or business or for heating water for use by a residence through the combustion of wood or products substantially composed of wood."
AMEND PROCESS FOR STATE ADOPTION OF FEDERAL AIR QUALITY STANDARDS
SECTION 4.4.(a) 15A NCAC 02D .0524(c) (New Source Performance Standards). – Until the effective date of the revised permanent rule that the Environmental Management Commission is required to adopt pursuant to Section 4.4(c) of this act, the Commission and the Department of Environment and Natural Resources shall implement 15A NCAC 02D .0524(c) (New Source Performance Standards) as provided in Section 4.4(b) of this act.
SECTION 4.4.(b) Implementation. – Notwithstanding 15A NCAC 02D .0524(c) (New Source Performance Standards), the Commission shall not adopt a new source performance standard promulgated in Part 60 of Title 40 of the Code of Federal Regulations except by a three‑fifths vote of the Commission. If the Commission adopts new source performance standards promulgated in Part 60 of Title 40 of the Code of Federal Regulations as provided in this section, those rules shall be subject to legislative review as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
SECTION 4.4.(c) Additional Rule‑Making Authority. – The Environmental Management Commission shall adopt a rule to amend 15A NCAC 02D .0524(c) (New Source Performance Standards) consistent with Section 4.4(b) of this act. Notwithstanding G.S. 150B‑19(4), the rule adopted by the Commission pursuant to this section shall be substantively identical to the provisions of Section 4.4(b) of this act. Rules adopted pursuant to this section are not subject to Part 3 of Article 2A of Chapter 150B of the General Statutes. Rules adopted pursuant to this section shall become effective as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
SECTION 4.4.(d) Sunset. – Section 4.4(b) of this act expires on the date that the rule adopted pursuant to Section 4.4(c) of this act becomes effective.
SECTION 4.5.(a) 15A NCAC 02D .1111(c) (Maximum Achievable Control Technology). – Until the effective date of the revised permanent rule that the Environmental Management Commission is required to adopt pursuant to Section 4.5(c) of this act, the Commission and the Department of Environment and Natural Resources shall implement 15A NCAC 02D .1111(c) (Maximum Achievable Control Technology) as provided in Section 4.5(b) of this act.
SECTION 4.5.(b) Implementation. – Notwithstanding 15A NCAC 02D .1111(c) (Maximum Achievable Control Technology), the Commission shall not adopt maximum achievable control technology standards promulgated in Part 63 of Title 40 of the Code of Federal Regulations except by a three‑fifths vote of the Commission. If the Commission adopts maximum achievable control technology standards promulgated in Part 63 of Title 40 of the Code of Federal Regulations as provided in this section, those rules shall be subject to legislative review as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
SECTION 4.5.(c) Additional Rule‑Making Authority. – The Environmental Management Commission shall adopt a rule to amend 15A NCAC 02D .1111(c) (Maximum Achievable Control Technology) consistent with Section 4.5(b) of this act. Notwithstanding G.S. 150B‑19(4), the rule adopted by the Commission pursuant to this section shall be substantively identical to the provisions of Section 4.5(b) of this act. Rules adopted pursuant to this section are not subject to Part 3 of Article 2A of Chapter 150B of the General Statutes. Rules adopted pursuant to this section shall become effective as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
SECTION 4.5.(d) Sunset. – Section 4.5(b) of this act expires on the date that the rule adopted pursuant to Section 4.5(c) of this act becomes effective.
SECTION 4.6.(a) 15A NCAC 02D .1110(b) (National Emissions Standards for Hazardous Air Pollutants). – Until the effective date of the revised permanent rule that the Environmental Management Commission is required to adopt pursuant to Section 4.6(c) of this act, the Commission and the Department of Environment and Natural Resources shall implement 15A NCAC 02D .1110(b) (National Emissions Standards for Hazardous Air Pollutants) as provided in Section 4.6(b) of this act.
SECTION 4.6.(b) Implementation. – 15A NCAC 02D .1110(b) (National Emissions Standards for Hazardous Air Pollutants), the Commission shall not adopt national emissions standards for hazardous air pollutants promulgated in Part 61 of Title 40 of the Code of Federal Regulations except by a three‑fifths vote of the Commission. If the Commission adopts national emissions standards for hazardous air pollutants promulgated in Part 61 of Title 40 of the Code of Federal Regulations as provided in this section, those rules shall be subject to legislative review as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
SECTION 4.6.(c) Additional Rule‑Making Authority. – The Environmental Management Commission shall adopt a rule to amend 15A NCAC 02D .1110(b) (National Emissions Standards for Hazardous Air Pollutants) consistent with Section 4.6(b) of this act. Notwithstanding G.S. 150B‑19(4), the rule adopted by the Commission pursuant to this section shall be substantively identical to the provisions of Section 4.6(b) of this act. Rules adopted pursuant to this section are not subject to Part 3 of Article 2A of Chapter 150B of the General Statutes. Rules adopted pursuant to this section shall become effective as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
SECTION 4.6.(d) Sunset. – Section 4.6(b) of this act expires on the date that the rule adopted pursuant to Section 4.6(c) of this act becomes effective.
SECTION 4.6A. Effective January 1, 2016, the Environmental Management Commission shall not enforce any federal standard that was adopted by reference pursuant to 15A NCAC 02D .0524(c), 15A NCAC 02D .1111(c), and 15A NCAC 02D .1110(b) until such standards are readopted by the Commission as provided in Sections 4.4, 4.5, and 4.6 of this act.
AMEND RISK‑BASED REMEDIATION PROVISIONS
SECTION 4.7.(a) G.S. 130A‑310.65 reads as rewritten:
"§ 130A‑310.65. Definitions.
As used in this Part:
…
(4) "Contaminated industrial site" or "site" means any real property that meets all of the following criteria:
a. The property is contaminated and may be subject to remediation under any of the programs or requirements set out in G.S. 130A‑310.67(a).
b. The property is or has been used primarily for manufacturing or other industrial activities for the production of a commercial product. This includes a property used primarily for the generation of electricity.
c. No contaminant associated with activities
at the property is located off of the property at the time the remedial action
plan is submitted.
d. No contaminant associated with activities at the
property will migrate to any adjacent properties above unrestricted use
standards for the contaminant.contaminant, after the industrial site
has been remediated pursuant to the requirements of this Part.
…
(8) "Registered environmental consultant" means an environmental consulting or engineering firm approved to implement and oversee voluntary remedial actions pursuant to Part 3 of Article 9 of Chapter 130A of the General Statutes and rules adopted to implement the Part.
…."
SECTION 4.7.(b) G.S. 130A‑310.67 reads as rewritten:
"§ 130A‑310.67. Applicability.
(a) This Part applies to contaminated industrial sites subject to remediation pursuant to any of the following programs or requirements:
(1) The Inactive Hazardous Sites Response Act of 1987 under Part 3 of Article 9 of Chapter 130A of the General Statutes, including voluntary actions under G.S. 130A‑310.9 of that act, and rules promulgated pursuant to those statutes.
(2) The hazardous waste management program administered by the State pursuant to the federal Resource Conservation and Recovery Act of 1976, Public Law 94‑580, 90 Stat. 2795, 42 U.S.C. § 6901, et seq., as amended, and Article 9 of Chapter 130A of the General Statutes.
(3) The solid waste management program administered pursuant to Article 9 of Chapter 130A of the General Statutes.
(4) The federal Superfund program administered in part by the State pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, Public Law 96‑510, 94 Stat. 2767, 42 U.S.C. § 9601, et seq., as amended, the Superfund Amendments and Reauthorization Act of 1986, Public Law 99‑499, 100 Stat. 1613, as amended, and under Part 4 of Article 9 of Chapter 130A of the General Statutes.
(5) The groundwater protection corrective action requirements adopted by the Commission pursuant to Article 21 of Chapter 143 of the General Statutes.
(6) Oil Pollution and Hazardous Substances Control Act of 1978, Parts 1 and 2 of Article 21A of Chapter 143 of the General Statutes.
(b) This Part shall not apply to contaminated industrial sites subject to remediation pursuant to any of the following programs or requirements:
(1) The Leaking Petroleum Underground Storage Tank
Cleanup program under Part 2A of Article 21A of Chapter 143 of the General
Statutes and rules promulgated pursuant to that statute.Part.
(2) The Dry‑Cleaning Solvent Cleanup program
under Part 6 of Article 21A of Chapter 143 of the General Statutes and rules
promulgated pursuant to that statute.Part.
(3) The pre‑1983 landfill assessment and
remediation program established under G.S. 130A‑310.6(c) through (g).(g)
and rules promulgated pursuant to that statute.
(4) The Coal Ash Management Act of 2014 under Part 2I of Article 9 of Chapter 130A of the General Statutes and rules promulgated pursuant to that Part.
(c) This Part shall apply only to sites
where a discharge, spill, or release of contamination has been reported to the
Department prior to March 1, 2011."
SECTION 4.7.(c) G.S. 130A‑310.69(b)(11) reads as rewritten:
"§ 130A‑310.69. Remedial investigation report; remedial action plans.
…
(b) A person who proposes to conduct remediation pursuant to this Part shall develop and submit a proposed remedial action plan to the Department. A remedial action plan shall provide for the protection of public health, safety, and welfare and the environment. A remedial action plan shall do all of the following:
…
(11) Provide for the imposition and recordation of land‑use
restrictions as provided in G.S. 143B‑279.9, 143B‑279.10, 130A‑310.3(f),
130A‑310.8, 130A‑310.35, 143‑215.84(f), and 143‑215.85A
if the remedial action plan allows contamination in excess of the greater of
unrestricted use standards or background standards to remain on any real
property or in groundwater that underlies any real property.property
on the industrial site."
SECTION 4.7.(d) G.S. 130A‑310.71 reads as rewritten:
"§ 130A‑310.71. Review and approval of proposed remedial action plans.
(a) The Department shall review and approve a proposed remedial action plan consistent with the remediation standards set out in G.S. 130A‑310.68 and the procedures set out in this section. In its review of a proposed remedial action plan, the Department shall do all of the following:
…
(2) Determine whether the party conducting the
remediation has adequately demonstrated through modeling or other scientific
means acceptable to the Department that no contamination will migrate to
adjacent property at levels above unrestricted use standards.standards
after the industrial site has been remediated pursuant to the plan.
(3) Determine whether the proposed remedial action plan meets the requirements of G.S. 130A‑310.69.
(4) Determine whether the proposed remedial action plan meets the requirements of any other applicable remediation program except those pertaining to remediation standards.
(5) Establish the acceptable level or range of levels of risk to public health, safety, and welfare and to the environment.
(6) Establish, for each contaminant, the maximum allowable quantity, concentration, range, or other measures of contamination that will remain at the contaminated site at the conclusion of the contaminant‑reduction phase of the remediation.
(7) Consider the technical performance, effectiveness, and reliability of the proposed remedial action plan in attaining and maintaining compliance with applicable remediation standards.
(8) Consider the ability of the person who proposes to remediate the site to implement the proposed remedial action plan within a reasonable time and without jeopardizing public health, safety, or welfare or the environment.
(9) Determine whether the proposed remedial action plan adequately provides for the imposition and maintenance of engineering and institutional controls and for sampling, monitoring, and reporting requirements necessary to protect public health, safety, and welfare and the environment.
(10) Approve the circumstances under which no further remediation is required.
(11) For industrial sites proceeding with remediation under this Part at which contaminants associated with activities of the industrial site have migrated to any adjacent properties, determine whether the proposed remedial action plan adequately provides for remediation of environmental contamination on the adjacent properties to unrestricted use standards.
(b) The person who proposes a remedial action plan has
the burden of demonstrating with reasonable assurance that (i) any
contamination associated with activities of the industrial site that has
migrated to adjacent properties will be remediated to unrestricted use
standards on the adjacent properties; (ii) contamination from the site will
not migrate to adjacent property above unrestricted use levels andstandards
after the industrial site has been remediated pursuant to the remedial action
plan; and (iii) that the remedial action plan is protective of
public health, safety, and welfare and the environment by virtue of its
compliance with this Part. The demonstration shall (i) take into account
actions proposed in the remedial action plan that will prevent contamination
from migrating off the site; and (ii) use scientifically valid site‑specific
data.
(c) The Department may require a person who proposes a remedial action plan to supply any additional information necessary for the Department to approve or disapprove the plan.
(d) In making a determination on a proposed remedial action plan, the Department shall consider the information provided by the person who proposes the remedial action plan as well as information provided by local governments and adjoining landowners pursuant to G.S. 130A‑310.70. The Department shall disapprove a proposed remedial action plan unless the Department finds that the plan is protective of public health, safety, and welfare and the environment and complies with the requirements of this Part. If the Department disapproves a proposed remedial action plan, the person who submitted the plan may seek review as provided in Article 3 of Chapter 150B of the General Statutes. If the Department fails to approve or disapprove a proposed remedial action plan within 120 days after a complete plan has been submitted, the person who submitted the plan may treat the plan as having been disapproved at the end of that time period."
SECTION 4.7.(e) Part 8 of Article 9 of Chapter 130A of the General Statutes is amended by adding a new section to read:
"§ 130A‑310.68A. Remediation to unrestricted use standards required for contamination on adjacent properties.
Notwithstanding any other provision of this Part, for industrial sites proceeding with remediation under this Part at which contaminants associated with activities of the industrial site have migrated to any adjacent properties, remediation of environmental contamination on the adjacent properties shall meet unrestricted use standards on those properties."
SECTION 4.8.(a) No later than January 1, 2016, the Department of Environment and Natural Resources shall do all of the following:
(1) Develop internal processes to govern remediation of contaminated industrial sites conducted under this Part that are consistent across all programs or requirements identified in subsection (a) of G.S. 130A‑310.67.
(2) Develop a coordinated program and processes for remediation of contaminated industrial sites conducted under this Part that are subject to more than one program or requirement identified in subsection (a) of G.S. 130A‑310.67.
(3) Develop reforms to expand the role, and otherwise enhance the use of, registered environmental consultants approved to implement and oversee voluntary remedial actions pursuant to this Part.
SECTION 4.8.(b) No later than April 1, 2016, the Department shall report to the Environmental Review Commission on its activities conducted pursuant to subsection (a) of this section, together with any pertinent findings or recommendations, including any legislative proposals that it deems advisable.
AMEND THE LAW GOVERNING BROWNFIELDS REDEVELOPMENT TO EXTEND ELIGIBILITY UNDER THE PROGRAM TO BONA FIDE PROSPECTIVE PURCHASERS, IN ACCORDANCE WITH FEDERAL LAW
SECTION 4.9.(a) G.S. 130A‑310.31(b)(10) reads as rewritten:
"§ 130A‑310.31. Definitions.
(a) Unless a different meaning is required by the context or unless a different meaning is set out in subsection (b) of this section, the definitions in G.S. 130A‑2 and G.S. 130A‑310 apply throughout this Part.
(b) Unless a different meaning is required by the context:
…
(10) "Prospective developer" means any
person with a bona fide, demonstrable desire to either buy or sell a brownfields
property for the purpose of developing or redeveloping that brownfields
property and who did not cause or contribute to the contamination at the
brownfields property.includes "bona fide prospective purchasers,"
"contiguous property owners," and "innocent landowners," as
those terms are defined under the Small Business Liability Relief and
Brownfields Revitalization Act (Pub. L. No. 107‑118, 115 stat. 2356), 42
U.S.C. § 9601."
SECTION 4.9.(b) This section becomes effective July 1, 2015, and applies to Notices of Intent to Redevelop a Brownfields Property filed on or after that date.
ELIMINATE OUTDATED FEES RELATED TO SOLID WASTE MATTERS
SECTION 4.10.(a) G.S. 105‑102.6 is repealed.
SECTION 4.10.(b) G.S. 130A‑309.17(d) and (i) are repealed.
REPEAL ENERGY AUDIT REQUIREMENTS
SECTION 4.11. G.S. 143‑64.12 reads as rewritten:
"§ 143‑64.12. Authority and duties of the Department; State agencies and State institutions of higher learning.
(a) The Department of Environment and Natural Resources through the State Energy Office shall develop a comprehensive program to manage energy, water, and other utility use for State agencies and State institutions of higher learning and shall update this program annually. Each State agency and State institution of higher learning shall develop and implement a management plan that is consistent with the State's comprehensive program under this subsection to manage energy, water, and other utility use, and that addresses any findings or recommendations resulting from the energy audit required by subsection (b1) of this section. The energy consumption per gross square foot for all State buildings in total shall be reduced by twenty percent (20%) by 2010 and thirty percent (30%) by 2015 based on energy consumption for the 2002‑2003 fiscal year. Each State agency and State institution of higher learning shall update its management plan biennially and include strategies for supporting the energy consumption reduction requirements under this subsection. Each community college shall submit to the State Energy Office a biennial written report of utility consumption and costs. Management plans submitted biennially by State institutions of higher learning shall include all of the following:
(1) Estimates of all costs associated with implementing energy conservation measures, including pre‑installation and post‑installation costs.
(2) The cost of analyzing the projected energy savings.
(3) Design costs, engineering costs, pre‑installation costs, post‑installation costs, debt service, and any costs for converting to an alternative energy source.
(4) An analysis that identifies projected annual energy savings and estimated payback periods.
(a1) State agencies and State institutions of higher learning shall carry out the construction and renovation of facilities in such a manner as to further the policy set forth under this section and to ensure the use of life‑cycle cost analyses and practices to conserve energy, water, and other utilities.
(b) The Department of Administration shall develop and implement policies, procedures, and standards to ensure that State purchasing practices improve efficiency regarding energy, water, and other utility use and take the cost of the product over the economic life of the product into consideration. The Department of Administration shall adopt and implement Building Energy Design Guidelines. These guidelines shall include energy‑use goals and standards, economic assumptions for life‑cycle cost analysis, and other criteria on building systems and technologies. The Department of Administration shall modify the design criteria for construction and renovation of facilities of State buildings and State institutions of higher learning buildings to require that a life‑cycle cost analysis be conducted pursuant to G.S. 143‑64.15.
(b1) The Department of Administration, as part of the
Facilities Condition and Assessment Program, shall identify and recommend
energy conservation maintenance and operating procedures that are designed to
reduce energy consumption within the facility of a State agency or a State
institution of higher learning and that require no significant expenditure of
funds. Every State agency or State institution of higher learning shall
implement these recommendations. Where energy management equipment is proposed
for any facility of a State agency or of a State institution of higher
learning, the maximum interchangeability and compatibility of equipment
components shall be required. As part of the Facilities Condition and
Assessment Program under this section, the Department of Administration, in
consultation with the State Energy Office, shall develop an energy audit and a
procedure for conducting energy audits. Every five years the Department shall
conduct an energy audit for each State agency or State institution of higher
learning, and the energy audits conducted shall serve as a preliminary energy
survey. The State Energy Office shall be responsible for system‑level
detailed surveys.
(b2) The Department of Administration shall
submit a report of the energy audit required by subsection (b1) of this section
to the affected State agency or State institution of higher learning and to the
State Energy Office. The State Energy Office shall review each audit and, in
consultation with the affected State agency or State institution of higher
learning, incorporate the audit findings and recommendations into the
management plan required by subsection (a) of this section.
…
(j) The State Energy Office shall submit a report by December 1 of every odd‑numbered year to the Joint Legislative Energy Policy Commission describing the comprehensive program to manage energy, water, and other utility use for State agencies and State institutions of higher learning required by subsection (a) of this section. The report shall also contain the following:
(1) A comprehensive overview of how State agencies and State institutions of higher learning are managing energy, water, and other utility use and achieving efficiency gains.
(2) Any new measures that could be taken by State agencies and State institutions of higher learning to achieve greater efficiency gains, including any changes in general law that might be needed.
(3) A summary of the State agency and State
institutions of higher learning management plans required by subsection (a) of
this section and the energy audits required by subsection (b1) of this section.
(4) A list of the State agencies and State institutions
of higher learning that did and did not submit management plans required by
subsection (a) of this section and a list of the State agencies and State
institutions of higher learning that received an energy audit.section.
(5) Any recommendations on how management plans can be better managed and implemented."
DELETE OR REPEAL VARIOUS ENVIRONMENTAL AND NATURAL RESOURCES REPORTING REQUIREMENTS
SECTION 4.12.(a) G.S. 113‑175.6 is repealed.
SECTION 4.12.(b) G.S. 113‑182.1(e) reads as rewritten:
"§ 113‑182.1. Fishery Management Plans.
…
(e) The Secretary of Environment and Natural Resources
shall monitor progress in the development and adoption of Fishery Management
Plans in relation to the Schedule for development and adoption of the plans
established by the Marine Fisheries Commission. The Secretary of Environment
and Natural Resources shall report to the Joint Legislative Commission on
Governmental Operations on progress in developing and implementing the Fishery
Management Plans on or before 1 September of each year. The Secretary of
Environment and Natural Resources shall report to the Joint Legislative
Commission on Governmental Operations within 30 days of the completion or
substantial revision of each proposed Fishery Management Plan. The Joint
Legislative Commission on Governmental Operations shall review each proposed
Fishery Management Plan within 30 days of the date the proposed Plan is
submitted by the Secretary. The Joint Legislative Commission on Governmental
Operations may submit comments and recommendations on the proposed Plan to the
Secretary within 30 days of the date the proposed Plan is submitted by the
Secretary."
SECTION 4.12.(c) G.S. 143B‑279.15 is repealed.
SECTION 4.12.(d) G.S. 143B‑289.44(d) is repealed.
SECTION 4.12.(e) G.S. 159I‑29 is repealed.
SECTION 4.12.(f) Section 2.3 of S.L. 2007‑485 is repealed.
ON‑SITE WASTEWATER AMENDMENTS AND CLARIFICATIONS
SECTION 4.14.(a) G.S. 130A‑334 reads as rewritten:
"§ 130A‑334. Definitions.
The following definitions shall apply throughout this Article:
(1) "Accepted wastewater system" has the same meaning as in G.S. 130A‑343.
(1)(1a) "Construction" means any work
at the site of placement done for the purpose of preparing a residence, place
of business or place of public assembly for initial occupancy, or subsequent
additions or modifications which increase sewage flow.
(1b) "Conventional wastewater system" has the same meaning as in G.S. 130A‑343.
(1a)(1c) "Department" means the
Department of Health and Human Services.
(1b)(1d) "Ground absorption system"
means a system of tanks, treatment units, nitrification fields, and
appurtenances for wastewater collection, treatment, and subsurface disposal.
(2) Repealed by Session Laws 1985, c. 462, s. 18.
(2a) "Industrial process wastewater" means any water‑carried waste resulting from any process of industry, manufacture, trade, or business.
(2b) "Licensed soil scientist" has the same meaning as in G.S. 89F‑3.
(3) "Location" means the initial placement for occupancy of a residence, place of business or place of public assembly.
(3a) "Maintenance" means normal or routine maintenance including replacement of broken pipes, cleaning, or adjustment to an existing wastewater system.
(4), (5) Repealed by Session Laws 1985, c. 462, s. 18.
(6) "Place of business" means a store, warehouse, manufacturing establishment, place of amusement or recreation, service station, office building or any other place where people work.
(7) "Place of public assembly" means a fairground, auditorium, stadium, church, campground, theater or any other place where people assemble.
(7a) "Plat" means a property survey prepared by a registered land surveyor, drawn to a scale of one inch equals no more than 60 feet, that includes: the specific location of the proposed facility and appurtenances, the site for the proposed wastewater system, and the location of water supplies and surface waters. "Plat" also means, for subdivision lots approved by the local planning authority if a local planning authority exists at the time of application for a permit under this Article, a copy of the subdivision plat that has been recorded with the county register of deeds and is accompanied by a site plan that is drawn to scale.
(7b) "Pretreatment" means any biological, chemical, or physical process or system for improving wastewater quality and reducing wastewater constituents prior to final treatment and disposal in a subsurface wastewater system and includes, but is not limited to aeration, clarification, digestion, disinfection, filtration, separation, and settling.
(7c) "Private option permit" means approval of an on‑site wastewater system by a professional engineer who has both expertise and education in civil or environmental engineering and who has designed the wastewater system acting under the authority of the owner thereof.
(7d) "Professional engineer" has the same meaning as in G.S. 89C‑3.
(8) "Public or community wastewater system" means a single system of wastewater collection, treatment and disposal owned and operated by a sanitary district, a metropolitan sewage district, a water and sewer authority, a county or municipality or a public utility.
(9) "Relocation" means the displacement of a residence or place of business from one site to another.
(9a) "Repair" means the extension, alteration, replacement, or relocation of existing components of a wastewater system.
(10) "Residence" means a private home, dwelling unit in a multiple family structure, hotel, motel, summer camp, labor work camp, manufactured home, institution or any other place where people reside.
(10a) "Secretary" means the Secretary of Environment and Natural Resources.
(11) Repealed by Session Laws 1992, c. 944, s. 3.
(12) "Septic tank system" means a subsurface wastewater system consisting of a settling tank and a subsurface disposal field.
(13) "Sewage" means the liquid and solid human body waste and liquid waste generated by water‑using fixtures and appliances, including those associated with foodhandling. The term does not include industrial process wastewater or sewage that is combined with industrial process wastewater.
(13a) "Site plan" means a drawing not necessarily drawn to scale that shows the existing and proposed property lines with dimensions, the location of the facility and appurtenances, the site for the proposed wastewater system, and the location of water supplies and surface waters.
(14) "Wastewater" means any sewage or industrial process wastewater discharged, transmitted, or collected from a residence, place of business, place of public assembly, or other places into a wastewater system.
(15) "Wastewater system" means a system of wastewater collection, treatment, and disposal in single or multiple components, including a ground absorption system, privy, septic tank system, public or community wastewater system, wastewater reuse or recycle system, mechanical or biological wastewater treatment system, any other similar system, and any chemical toilet used only for human waste. A wastewater system located on multiple adjoining lots or tracts of land under common ownership or control shall be considered a single system for purposes of permitting under this Article."
SECTION 4.14.(b) G.S. 130A‑335 reads as rewritten:
"§ 130A‑335. Wastewater collection, treatment and disposal; rules.
(a) A person owning or controlling a residence, place of business or a place of public assembly shall provide an approved wastewater system. Except as may be allowed under another provision of law, all wastewater from water‑using fixtures and appliances connected to a water supply source shall discharge to the approved wastewater system. A wastewater system may include components for collection, treatment and disposal of wastewater.
(a1) Any proposed site for a residence, place of business, or a place of public assembly located in an area that is not served by an approved wastewater system for which a new wastewater system is proposed may be evaluated for soil conditions and site features by a licensed soil scientist. For purposes of this subsection, "site features" include topography and landscape position; soil characteristics (morphology); soil wetness; soil depth; restrictive horizons; available space; and other applicable factors that involve accepted public health principles.
(b) All wastewater systems shall either (i) be regulated by the Department under rules adopted by the Commission or (ii) conform with the private option permit criteria set forth in G.S. 130A‑336.1 and under rules adopted by the Commission except for the following wastewater systems that shall be regulated by the Department under rules adopted by the Environmental Management Commission:
(1) Wastewater collection, treatment, and disposal systems designed to discharge effluent to the land surface or surface waters.
(2) Wastewater systems designed for groundwater remediation, groundwater injection, or landfill leachate collection and disposal.
(3) Wastewater systems designed for the complete recycle or reuse of industrial process wastewater.
(4) Gray water systems as defined in G.S. 143‑350.
(c) A wastewater system subject to approval under rules of the Commission shall be reviewed and approved under rules of a local board of health in the following circumstances:
(1) The local board of health, on its own motion, has requested the Department to review its proposed rules concerning wastewater systems; and
(2) The local board of health has adopted by reference the wastewater system rules adopted by the Commission, with any more stringent modifications or additions deemed necessary by the local board of health to protect the public health; and
(3) The Department has found that the rules of the local board of health concerning wastewater collection, treatment and disposal systems are at least as stringent as rules adopted by the Commission and are sufficient and necessary to safeguard the public health.
(c1) The rules adopted by the Commission for wastewater systems approved under the private option permit criteria pursuant to G.S. 130A‑336.1 shall be, at a minimum, as stringent as the rules for wastewater systems established by the Commission.
(d) The Department may, upon its own motion, upon the request of a local board of health or upon the request of a citizen of an affected county, review its findings under subsection (c) of this section.
The Department shall review its findings under subsection (c) of this section upon modification by the Commission of the rules applicable to wastewater systems. The Department may deny, suspend, or revoke the approval of local board of health wastewater system rules upon a finding that the local wastewater rules are not as stringent as rules adopted by the Commission, are not sufficient and necessary to safeguard the public health, or are not being enforced. Suspension and revocation of approval shall be in accordance with G.S. 130A‑23.
(d1) The Department or owner of a wastewater system may file a written complaint with the North Carolina Board of Examiners for Engineers and Surveyors in accordance with rules and procedures adopted by the Board pursuant to Chapter 89C of the General Statutes citing failure of a professional engineer to adhere to the rules adopted by the Commission pursuant to this Article. The Department or owner of a wastewater system may file a written complaint with the North Carolina Board of Licensed Soil Scientists in accordance with rules and procedures adopted by the Board pursuant to Chapter 89F of the General Statutes citing failure of a licensed soil scientist to adhere to the rules adopted by the Commission pursuant to this Article.
…."
SECTION 4.14.(c) Article 11 of Chapter 130A of the General Statutes is amended by adding a new section to read:
"§ 130A‑336.1. Alternative process for wastewater system approvals.
(a) Private Option Permit Authorized. – A professional engineer may, under the legal authority of the owner of a proposed wastewater system who wishes to utilize the private option permit, prepare drawings, specifications, plans, and reports that are certified and stamped with the professional engineer's seal for the design, construction, operation, and maintenance of the wastewater system in accordance with this section and rules adopted thereunder.
(b) Notice of Intent to Construct. – Prior to commencing or assisting in the construction, siting, or relocation of a wastewater system, the owner of a proposed wastewater system who wishes to utilize the private option permit, or a professional engineer authorized as the legal representative of the owner, shall submit to the local health department with jurisdiction over the location of the proposed wastewater system a notice of intent to construct a wastewater system utilizing the private permit option. The Department shall develop a common form for use as the notice of intent to construct that includes all of the following:
(1) The owner's name, address, e‑mail address, and telephone number.
(2) The professional engineer's name, address, e‑mail address, and telephone number.
(3) Certified copy of the wastewater system owner's contract with the professional engineer.
(4) For both the professional engineer and the licensed soil scientist, proof of errors and omissions insurance coverage or other appropriate liability insurance that has policy limits of not less than one million dollars ($1,000,000) per claim and that shall remain in force as applicable:
a. Two years following the date on which a professional engineer delivers an engineering report pursuant to subdivision (k)(1) of this section to the owner of the wastewater system; or
b. Two years following the date on which a licensed soil scientist delivers a soils report to the owner of the wastewater system.
(5) A description of the facility the proposed site is to serve and any factors that would affect the wastewater load.
(6) The type of proposed wastewater system and its location.
(7) The design wastewater flow and characteristics.
(8) Any proposed landscape, site, drainage, or soil modifications.
(9) A soil evaluation that is conducted and signed and sealed by a licensed soil scientist.
(10) A plat, as defined in G.S. 130A‑334(7a).
(c) Completeness Review for Notice of Intent to Construct. – The local health department shall determine whether a notice of intent to construct, as required pursuant subsection (b) of this section, is complete within 14 days after the local health department receives the notice of intent to construct. A determination of completeness means that the notice of intent to construct includes all of the required components. If the local health department determines that the notice of intent to construct is not complete, the department shall notify the owner or the professional engineer of the components needed to complete the notice. The owner or professional engineer may submit additional information to the department to cure the deficiencies in the notice. The local health department shall make a final determination as to whether the notice of intent to construct is complete within 10 days after the department receives the additional information from the owner or professional engineer. If the department fails to act within any time period set out in this subsection, the owner or professional engineer may treat the failure to act as a denial of the completeness of the notice of intent and may challenge the denial as provided in Chapter 150B of the General Statutes.
(d) Submission of Notice of Intent to Construct to Department for Certain Systems. – Prior to commencing in the construction, siting, or relocation of a wastewater system designed (i) for the collection, treatment, and disposal of industrial process wastewater or (ii) to treat greater than 3,000 gallons per day, the owner of a proposed wastewater system who wishes to utilize the private option permit, or a professional engineer authorized as the legal representative of the owner, shall provide to the Department a duplicate copy of the notice of intent to construct submitted to the local health department required pursuant to subsection (b) of this section.
(e) Site Design, Construction, and Activities. –
(1) The professional engineer designing the proposed wastewater system shall use recognized principles and practices of engineering and applicable rules of the Commission in the calculations and design of the wastewater system. The investigations and findings of the professional engineer shall include, at a minimum, the information required in rules adopted by the Commission pursuant to G.S. 130A‑335(e). The professional engineer may, at the engineer's discretion, employ wastewater system technologies not yet approved in this State.
(2) Notwithstanding G.S. 130A‑335(a1), the owner of the proposed wastewater system shall employ a licensed soil scientist to evaluate soil conditions and site features.
(3) The professional engineer designing the proposed wastewater system shall be responsible and accountable for all aspects of the construction and installation of the wastewater system, including the selection and oversight of an on‑site wastewater system contractor certified pursuant to Article 5 of Chapter 90A of the General Statutes.
(4) In addition to the requirements of this section, the owner and professional engineer designing the proposed wastewater system shall comply with all other applicable federal, State, and local laws, regulations, rules, and ordinances.
(f) Liability. – The licensed soil scientist evaluating the soils at the site of the proposed wastewater system shall assume all liability for the findings of the soil scientist's initial soil evaluation and final soils report. The professional engineer designing the proposed wastewater system shall assume all liability for the engineer's scope of work in the design, calculation, construction and installation, and requirements for the development of the operation and management plan for the wastewater system. The owner of the wastewater system shall assume all liability for the proper operation and management of the wastewater system. The Department, the Department's authorized agents, or local health departments shall have no liability for wastewater systems approved under a private option permit. After the owner of the wastewater system has commenced operation of the system pursuant to subsection (m) of this section, neither the professional engineer nor the licensed soil scientist shall be held liable for any damages that result from any unapproved changes made to the wastewater system by the owner.
(g) Inspections. – The local health department may, at any time, conduct a site visit of the wastewater system.
(h) Local Authority. – This section shall not relieve the owner or operator of a wastewater system from complying with any and all modifications or additions to rules adopted by the local health department to protect public health pursuant to G.S. 130A‑335(c). The local health department shall notify the owner or operator of the wastewater system of any issues of compliance related to such modifications or additions.
(i) Operations and Management. –
(1) The professional engineer designing the wastewater system shall establish a written operations and management program based on the size and complexity of the wastewater system and shall provide the owner with the operations and management program.
(2) The professional engineer shall assist the owner in the owner's selection of a water pollution control system operator. The owner shall enter into a contract with a water pollution control system operator certified pursuant to Part 1 of Article 3 of Chapter 90A of the General Statutes and who is selected from the list of certified operators maintained by the Division of Water Resources in the Department of Environment and Natural Resources for operation and maintenance of the system in accordance with rules adopted by the Commission.
(3) Any person who owns or controls the property upon which the wastewater system is located shall be responsible for the continued adherence to the operations and management program established by the professional engineer developed pursuant to subdivision (1) of this subsection.
(j) Postconstruction Conference. – The professional engineer designing the wastewater system shall hold a postconstruction conference with the owner of the wastewater system; the licensed soil scientist who performed the soils evaluation for the wastewater system; the contractor, certified pursuant to Article 5 of Chapter 90A of the General Statutes, who installed the wastewater system; the certified operator of the wastewater system, if any; and representatives from the local health department and, as applicable, the Department. The postconstruction conference shall include start‑up of the wastewater system and any required verification of system design or system components.
(k) Required Documentation. –
(1) At the completion of the postconstruction conference conducted pursuant to subsection (j) of this section, the professional engineer who designed the wastewater system shall deliver to the owner signed, sealed, and dated certified copies of the engineer's report, which, for purposes of this section, shall include (i) the evaluation of soil conditions and site features as prepared by the licensed soil scientist; (ii) design and construction specifications; (iii) operator's management program manual that includes a copy of the contract entered into with the certified water pollution control system operator required pursuant to subsection (i) of this section; and (iv) any reports and findings related to the design and installation of the wastewater system.
(2) Upon reviewing the authorized professional engineer's report, the owner of the wastewater system shall sign and notarize the report as having been received.
(l) Reporting Requirements. –
(1) The owner of the wastewater system shall deliver to the local health department (i) a certified copy of the authorized professional engineer's report, (ii) a copy of the operations and management program, (iii) the fee required pursuant to subsection (n) of this section, and (iv) a notarized letter that documents the owner's acceptance of the system from the professional engineer.
(2) The owner of any wastewater system subject to subsection (d) of this section shall deliver to the Department certified copies of the engineer's report, as described in subdivision (1) of this subsection.
(m) Authorization to Operate. – Upon receipt of the documents and fees required pursuant to subdivision (1) of subsection (l) of this section, the local health department shall issue the owner a letter of confirmation that states the documents and information contained therein have been received and that the wastewater system may operate in accordance with rules adopted by the Commission.
(n) Fees. – The local health department may assess a fee of up to ten percent (10%) of the fees established to obtain an improvement permit, an authorization to construct, or an operations permit within the health department's on‑site wastewater program. Fees shall be used by the local health department to conduct site inspections, to support the department's staff participation at postconstruction conference meetings, and to archive the private permit with the county register of deeds or other recordation of the wastewater system as required.
(o) Change in System Ownership. – A wastewater system authorized pursuant to this section shall not be affected by change in ownership of the site for the wastewater system, provided both the site for the wastewater system and the facility the system serves are unchanged and remain under the ownership or control of the person currently owning the wastewater system.
(p) Rule Making. – The Commission shall adopt rules to implement to the provisions of this section.
(q) Reports. – The Department shall report to the Environmental Review Commission and the Joint Legislative Oversight Committee on Health and Human Services on or before January 1, 2017, and annually thereafter, on the implementation and effectiveness of this section. For the report due on or before January 1, 2017, the Department shall specifically evaluate whether (i) the private option permit resulted in a reduction in the length of time improvement permits or authorizations to construct are pending; (ii) the private option permit resulted in increased system failures or other adverse impacts; and (iii) the private option permit resulted in new or increased environmental impacts. The Department may include recommendations, including any legislative proposals, in its reports to the Commission and Committee."
SECTION 4.14.(d) G.S. 130A‑338 reads as rewritten:
"§ 130A‑338. Authorization for wastewater system construction required before other permits to be issued.
Where construction, location or relocation is proposed to be
done upon a residence, place of business or place of public assembly, no permit
required for electrical, plumbing, heating, air conditioning or other
construction, location or relocation activity under any provision of general or
special law shall be issued until an authorization for wastewater system
construction has been issued under G.S. 130A‑336G.S. 130A‑336,
or authorization has been obtained under G.S. 130A‑337(c).G.S. 130A‑337(c),
or a decision on the completeness of the notice of intent to construct is made by
the local health department pursuant to G.S. 130A‑336.1(c)."
SECTION 4.14.(e) G.S. 130A‑339 reads as rewritten:
"§ 130A‑339. Limitation on electrical service.
No person shall allow permanent electrical service to a residence, place of business or place of public assembly upon construction, location or relocation until the official electrical inspector with jurisdiction as provided in G.S. 143‑143.2 certifies to the electrical supplier that the required improvement permit authorization for wastewater system construction and an operation permit or authorization under G.S. 130A‑337(c) or the decision on the completeness of the notice of intent to construct made by the local health department pursuant to G.S. 130A‑336.1(b1) has been obtained. Temporary electrical service necessary for constructing a residence, place of business or place of public assembly can be provided upon compliance with G.S. 130A‑338."
SECTION 4.14.(f) The Commission for Public Health, in consultation with the Department of Health and Human Services, local health departments, and stakeholders representing the wastewater system industry, shall study the minimum on‑site wastewater system inspection frequency established pursuant to Table V(a) in 15A NCAC 18A .1961 to evaluate the feasibility and desirability of eliminating duplicative inspections of on‑site wastewater systems. In the conduct of its study, the Commission shall consider (i) the compliance history of wastewater systems, including whether operators' reports and laboratory reports are in compliance with Article 11 of Chapter 130A of the General Statutes and the rules adopted pursuant to that Article; (ii) alternative inspection frequencies, including the use of remote Web‑based monitoring for alarm and compliance notification; (iii) whether the required verification visit conducted by local health departments shows a statistically significant justification for duplicative costs to the owner of the wastewater system; (iv) methods for notifications of changes to and expirations of operations contracts; and (v) methods for local health departments to provide certified operator management for sites that are not under contract with a water pollution control system operator certified pursuant to Part 1 of Article 3 of Chapter 90A of the General Statutes. The Commission shall report its findings and recommendations, including any legislative proposals, to the Environmental Review Commission and the Joint Legislative Oversight Committee on Health and Human Services on or before January 1, 2016.
SECTION 4.14.(g) G.S. 130A‑336 reads as rewritten:
"§ 130A‑336. Improvement permit and authorization for wastewater system construction required.
(a) Any proposed site for a residence, place of
business, or place of public assembly in an area not served by an approved
wastewater system shall be evaluated by either (i) the local health
department in accordance with rules adopted pursuant to this Article.Article
or (ii) by a professional engineer or licensed soil scientist acting within the
engineer's or soil scientist's scope of work, as applicable, and pursuant to
the conditions of the private option permit in G.S. 130A‑336.1.
An improvement permit shall be issued in compliance with the rules adopted
pursuant to this Article. An improvement permitissued by a local health
department shall include:
(1) For permits that are valid without expiration, a
plat or, for permits that are valid for five years,A plat or a site
plan.
(2) A description of the facility the proposed site is to serve.
(3) The proposed wastewater system and its location.
(4) The design wastewater flow and characteristics.
(5) The conditions for any site modifications.
(6) Any other information required by the rules of the Commission.
The Neither the improvement permit nor the authorization
for wastewater system construction shall not be affected by change in
of ownership of the site for the wastewater system provided both the
site for the wastewater system and the facility the system serves are unchanged
and remain under the ownership or control of the person owning the facility. The
improvement permit and the authorization for wastewater system construction
shall remain valid once issued, without expiration, provided the design
wastewater flow and characteristics and the description of the proposed
facility the wastewater system will serve remains unchanged. No person
shall commence or assist in the construction, location, or relocation of a
residence, place of business, or place of public assembly in an area not served
by an approved wastewater system unless an improvement permit and an
authorization for wastewater system construction are obtained from the local
health department.department unless acting within the conditions and
criteria of a private option permit pursuant to G.S. 130A‑336.1.
This requirement shall not apply to a manufactured residence exhibited for sale
or stored for later sale and intended to be located at another site after sale.
(b) The local health department shall issue an
authorization for wastewater system construction authorizing work to proceed
and the installation or repair of a wastewater system when it has determined
after a field investigation that the system can be installed and operated in
compliance with this Article and rules adopted pursuant to this Article. This
authorization for wastewater system construction shall be valid for a period
equal to the period of validity of the improvement permit and may be issued at
the same time the improvement permit is issued. No person shall commence or
assist in the installation, construction, or repair of a wastewater system
unless an improvement permit and an authorization for wastewater system
construction have been obtained from the Department or the local health department.department
unless acting within the conditions and criteria of a private option permit
pursuant to G.S. 130A‑336.1. No improvement permit or
authorization for wastewater system construction shall be required for
maintenance of a wastewater system. The Department and the local health
department may impose conditions on the issuance of an improvement permit and
an authorization for wastewater system construction.
(b1) The local health department shall maintain a database of proposed wastewater systems for which both the improvement permit and construction authorization have been obtained but no commencement of activity related to the construction or installation of the wastewater system was undertaken during the five years immediately following the approval of the improvement permit and construction authorization. For those wastewater systems identified in accordance with this subsection, the local health department shall notify the applicant of alternative wastewater system technologies and options that may be employed by the applicant in lieu of the system already permitted and authorized by the department.
(c) Unless the Commission otherwise provides by rule, plans, and specifications for all wastewater systems designed for the collection, treatment, and disposal of industrial process wastewater shall be reviewed and approved by the Department prior to the issuance of an authorization for wastewater system construction by the local health department.
(d) If a local health department repeatedly fails to
issue or deny improvement permits for conventional or accepted septic
tank systems within 60 days of days, or within 90 days for
provisional or innovative systems, after receiving completed applications
for the permits, then the Department of Environment and Natural Resources may
withhold public health funding from that local health department."
SECTION 4.14.(h) G.S. 130A‑342 reads as rewritten:
"§ 130A‑342. Residential wastewater treatment systems.
(a) Individual residential wastewater treatment systems that are approved and listed in accordance with the standards adopted by the National Sanitation Foundation, Inc. for Class I residential wastewater treatment systems, as set out in Standard 40 of the National Sanitation Foundation, Inc., (as approved 13 January 2001) as amended, shall be permitted under rules adopted by the Commission. The Commission may establish standards in addition to those set by the National Sanitation Foundation, Inc.
(b) A permitted system with a design flow of less
than 1,500 gallons per day shall be operated and maintained by a
certified wastewater treatment facility operator.by a person who is a Subsurface
Water Pollution Control System Operator as certified by the Water Pollution
Control System Operators Certification Commission and authorized by the
manufacturer of the individual residential wastewater treatment system. The
Commission may establish additional standards for wastewater systems with a
design flow of 1,500 gallons or greater per day.
(c) Each county, in which one or more residential wastewater treatment systems permitted pursuant to this section are in use, shall document the performance of each system and report the results to the Department annually."
SECTION 4.14.(i) This section is effective when this act becomes law, and the Commission for Public Health shall adopt or amend rules pursuant to Sections 4.14(a) through 4.14(e) of this act no later than June 1, 2016. No person shall utilize the private permit option authorized pursuant to G.S. 130A‑336.1, as enacted by Section 4.14(c) of this act, however, until such time as the rules adopted by the Commission pursuant to Section 4.14(c) of this act become effective.
AMEND APPROVAL OF ON‑SITE WASTEWATER SYSTEMS
SECTION 4.15.(a) G.S. 130A‑343 reads as rewritten:
"§ 130A‑343. Approval of on‑site subsurface wastewater systems.
(a) Definitions. – As used in this section:
(1) "Accepted wastewater dispersal system"
means any subsurface wastewater dispersal system, other than a
conventional wastewater system, or any technology, device, or component of a
wastewater system that: (i) has been previously approved as an innovative
wastewater dispersal system by the Department; (ii) has been in general
use in this State as an innovative wastewater dispersal system for more
than five years; and (iii) has been approved by the Commission for general use
or use in one or more specific applications. An accepted wastewater dispersal
system may be approved for use in applications for which a conventional
wastewater system is unsuitable. The Commission may impose any design,
operation, maintenance, monitoring, and management requirements on the use of
an accepted wastewater dispersal system that it determines to be
appropriate.
(2) "Controlled demonstrationProvisional
wastewater system" means any wastewater system or any technology, device,
or component of a wastewater system that, on the basis of (i) research acceptable
research, is approved by to the Department or (ii) approval of
the wastewater system by a nationally recognized certification body for a
period that exceeds one year for research, testing, or trial use under
actual field conditions in this State pursuant to a protocol that has been
approved by the Department.
(3) "Conventional wastewater system", "conventional
sewage system", or "conventional septic tank system" means a subsurface
wastewater system that consists of a traditional septic or settling tank
and a gravity‑fed subsurface disposal dispersal field that
uses washed natural stone or gravel or crushed stoneof
approved size and grade and piping to distribute effluent to soil in one or
more nitrification trenches and that does not include any other appurtenance.
(4) "Experimental wastewater system"
means any wastewater system or any technology, device, or component of a
wastewater system that is approved by the Department for research, testing, or
limited trial use under actual field conditions in this State pursuant to a
protocol that has been approved by the Department.
(5) "Innovative wastewater system" means any
wastewater system, other than a conventional wastewater system, provisional
wastewater system, or any technology, device, or component of a wastewater
system that:that either:
a. (i) hasHas been demonstrated
to perform in a manner equal or superior to a conventional wastewater system; (ii)
is constructed of materials whose physical and chemical properties provide
the strength, durability, and chemical resistance to allow the system to
withstand loads and conditions as required by rules adopted by the Commission;
and (iii) has been approved by the Department for general use or for one
or more specific applications.
b. Remains on a list of the applicable nationally recognized standards for a period that exceeds two years and satisfies the treatment limits adopted by the Department.
An innovative wastewater system may be approved for use in applications for which a conventional wastewater system is unsuitable. The Department may impose any design, operation, maintenance, monitoring, and management requirements on the use of an innovative wastewater system that it determines to be appropriate. A wastewater system approved by a nationally recognized certification body and in compliance with the ongoing verification program of such body may submit a sampling protocol for innovative system approval that reduces the data sets required for such approval by fifty percent (50%). Such an application shall include all of the data associated with the nationally recognized certification body's verification of the system's performance.
(6) "Nationally recognized certification body" means NSF International; the International Association of Plumbing and Mechanical Officials; the Bureau of Normalization of Quebec; or another certification body for wastewater systems or system components accredited by the American National Standards Institute or the Standards Council of Canada.
(b) Adoption of Rules Governing Approvals. – The
Commission shall adopt rules for the approval and permitting of experimental,
controlled demonstration, innovative, conventional, provisional, and
accepted wastewater systems. The rules shall address the criteria to be
considered prior to issuing a permit an approval for a system, requirements
for preliminary design plans and specifications that must be submitted,
methodology to be used, standards for monitoring and evaluating the system,
research evaluation of the system, the plan of work for monitoring system
performance and maintenance, and any additional matters the Commission deems
appropriate.determines are necessary for verification of the performance
of a wastewater system or system component.
(c) Approved Systems. – Procedure for Modifications
or Revocations. – The Department may modify, suspend, or revoke the
approval of a wastewater system if the Department determines that the approval
is based on false, incomplete, or misleading information or if the Department
finds that modification, suspension, or revocation is necessary to protect
public health, safety, or welfare. The Department shall provide a listing of
all approved experimental, controlled demonstration, innovative, provisional,
and accepted wastewater systems to the local health departments annually,
and more frequently, when the Department makes a final agency decision
related to the approval of a wastewater system or the Commission adopts rules
related to the notify the local health departments within 30 days of any
modification or revocation of an approval of a wastewater system.system
or system component.
(d) Evaluation Protocols. – The Department shall
approve one or more nationally recognized protocols for the evaluation of on‑site
subsurface wastewater systems. Any protocol approved by the Department
shall specify a minimum number of sites that must be evaluated and the duration
of the evaluation period. At the request of a manufacturer of a wastewater
system, the Department may approve an alternative protocol for use in the
evaluation of the performance of the manufacturer's wastewater system. A
protocol for the evaluation of an on‑site subsurface a wastewater
system approved by the Department pursuant to this section is a
scientific standard within the meaning of G.S. 150B‑2(8a)h.
(e) Experimental Systems. – A manufacturer
of a wastewater system that is intended for on‑site subsurface use may
apply to the Department to have the system evaluated as an experimental
wastewater system as provided in this subsection. The manufacturer shall submit
a proposal for evaluation of the system to the Department. The proposal for
evaluation shall include the design of the system, a description of any
laboratory or field research or testing that will be used to evaluate the
system, a description of the research or testing protocol, and the credentials
of the independent laboratory, consultant, or other entity that will be
conducting the research or testing on the system. The proposal may include an
evaluation of research and testing conducted in other states to the extent that
the research and testing involves soil types, climate, hydrology, and other
relevant conditions that are comparable to conditions in this State and if the
research or testing was conducted pursuant to a protocol acceptable to the
Department. The manufacturer shall enter into a contract for an evaluation of
the performance of the experimental wastewater system with an independent
laboratory, consultant, or other entity that has expertise in the evaluation of
wastewater systems and that is approved by the Department. The manufacturer may
install up to 50 experimental systems pursuant to a protocol approved by the
Department on sites that are suitable for a conventional wastewater system and
that have a repair area of sufficient size to allow installation of a conventional
wastewater system, an approved innovative wastewater system, or an accepted
wastewater system if the experimental wastewater system fails to perform
properly.
(f) Controlled Demonstration Provisional Systems.
– A manufacturer of a wastewater system intended for on‑site
subsurface use may apply to the Department to have the system evaluated
as a controlled demonstration wastewater system as provided in this subsection.
provisionally approved for use in this State. Any wastewater system
approved based on its approval by a nationally recognized certification body
must be designed and installed in a manner consistent with the system evaluated
and approved by the nationally recognized certification body. The
manufacturer shall submit a proposal for evaluation of the system to the
Department. The proposal shall contain procedures for obtaining specified
information necessary to achieve innovative status upon completion of the
provisional status. The proposal for evaluation shall include the design of
the system, a description of any laboratory or field research or testing that
will be used to evaluate the system, a description of the research or testing
protocol, and the credentials of the independent laboratory, consultant, or
other entity that will be conducting the research or testing on the system.
If the system was evaluated as an experimental system under subsection (e) of
this section, the proposal shall include the results of the evaluation. The
proposal may include an evaluation of research and testing conducted in other
states to the extent that the research and testing involves soil types,
climate, hydrology, and other relevant conditions that are comparable to
conditions in this State and if the research or testing was conducted pursuant
to a protocol acceptable to the Department. The manufacturer shall enter into a
contract for an evaluation of the performance of the controlled demonstration
wastewater system with an independent laboratory, consultant, or other entity
that has expertise in the evaluation of wastewater systems and that is approved
by the Department. The manufacturer may install up to 200 controlled
demonstrationprovisional wastewater systems pursuant to a
protocol approved by the Department on sites that are suitable for a
conventional wastewater system and that have a repair area of sufficient size
to allow installation of a conventional wastewater system, an approved
innovative wastewater system, or an accepted wastewater system if the controlled
demonstration provisional wastewater system fails to perform
properly. If the controlled demonstrationprovisional wastewater
system is intended for use on sites that are not suitable, or that are
provisionally suitable,suitable for a conventional wastewater
system, the Department may approve the installation of the controlled
demonstrationprovisional wastewater system if the Department
determines that the manufacturer can provide an acceptable alternative method
for collection, treatment, and disposal dispersal of the
wastewater. The Department shall approve applications for provisional
systems based on approval by a nationally recognized certification body within
90 days of receipt of a complete application. A manufacturer that chooses to
remove its product from the nationally recognized standard during the
provisional approval may continue its application in this State pursuant to
requirements and procedures established by the Department.
(g) Innovative Systems. – A manufacturer of a
wastewater system for on‑site subsurface use that has been evaluated
as an experimentalmay apply for and be considered for innovative system
status by the Department in one of the following ways:
(1) If the wastewater system has been
approved as a provisional wastewater system pursuant to subsection (f) of this
section, the manufacturer may apply to have the system approved as an
innovative wastewater system based on successful completion of the evaluation
protocols established pursuant to subsection (d) of this section.wastewater
system as provided in subsection (e) of this section or that has been evaluated
as a controlled demonstration wastewater system as provided in subsection (f)
of this section may apply to the Department to have the system approved as an
innovative wastewater system as provided in this subsection.
(2) A manufacturer of aIf the
wastewater system for on‑site subsurface use that has not been
evaluated or approved as an experimentala provisional
wastewater system or as a controlled demonstration wastewater system pursuant
to subsection (f) of this section, the manufacturer may also apply
to the Department to have the system approved as an innovative wastewater
system on the basis of comparable research and testing conducted in
other states. The manufacturer shall provide the Department with the data and
findings of all evaluations of the performance of the system that have been
conducted in any state by or on behalf of the manufacturer. The manufacturer
shall also provide the Department with a summary of the data and findings of
all other evaluations of the performance of the system that are known to the
manufacturer.
(3) If the wastewater system has not been evaluated or approved as a provisional system pursuant to subsection (f) of this section, but has been evaluated under protocol established by a nationally recognized certification body for at least two consecutive years, has been found to perform acceptably based on the criteria of the protocol, and is designed and will be installed in a manner consistent with the system evaluated and approved by the nationally recognized certification body, the manufacturer may apply to have the system approved as an innovative wastewater system.
Within 30 days of receipt of the initial application, the
Department shall either (i) notify the manufacturer of any items necessary to
complete the application or (ii) notify the manufacturer that its application
is complete. The Department shall publish a notice that the manufacturer
has submitted an application under this subsection in the North Carolina
Register and may provide additional notice to the public via the Internet or by
other means. The Department shall receive public comment on the application for
at least 30 days after the date the notice is published in the North Carolina
Register. In making a determination under this subsection, the Department shall
consider the data, findings, and recommendations submitted by the manufacturer
and all public comment. The Department may also consider any other information
that the Department determines to be relevant. The Department shall determine:
(i) whether the system performs in a manner equal or superior to a conventional
wastewater system;system, in terms of structural integrity,
treatment, and hydraulic performance; (ii) whether the system is
constructed of materials whose physical and chemical properties provide the
strength, durability, and chemical resistance to allow the system to withstand
loads and conditions as required by rules adopted by the Commission; (iii) the
circumstances in which use of the system is appropriate; and (iv) any
conditions and limitations related to the use of the system. The Department
shall make the determinations required by this subsection and approve or deny
the application within 180 90 days after the Department receives
a complete application from a manufacturer. If the Department fails to act on
the application within 180 days,90 days of the notice of receipt of
the complete application, the manufacturer may treat the application as
denied and challenge the denial by filing a contested case as provided in
Article 3 of Chapter 150B of the General Statutes. If the Department approves
an innovative wastewater system, the Department shall notify the
manufacturer of the approval and specify the circumstances in which use of
the system is appropriate and any conditions and limitations related to the use
of the system.
(g1) Approval of Functionally Equivalent Trench Systems as Innovative Systems. – A manufacturer of a wastewater trench system may petition the Commission to have the wastewater trench system approved as an innovative wastewater system as provided in this subsection.
(1) The Commission shall approve a wastewater trench system as an innovative wastewater system if it finds that there is clear, convincing, and cogent evidence that the wastewater trench system is functionally equivalent to a wastewater trench system that is approved as an accepted wastewater system. A wastewater trench system shall be considered functionally equivalent to an accepted wastewater trench system if the performance characteristics of the wastewater trench system satisfy all of the following requirements:
a. The physical properties and chemical durability of the materials from which the wastewater trench system is constructed are equal to or superior to the physical properties and chemical durability of the materials from which the accepted wastewater trench system is constructed.
b. The permeable sidewall area and bottom infiltrative area of the wastewater trench system are equal to or greater than the permeable sidewall area and bottom infiltrative area of the accepted wastewater trench system at a field‑installed size.
c. The wastewater trench system utilizes a similar method and manner of function for the conveyance and application of effluent as the accepted wastewater trench system.
d. The structural integrity of the wastewater trench system is equal to or superior to the structural integrity of the accepted wastewater trench system.
e. The wastewater trench system shall provide a field installed system storage volume equal to or greater than the field installed system storage volume of the accepted wastewater trench system.
(2) As part of its petition, the manufacturer shall provide to the Commission all of the following information:
a. Specifications of the wastewater trench system.
b. Data necessary to demonstrate that the wastewater trench system is functionally equivalent to a wastewater trench system that is approved as an accepted wastewater system.
c. A certified statement from an independent, third‑party professional engineer or testing laboratory that, based on verified documentation, the wastewater trench system is functionally equivalent to an accepted wastewater system.
(3) Approval of a wastewater trench system as an innovative wastewater system shall not be conditioned on the manufacturer of the wastewater trench system having operational systems installed in the State.
(4) The Commission shall authorize the use of a wastewater trench system as an innovative wastewater system in the same applications as the accepted wastewater trench system.
(5) The Commission shall not include conditions and limitations in the approval of a wastewater trench system as an innovative wastewater system that are not included in the approval of the accepted wastewater trench system.
(h) Accepted Wastewater Dispersal Systems. – A
manufacturer of an innovative wastewater dispersal system that has been
in general use in this State for more thana minimum of five years
may petition the Commission to have the system designated as an accepted
wastewater system as provided in this subsection. The manufacturer shall
provide the Commission with the data and findings of all prior evaluations of
the performance of the system.system in this State and other states
referenced in the petition, including disclosure of any conditions found to
result in unacceptable structural integrity, treatment, or hydraulic
performance. In addition, the manufacturer shall provide the Commission
with information sufficient to enable the Commission to fully evaluate the
performance of the system in this State for at least the five‑year period
immediately preceding the petition. The Commission shall designate a wastewater
system as an accepted wastewater system only if it finds that there is clear,
convincing, and cogent evidence (i) to confirm the findings made by the
Department at the time the Department approved the system as an innovative
wastewater system and (ii) that the system performs in a manner that is equal
or superior to a conventional wastewater system under actual field conditions
in this State. The Commission shall specify the circumstances in which use of
the system is appropriate and any conditions and limitations related to the use
of the system.
(i) Miscellaneous Provisions. –Nonproprietary
Wastewater Systems. –
(1) In evaluating applications for approval
under this section, the Department may consult with persons who have special
training and experience related to on‑site subsurface wastewater systems
and may form a technical advisory committee for this purpose. However, the
Department is responsible for making timely and appropriate determinations
under this section.
(2) The Department may initiate a review of a
nonproprietary wastewater system and approve the system for on‑site
subsurface use as an experimental wastewater system, a controlled
demonstration wastewater system, as a provisional wastewater system or
an innovative wastewater system without having received an application from a
manufacturer. The Department may recommend that the Commission designate a
nonproprietary wastewater system as an accepted wastewater system without
having received a petition from a manufacturer.
(j) Warranty Required in Certain
Circumstances. – The Department shall not approve a reduction of the total
nitrification trench length for an innovative wastewater system or accepted
wastewater system handling untreated septic tank effluent of more than twenty‑five
percent (25%) as compared to the total nitrification trench length required for
a 36‑inch‑wide conventional wastewater system unless the
manufacturer of the innovative wastewater system or accepted wastewater system
provides a performance warranty for the nitrification trench system to each
owner or purchaser of the system for a warranty period of at least five years
from the date on which the wastewater system is placed in operation. The
warranty shall provide that the manufacturer shall provide all material and
labor that may be necessary to provide a fully functional wastewater system. The
Commission shall establish minimum terms and conditions for the warranty
required by this subsection. This subsection shall not be construed to require
that a manufacturer warrant a wastewater system that is not properly sized to
meet the design load required for a particular use, that is improperly
installed, or that is improperly operated and maintained.
(j1) Clarification With Respect to Certain Dispersal Media. – In considering the application by a manufacturer of a wastewater system utilizing expanded polystyrene synthetic aggregate particles as a septic effluent dispersal medium for approval of the system under this section, neither the Commission nor the Department may condition, delay, or deny the approval based on the particle or bulk density of the expanded polystyrene material. With respect to approvals already issued by the Department or Commission that include conditions or requirements related to the particle or bulk density of expanded polystyrene material, the Commission or Department, as applicable, shall promptly reissue all such approvals with the conditions and requirements relating to the density of expanded polystyrene material permanently deleted while leaving all other terms and conditions of the approval intact.
(k) Fees. – The Department shall collect the following fees under this section:
(1) Review of an alternative protocol
under subsection (d) of this section $1,000.00
(2) Review
of an experimental system $3,000.00
(3) Review
of a controlled demonstrationprovisional system $3,000.00
(4) Review of an innovative system $3,000.00
(5) Review of an accepted system $3,000.00
(6) Review of a residential wastewater treatment
system pursuant to G.S. 130A‑342 $1,500.00
(7) Review of a component or device required of a system $ 100.00
(8) Modification to approved accepted, provisional, or $1,000.00
innovative system
(l) On‑Site Wastewater System Account. – The On‑Site Wastewater System Account is established as a nonreverting account within the Department. Fees collected pursuant to this section shall be placed in the On‑Site Wastewater System Account and shall be applied only to the costs of implementing this section."
SECTION 4.15.(b) The Commission for Public Health shall review and amend its rules to implement Section 4.15(a) of this act.
SECTION 4.15.(c) Beginning October 1, 2015, and every quarter thereafter until all rules required pursuant to Sections 4.14 and 4.15 of this act are adopted or amended, the Commission for Public Health shall submit written reports as to its progress on adopting or amending rules as required by Sections 4.14 and 4.15 of this act to the Environmental Review Commission and the Joint Legislative Oversight Committee on Health and Human Services. The Commission shall supplement the written reports required by this subsection with additional written and oral reports as may be requested by the Environmental Review Commission and the Joint Legislative Oversight Committee on Health and Human Services. The Commission shall submit the written reports required by this subsection whether or not the General Assembly is in session at the time the report is due.
SECTION 4.15.(d) The Commission for Public Health, in consultation with the Department of Health and Human Services, local health departments, and stakeholders representing the wastewater system industry, shall study the costs and benefits of requiring treatment standards greater than those listed by nationally recognized standards, including the recorded advantage of such higher treatment standards for the protection of the public health and the environment. The Commission shall report its findings and recommendations, including any legislative proposals, to the Environmental Review Commission and the Joint Legislative Oversight Committee on Health and Human Services on or before January 1, 2016.
CONTESTED CASES FOR AIR PERMITS
SECTION 4.17. G.S. 143‑215.108 reads as rewritten:
"§ 143‑215.108. Control of sources of air pollution; permits required.
…
(e) A permit applicant, permittee, or third partyapplicant
or permittee who is dissatisfied with a decision of the Commission on a
permit application may commence a contested case by filing a petition under
G.S. 150B‑23 within 30 days after the Commission notifies the
applicant or permittee of its decision. If the permit applicant, permittee,
or third partyapplicant or permittee does not file a petition within
the required time, the Commission's decision on the application is final and is
not subject to review. The filing of a petition under this subsection will
stay the Commission's decision until resolution of the contested case.
(e1) A person other than a permit applicant or permittee who is a person aggrieved by the Commission's decision on a permit application may commence a contested case by filing a petition under G.S. 150B‑23 within 30 days after the Commission provides notice of its decision on a permit application, as provided in G.S. 150B‑23(f), or by posting the decision on a publicly available Web site. The filing of a petition under this subsection does not stay the Commission's decision except as ordered by the administrative law judge under G.S. 150B‑33(b).
…."
AMEND ISOLATED WETLANDS LAW
SECTION 4.18.(a) For the purposes of implementing Section .1300 of Subchapter 2H of Chapter 2 of Title 15A of the North Carolina Administrative Code (Discharges to Isolated Wetlands and Isolated Waters), the isolated wetlands provisions of Section .1300 shall apply only to a Basin Wetland or Bog and no other wetland types as described in the North Carolina Wetland Assessment User Manual prepared by the North Carolina Wetland Functional Assessment Team, version 4.1 October 2010 that are not jurisdictional wetlands under the federal Clean Water Act. The isolated wetlands provisions of Section .1300 shall not apply to an isolated man‑made ditch or pond constructed for stormwater management purposes, any other man‑made isolated pond, or any other type of isolated wetland, and the Department of Environment and Natural Resources shall not regulate such water bodies under Section .1300.
SECTION 4.18.(b) The Environmental Management Commission may adopt rules to amend Section .1300 of Subchapter 2H of Chapter 2 of Title 15A of the North Carolina Administrative Code consistent with subsection (a) of this section.
SECTION 4.18.(c) Section 54 of S.L. 2014‑120 reads as rewritten:
"SECTION 54.(a) Until the effective date of the revised permanent rule that the Environmental Management Commission is required to adopt pursuant to Section 54(c) of this act, the Commission and the Department of Environment and Natural Resources shall implement 15A NCAC 02H .1305 (Review of Applications) as provided in Section 54(b) of this act.
"SECTION 54.(b) Notwithstanding 15A NCAC 02H .1305 (Review of Applications), all of the following shall apply to the implementation of 15A NCAC 02H .1305:
(1) The amount of impacts of isolated wetlands under
15A NCAC 02H .1305(d)(2) shall be less than or equal to one acre of isolated
wetlands east of I‑95 for the entire project and less than or equal to
1/3 acre of isolated wetlands west of I‑95 for the entire project.
(2) Mitigation requirements for impacts to isolated
wetlands shall only apply to the amount of impact that exceeds the threshold
set out in subdivision (1) of this section. The mitigation ratio for impacts
of greater than one acre exceeding the threshold for the entire
project under 15A NCAC 02H .1305(g)(6) shall be 1:1 and may be located on the
same parcel.
(3) For purposes of Section 54(b) of this
section, "isolated wetlands" means a Basin Wetland or Bog as
described in the North Carolina Wetland Assessment User Manual prepared by the
North Carolina Wetland Functional Assessment Team, version 4.1 October, 2010,
that are not jurisdictional wetlands under the federal Clean Water Act. An "isolated
wetland" does not include an isolated man‑made ditch or pond
constructed for stormwater management purposes or any other man‑made
isolated pond.
(4) Impacts to isolated wetlands shall not be combined with the project impacts to 404 jurisdictional wetlands or streams for the purpose of determining when impact thresholds that trigger a mitigation requirement are met.
"SECTION 54.(c) The Environmental Management Commission shall adopt rules to amend 15A NCAC 02H .1300 through 15A NCAC 02H .1305 consistent with Section 54(b) of this act. Notwithstanding G.S. 150B‑19(4), the rule adopted by the Commission pursuant to this subsection shall be substantively identical to the provisions of Section 54(b) of this act. Rules adopted pursuant to this subsection are not subject to Part 3 of Article 2A of Chapter 150B of the General Statutes. Rules adopted pursuant to this subsection shall become effective as provided in G.S. 150B‑21.3(b1) as though 10 or more written objections had been received as provided by G.S. 150B‑21.3(b2).
"SECTION 54.(d) The Department of Environment and Natural Resources shall study (i) how the term "isolated wetland" has been previously defined in State law and whether the term should be clarified in order to provide greater certainty in identifying isolated wetlands; (ii) the surface area thresholds for the regulation of mountain bog isolated wetlands, including whether mountain bog isolated wetlands should have surface area regulatory thresholds different from other types of isolated wetlands; and (iii) whether impacts to isolated wetlands should be combined with the project impacts to jurisdictional wetlands or streams for the purpose of determining when impact thresholds that trigger a mitigation requirement are met. The Department shall report its findings and recommendations to the Environmental Review Commission on or before November 1, 2014.
"SECTION 54.(e) This section is effective when it becomes law. Section 54(b) of this act expires on the date that rules adopted pursuant to Section 54(c) of this act become effective."
AMEND COASTAL STORMWATER REQUIREMENTS
SECTION 4.19.(a) Section 2(b) of S.L. 2008‑211 reads as rewritten:
"SECTION 2.(b)
Requirements for Certain Nonresidential and Residential Development in the
Coastal Counties. – All nonresidential development activities that occur
within the Coastal Counties that will add more than 10,000 square feet of
built upon area or that require a Sedimentation and Erosion Control Plan,
pursuant to G.S. 113A‑57 or a Coastal Area Management Act (CAMA) Major
Development Permit, pursuant to G.S. 113A‑118 and all residential
development activities within the Coastal Counties that require a Sedimentation
and Erosion Control Plan, pursuant to G.S. 113A‑57 or a Coastal Area
Management Act (CAMA) Major Development Permit, pursuant to G.S. 113A‑118
shall manage stormwater runoff as provided in this subsection. A development
activity or project requires a Sedimentation and Erosion Control Plan if the
activity or project disturbs one acre or more of land, including an activity or
project that disturbs less than one acre of land that is part of a larger
common plan of development. Whether an activity or project that disturbs less
than one acre of land is part of a larger common plan of development shall be
determined in a manner consistent with the memorandum referenced as "Guidance
Interpreting Phase 2 Stormwater Requirements" from the Director of the
Division of Water Quality of the Department of Environment and Natural
Resources to Interested Parties dated 24 July 2006.
(1) Development Near Outstanding Resource Waters (ORW).
– Development activities within the Coastal Counties and located within 575
feet of the mean high waterline of areas designated by the Commission as
Outstanding Resource Waters (ORW) shall meet the requirements of 15A NCAC
02H .1007 (Stormwater Requirements: Outstanding Resource Waters) and shall
be permitted as follows:
a. Low‑Density Option. – Development shall be permitted pursuant to 15A NCAC 02H .1003(d)(1) if the development meets all of the following requirements:
1. The development has a built upon area of twelve
percent (12%)twenty‑four percent (24%) or less. A development
project with an overall density at or below the low‑density threshold,
but containing areas with a density greater than the overall project density,
shall be considered low‑density as long as the project meets or exceeds
the requirements for low‑density development and locates the higher
density development in upland areas and away from surface waters and
drainageways to the maximum extent practicable.
2. Stormwater runoff from the development is transported primarily by vegetated conveyances. As used in this sub‑sub‑subdivision, "conveyance system" shall not include a stormwater collection system. Stormwater runoff from built upon areas that is directed to flow through any wetlands shall flow into and through these wetlands at a non‑erosive velocity.
3. The development contains a 50‑foot‑wide vegetative buffer for new development activities and a 30‑foot‑wide vegetative buffer for redevelopment activities. The width of a buffer is measured horizontally from the normal pool elevation of impounded structures, from the bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. The vegetative buffer may be cleared or graded, but must be planted with and maintained in grass or any other vegetative or plant material. The Division of Water Quality may, on a case‑by‑case basis, grant a minor variance from the vegetative buffer requirements of this section pursuant to the procedures set out in 15A NCAC 02B .0233(9)(b). Vegetative buffers and filters required by this section and any other buffers or filters required by State water quality or coastal management rules or local government requirements may be met concurrently and may contain, in whole or in part, coastal, isolated, or 404 jurisdictional wetlands that are located landward of the normal waterline.
b. High‑Density Option. – Development shall be permitted pursuant to 15A NCAC 02H .1003(d)(2) if the development meets all of the following requirements:
1. The development has a built upon area of greater
than twelve percent (12%).twenty‑four percent (24%).
2. The development has no direct outlet channels or pipes to Class SA waters unless permitted in accordance with 15A NCAC 02H .0126. Stormwater runoff from built upon areas that is directed to flow through any wetlands shall flow into and through these wetlands at a non‑erosive velocity.
3. The development utilizes control systems that are any combination of infiltration systems, bioretention systems, constructed stormwater wetlands, sand filters, rain barrels, cisterns, rain gardens or alternative low impact development stormwater management systems designed in accordance with 15A NCAC 02H .1008 to control and treat the runoff from all surfaces generated by one and one‑half inches of rainfall, or the difference in the stormwater runoff from all surfaces from the predevelopment and postdevelopment conditions for a one‑year, 24‑hour storm, whichever is greater. Wet detention ponds may be used as a stormwater control system to meet the requirements of this sub‑sub‑subdivision, provided that the stormwater control system fully complies with the requirements of this sub‑subdivision. If a wet detention pond is used within one‑half mile of Class SA waters, installation of a stormwater best management practice in series with the wet detention pond shall be required to treat the discharge from the wet detention pond. Secondary stormwater best management practices that are used in series with another stormwater best management practice do not require any minimum separation from the seasonal high water table. Alternatives as described in 15A NCAC 02H .1008(h) may also be approved if they meet the requirements of this sub‑subdivision.
4. Stormwater runoff from the development that is in excess of the design volume must flow overland through a vegetative filter designed in accordance with 15A NCAC 02H .1008 with a minimum length of 50 feet measured from mean high water of Class SA waters.
5. The development contains a 50‑foot‑wide vegetative buffer for new development activities and a 30‑foot‑wide vegetative buffer for redevelopment activities. The width of a buffer is measured horizontally from the normal pool elevation of impounded structures, from the bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. The vegetative buffer may be cleared or graded, but must be planted with, and maintained in, grass or any other vegetative or plant material. Furthermore, stormwater control best management practices (BMPs), or stormwater control structures, with the exception of wet detention ponds, may be located within this vegetative buffer. The Division of Water Quality may, on a case by case basis, grant a minor variance from the vegetative buffer requirements of this section pursuant to the procedures set out in 15A NCAC 02B .0233(9)(b). Vegetative buffers and filters required by this section and any other buffers or filters required by State water quality or coastal management rules or local government requirements may be met concurrently and may contain, in whole or in part, coastal, isolated, or 404 jurisdictional wetlands that are located landward of the normal waterline.
…."
SECTION 4.19.(b) Section 2(c) of S.L. 2008‑211 reads as rewritten:
"SECTION 2.(c) Requirements for Limited
Residential Development in Coastal Counties. – For residential development
activities within the 20 Coastal Counties that are located within one‑half
mile and draining to Class SA waters, that have a built upon area greater than twelve
percent (12%),twenty‑four percent (24%), that do not require a
stormwater management permit under subsection (b) of this section, and that
will add more than 10,000 square feet of built upon area, a one‑time,
nonrenewable stormwater management permit shall be obtained. The permit shall
require recorded deed restrictions or protective covenants to ensure that the
plans and specifications approved in the permit are maintained. Under this
permit, stormwater runoff shall be managed using any one or combination of the
following practices:
(1) Install rain cisterns or rain barrels designed to collect all rooftop runoff from the first one and one‑half inches of rain. Rain barrels and cisterns shall be installed in such a manner as to facilitate the reuse of the collected rain water on site and shall be installed in such a manner that any overflow from these devices is directed to a vegetated area in a diffuse flow. Construct all uncovered driveways, uncovered parking areas, uncovered walkways, and uncovered patios out of permeable pavement or other pervious materials.
(2) Direct rooftop runoff from the first one and one‑half inches of rain to an appropriately sized and designed rain garden. Construct all uncovered driveways, uncovered parking areas, uncovered walkways, and uncovered patios out of permeable pavement or other pervious materials.
(3) Install any other stormwater best management practice that meets the requirements of 15A NCAC 02H .1008 to control and treat the stormwater runoff from all built upon areas of the site from the first one and one‑half inches of rain."
SECTION 4.19.(c) As necessary to comply with federal stormwater management requirements, the rescission of designations of local governments within the 20 Coastal Counties as Phase 2 municipalities pursuant to Section 3 of S.L. 2008‑211 is repealed.
SECTION 4.19.(d) This section becomes effective January 1, 2016.
EXEMPT LINEAR UTILITY PROJECTS FROM CERTAIN ENVIRONMENTAL REGULATIONS
SECTION 4.21. Article 17 of Chapter 62 of the General Statutes is amended by adding a new section to read:
"§ 62‑351. Exempt linear utility projects from certain environmental regulations.
Except as required by federal law, activities related to the construction, maintenance, or removal of a linear utility project shall be exempt from regulation by an agency authorized to implement and enforce State and federal environmental laws. For purposes of this section, "linear utility project" means an electric power line, water line, sewage line, stormwater drainage line, telephone line, cable television line, data transmission line, or natural gas pipeline. For purposes of this section, "an agency authorized to implement and enforce State and federal environmental laws" means any of the following:
(1) The Department of Environment and Natural Resources created pursuant to G.S. 143B‑279.1.
(2) The Environmental Management Commission created pursuant to G.S. 143B‑282.
(3) The Coastal Resources Commission established pursuant to G.S. 113A‑104.
(4) The Marine Fisheries Commission created pursuant to G.S. 143B‑289.51.
(5) The Wildlife Resources Commission created pursuant to G.S. 143‑240.
(6) The Commission for Public Health created pursuant to G.S. 130A‑29.
(7) The Sedimentation Control Commission created pursuant to G.S. 143B‑298.
(8) The North Carolina Mining and Energy Commission created pursuant to G.S. 143B‑293.1.
(9) The North Carolina Oil and Gas Commission created pursuant to G.S. 143B‑293.1."
REPEAL DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES IDLING RULES
SECTION 4.24. The Secretary of Environment and Natural Resources shall repeal 15A NCAC 02D .1010 (Heavy‑Duty Vehicle Idling Restrictions) on or before December 1, 2015. Until the effective date of the repeal of the rule required pursuant to this section, the Secretary, the Department of Environment and Natural Resources, the Environmental Management Commission, or any other political subdivision of the State shall not implement or enforce 15A NCAC 02D .1010 (Heavy‑Duty Vehicle Idling Restrictions).
AMBIENT AIR MONITORING
SECTION 4.25.(a) The Department of Environment and Natural Resources shall review its ambient air monitoring network and, in the next annual monitoring network plan submitted to the United States Environmental Protection Agency, shall request the removal of any ambient air monitors not required by applicable federal laws and regulations.
SECTION 4.25.(b) No later than September 1, 2016, the Department of Environment and Natural Resources shall discontinue all ambient air monitors not required by applicable federal laws and regulations if approval from the United States Environmental Protection Agency is not required for the discontinuance.
SECTION 4.25.(c) Nothing in this section is intended to prevent the Department from installing temporary ambient air monitors as part of an investigation of a suspected violation of air quality rules, standards, or limitations or in response to an emergency situation causing an imminent danger to human health and safety.
SECTION 4.25.(d) The Division of Air Quality, Department of Environment and Natural Resources, shall report to the Environmental Review Commission no later than November 1, 2016, on the status of the ambient air monitoring network and the Division's implementation of the requirements of this section.
DIVISION OF AIR QUALITY NOTICE REQUIREMENTS
SECTION 4.27. G.S. 143‑215.110 reads as rewritten:
"§ 143‑215.110. Special orders.
(a) Issuance. – The Commission is hereby empowered, after the effective date of standards and classifications adopted pursuant to G.S. 143‑215.107, to issue (and from time to time to modify or revoke) a special order or other appropriate instrument, to any person whom it finds responsible for causing or contributing to any pollution of the air within the area for which standards have been established. Such an order or instrument may direct such person to take or refrain from taking such action, or to achieve such results, within a period of time specified by such special order, as the Commission deems necessary and feasible in order to alleviate or eliminate such pollution. The Commission is authorized to enter into consent special orders, assurances of voluntary compliance or other similar documents by agreement with the person responsible for pollution of the air, subject to the provisions of subsection (a1) of this section regarding proposed orders, and such consent order, when entered into by the Commission after public review, shall have the same force and effect as a special order of the Commission issued pursuant to hearing.
(a1) Public Notice and Review of Consent Orders.
(1) The Commission shall give notice of a proposed
consent order to the proper State, interstate, and federal agencies, to
interested persons, and to the public. The Commission may also provide any
other data it considers appropriate to those notified. The Commission shall
prescribe the form and content of the notice. The notice shall be given at
least 45 30 days prior to any final action regarding the consent
order. Public notice shall be given by publication of the notice one time in
a newspaper having general circulation within the county in which the pollution
originates.for 30 days on the regulatory agency Web site.
(2) Any person who desires a public meeting on any
proposed consent order may request one in writing to the Commission within 30
days following date of the notice of the proposed consent order. The Commission
shall consider all such requests for meetings. If the Commission determines
that there is significant public interest in holding a meeting, the Commission
shall schedule a meeting and shall give notice of such meeting at least 30 days
in advance to all persons to whom notice of the proposed consent order was
given and to any other person requesting notice. At least 30 days prior to the
date of meeting, the Commission shall also have a copy of the notice of the
meeting published at least one time in a newspaper having general
circulation within the county in which the pollution originates.for 30
days on the regulatory agency Web site. The Commission shall prescribe the
form and content of notices under this subsection.
…."
DISCLOSURE OF PERSONAL IDENTIFYING INFORMATION
SECTION 4.29.(a) G.S. 143‑254.5 reads as rewritten:
"§ 143‑254.5. Disclosure of personal identifying information.
Social security numbers and identifying information obtained by the Commission shall be treated as provided in G.S. 132‑1.10. For purposes of this section, "identifying information" also includes a person's mailing address, residence address, e‑mail address, date of birth, and telephone number."
SECTION 4.29.(b) G.S. 143B‑289.52(h) reads as rewritten:
"(h) Social security numbers and identifying information obtained by the Commission or the Division of Marine Fisheries shall be treated as provided in G.S. 132‑1.10. For purposes of this subsection, "identifying information" also includes a person's mailing address, residence address, e‑mail address, date of birth, and telephone number."
provide regulatory relief by increasing thresholds for mitigation of linear stream impacts
SECTION 4.30.(a) The Environmental Management Commission shall amend its rules for water quality certifications (15A NCAC 2H .0501 through 2H .0507) to provide for all of the following:
(1) With respect to mitigation required for activities that result in the loss of a perennial stream or an ephemeral/intermittent stream, the requirement of mitigation by the U.S. Army Corps of Engineers for less than 300 linear feet of streambed shall not be considered to be the mitigation required by the water quality certification, unless the Commission makes a specific finding based upon ecological, hydrological, or other scientific data that total, critical, and irreversible damage to existing uses of the stream will occur if no mitigation is required.
(2) In cases where more than 300 linear feet of streambed are lost, the Commission shall require mitigation at a one‑to‑one ratio only for the number of feet of streambed lost above 300 linear feet.
SECTION 4.30.(b) The Environmental Management Commission shall adopt temporary rules to implement this section no later than September 30, 2015. The Commission shall also adopt permanent rules to implement this section.
PROHIBIT THE REQUIREMENT OF MITIGATION FOR IMPACTS TO INTERMITTENT STREAMS
SECTION 4.31.(a) Article 21 of Chapter 143 of the General Statutes is amended by adding a new section to read:
"§ 143‑214.7C. Prohibit the requirement of mitigation for impacts to intermittent streams.
Except as required by federal law and notwithstanding any other provision of State law, the Department of Environment and Natural Resources shall not require mitigation for impacts to an intermittent stream. For purposes of this section, "intermittent stream" means a well‑defined channel that has all of the following characteristics:
(1) It contains water for only part of the year, typically during winter and spring when the aquatic bed is below the water table.
(2) The flow of water in the intermittent stream may be heavily supplemented by stormwater runoff.
(3) It often lacks the biological and hydrological characteristics commonly associated with the conveyance of water."
SECTION 4.31.(b) The Department of Environment and Natural Resources and the Environmental Management Commission shall amend their rules so that the rules are consistent with the provisions of G.S. 143‑214.7C, as enacted by subsection (a) of this section.
PIGEON HUNTING
SECTION 4.32. G.S. 113‑129(15a) reads as rewritten:
"(15a) Wild Birds. – Migratory game birds; upland game
birds; and all undomesticated feathered vertebrates. TheExcept as
otherwise provided in this subdivision, the Wildlife Resources Commission
may by regulation list specific birds or classes of birds excluded from the
definition of wild birds based upon the need for protection or regulation in
the interests of conservation of wildlife resources. Pigeons are wild birds."
WILDLIFE RESOURCES COMMISSION STUDIES
SECTION 4.33.(a) The Wildlife Resources Commission shall review the methods and criteria by which it adds, removes, or changes the status of animals on the State protected animal list as defined in G.S. 113‑331 and compare these to federal regulations and the methods and criteria of other states in the region. The Commission shall also review the policies by which the State addresses introduced species and make recommendations for improving these policies, including impacts associated with hybridization that occurs among federally listed, State‑listed, and nonlisted animals.
SECTION 4.33.(b) The Wildlife Resources Commission shall report its findings and recommendations to the Environmental Review Commission by March 1, 2016.
SECTION 4.34.(a) The Wildlife Resources Commission shall establish a coyote management plan to address the impacts of coyotes in this State and the threats that coyotes pose to citizens, industries, and populations of native wildlife species within the State.
SECTION 4.34.(b) The Wildlife Resources Commission shall report its findings and recommendations, including any proposed legislation to address overpopulation of coyotes, to the Environmental Review Commission by March 1, 2016.
SECTION 4.35.(a) The Wildlife Resources Commission shall establish a pilot coyote management assistance program in Mitchell County. In implementing the program, the Commission shall document and assess private property damage associated with coyotes; evaluate effectiveness of different coyote control methodologies, including lethal removal; and evaluate potential for a scalable statewide coyote assistance program.
SECTION 4.35.(b) The Wildlife Resources Commission shall submit an interim report on the progress of the pilot program to the Environmental Review Commission by March 1, 2016. The Wildlife Resources Commission shall submit a final report on the results of the pilot program, including any proposed legislation, to the Environmental Review Commission by January 1, 2017.
ANIMAL WELFARE HOTLINE AND COURT FEE TO SUPPORT THE INVESTIGATION OF ANIMAL CRUELTY VIOLATIONS
SECTION 4.36.(a) Article 1 of Chapter 114 of the General Statutes is amended by adding a new section to read:
"§ 114‑8.7. Reports of animal cruelty and animal welfare violations.
(a) The Attorney General shall establish a hotline, to be known as the "NC Pets We Care Hotline," to receive reports of allegations of animal cruelty or violations of the Animal Welfare Act, Article 3 of Chapter 19A of the General Statutes, against animals under private ownership, by means including telephone, electronic mail, and Internet Web site. The Attorney General shall periodically publicize the hotline telephone number, electronic mail address, Internet Web site address, and any other means by which the Attorney General may receive reports of allegations of animal cruelty or violations of the Animal Welfare Act. Any individual who makes a report under this section shall disclose his or her name and telephone number and any other information the Attorney General may require.
(b) When the Attorney General receives allegations involving activity that the Attorney General determines may involve cruelty to animals under private ownership in violation of Article 47 of Chapter 14 of the General Statutes, the allegations shall be referred to the appropriate local animal control authority for the unit or units of local government within which the violations are alleged to have occurred. When the Attorney General receives allegations involving activity that the Attorney General determines may involve violations of the Animal Welfare Act, the allegations shall be referred to the Department of Agriculture and Consumer Services. The Attorney General shall record the total number of reports received on the hotline and the number of reports received against any individual on the hotline."
SECTION 4.36.(b) G.S. 7A‑304(a) is amended by adding a new subdivision to read:
"§ 7A‑304. Costs in criminal actions.
(a) In every criminal case in the superior or district court, wherein the defendant is convicted, or enters a plea of guilty or nolo contendere, or when costs are assessed against the prosecuting witness, the following costs shall be assessed and collected. No costs may be assessed when a case is dismissed. Only upon entry of a written order, supported by findings of fact and conclusions of law, determining that there is just cause, the court may (i) waive costs assessed under this section or (ii) waive or reduce costs assessed under subdivision (7), (8), (8a), (11), (12), or (13) of this section.
…
(14) For support of law enforcement in the investigation of violations of Article 47 of Chapter 14 of the General Statutes and Animal Welfare Act violations, the district or superior court judge shall, upon conviction of the defendant, order payment of the sum of two hundred fifty dollars ($250.00) to be remitted to the general fund of the local governmental unit that investigated the crime to be used for local animal control authorities."
SECTION 4.36.(c) Section 4.36(b) of this act becomes effective January 1, 2016, and applies to fees assessed or collected on or after that date. The remainder of this section is effective when this act becomes law.
AMEND STORMWATER MANAGEMENT LAW
SECTION 4.37.(a) Section 3 of S.L. 2013‑82 reads as rewritten:
"SECTION 3. The Environmental Management
Commission shall adopt rules implementing Section 2 of this act no later than July
1, 2016.November 1, 2016."
SECTION 4.37.(b) G.S. 143‑214.7 reads as rewritten:
"§ 143‑214.7. Stormwater runoff rules and programs.
…
(b2) For purposes of implementing stormwater
programs, State stormwater programs and local stormwater programs
approved pursuant to subsection (d) of this section, all of the following shall
apply:
(1) "built‑upon area""Built‑upon
area" means impervious surface and partially impervious surface to the
extent that the partially impervious surface does not allow water to infiltrate
through the surface and into the subsoil. "Built‑upon area"
does not include a slatted deck or the water area of a swimming pool.
(2) Vegetative buffers adjacent to intermittent streams shall be measured from the center of the streambed.
(3) The volume, velocity, and discharge rates of water associated with the one‑year, 24‑hour storm and the difference in stormwater runoff from the predevelopment and postdevelopment conditions for the one‑year, 24‑hour storm shall be calculated using any acceptable engineering hydrologic and hydraulic methods.
(4) Development may occur within a vegetative buffer if the development complies with all applicable State and federal stormwater management requirements and State requirements for protection of watersheds, control and prevention of sedimentation and erosion, and reduction and control of the pollutant loading that caused impaired water designations to be established by the Commission.
(5) The requirements that apply to development activities within one‑half mile of and draining to Class SA waters or within one‑half mile of Class SA waters and draining to unnamed freshwater tributaries shall not apply to development activities and associated stormwater discharges that do not occur within one‑half mile of and draining to Class SA waters or are not within one‑half mile of Class SA waters and draining to unnamed freshwater tributaries.
…
(d) The Commission shall review each stormwater
management program submitted by a State agency or unit of local government and
shall notify the State agency or unit of local government that submitted the
program that the program has been approved, approved with modifications, or
disapproved. The Commission shall approve a program only if it finds that the
standards of the program equal or exceed those of the model program
adopted by the Commission pursuant to this section.section and any
other model program or regulatory requirement that the Commission applies to
local governments for protection of water supply watersheds, control of erosion
and sedimentation, and permits and programs to address impairments of water
quality standards and uses.
…."
SECTION 4.37.(c) No later than January 1, 2016, a State agency or local government that implements a stormwater management program approved pursuant to subsection (d) of G.S. 143‑214.7 shall submit its current stormwater management program or a revised stormwater management program to the Environmental Management Commission. No later than July 1, 2016, the Environmental Management Commission shall review and act on each of the submitted stormwater management programs in accordance with subsection (d) of G.S. 143‑214.7, as amended by this section.
SECTION 4.37.(d) The Environmental Review Commission, with the assistance of the Department of Environment and Natural Resources, shall review the current status of State statutes, session laws, rules, and guidance documents related to the management of stormwater in the State. The Commission shall specifically examine whether State statutes, session laws, rules, and guidance documents related to the management of stormwater in the State should be recodified or reorganized in order to clarify State law for the management of stormwater. The Commission shall submit legislative recommendations, if any, to the 2016 Regular Session of the 2015 General Assembly.
STUDY FLOOD ELEVATIONS AND BUILDING HEIGHT REQUIREMENTS
SECTION 4.38. The Department of Insurance, the Department of Public Safety, and the Building Code Council shall jointly study how flood elevations and building heights for structures are established and measured in the coastal region of the State. The Departments and the Council shall specifically consider how flood elevations and coastal building height requirements affect flood insurance rates and how height calculation methods might be made more consistent and uniform in order to provide flood insurance rate relief. In conducting this study, the Departments and the Council shall engage a broad group of stakeholders, including property owners, local governments, representatives of the surveying industry, and representatives of the development industry. No later than January 1, 2016, the Departments and the Council shall jointly submit the results of their study, including any legislative recommendations, to the 2015 General Assembly.
PART V. SEVERABILITY CLAUSE AND EFFECTIVE DATE
SECTION 5.1. If any section or provision of this act is declared unconstitutional or invalid by the courts, it does not affect the validity of this act as a whole or any part other than the part declared to be unconstitutional or invalid.
SECTION 5.2. Except as otherwise provided, this act is effective when it becomes law.