| 
 |  | 99TH GENERAL ASSEMBLY
State of Illinois
2015 and 2016
HB3341   Introduced , by Rep. Michael W. Tryon  SYNOPSIS AS INTRODUCED:
 |  
 |   415 ILCS 5/39.5 |  from Ch. 111 1/2, par. 1039.5 |   
  |  
 Amends the Environmental Protection Act. Provides that "stationary source" does not include a building, structure, facility, or installation causing emissions resulting directly from internal combustion engines for transportation purposes or from a nonroad engine or a nonroad vehicle as defined in a specified provision of the federal Clean Air Act.
 |  | 
 |   |  | 
 |   |      A BILL FOR |  
    | 
 | 
 |  | HB3341 |  | LRB099 10047 MGM 30270 b |  
  | 
 | 
| 1 |  |  AN ACT concerning safety.
 | 
| 2 |  |  Be it enacted by the People of the State of Illinois,
 | 
| 3 |  | represented in the General Assembly:
 | 
| 4 |  |  Section 5. The Environmental Protection Act is amended by  | 
| 5 |  | changing Section 39.5 as follows:
 | 
| 6 |  |  (415 ILCS 5/39.5) (from Ch. 111 1/2, par. 1039.5)
 | 
| 7 |  |  Sec. 39.5. Clean Air Act Permit Program. 
 | 
| 8 |  |  1. Definitions.
 | 
| 9 |  |  For purposes of this Section:
 | 
| 10 |  |  "Administrative permit amendment" means a permit revision  | 
| 11 |  | subject to
subsection 13 of this Section.
 | 
| 12 |  |  "Affected source for acid deposition" means a source that  | 
| 13 |  | includes one or
more affected units under Title IV of the Clean  | 
| 14 |  | Air Act.
 | 
| 15 |  |  "Affected States" for purposes of formal distribution of a  | 
| 16 |  | draft CAAPP permit
to other States for comments prior to  | 
| 17 |  | issuance, means all States:
 | 
| 18 |  |   (1) Whose air quality may be affected by the source  | 
| 19 |  |  covered by the draft
permit and that are contiguous to  | 
| 20 |  |  Illinois; or
 | 
| 21 |  |   (2) That are within 50 miles of the source.
 | 
| 22 |  |  "Affected unit for acid deposition" shall have the meaning  | 
| 23 |  | given to the term
"affected unit" in the regulations  | 
     | 
 |  | HB3341 | - 2 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | promulgated under Title IV of the Clean Air
Act.
 | 
| 2 |  |  "Applicable Clean Air Act requirement" means all of the  | 
| 3 |  | following as they
apply to emissions units in a source  | 
| 4 |  | (including regulations that have been
promulgated or approved  | 
| 5 |  | by USEPA pursuant to the Clean Air Act which directly
impose  | 
| 6 |  | requirements upon a source and other such federal requirements  | 
| 7 |  | which
have been adopted by the Board. These may include  | 
| 8 |  | requirements and regulations
which have future effective  | 
| 9 |  | compliance dates. Requirements and regulations
will be exempt  | 
| 10 |  | if USEPA determines that such requirements need not be  | 
| 11 |  | contained
in a Title V permit):
 | 
| 12 |  |   (1) Any standard or other requirement provided for in  | 
| 13 |  |  the applicable state
implementation plan approved or  | 
| 14 |  |  promulgated by USEPA under Title I of the Clean
Air Act  | 
| 15 |  |  that implements the relevant requirements of the Clean Air  | 
| 16 |  |  Act,
including any revisions to the state Implementation  | 
| 17 |  |  Plan promulgated in 40 CFR
Part 52, Subparts A and O and  | 
| 18 |  |  other subparts applicable to Illinois. For
purposes of this  | 
| 19 |  |  paragraph (1) of this definition, "any standard or other
 | 
| 20 |  |  requirement" means only such standards or requirements  | 
| 21 |  |  directly
enforceable against an individual source under  | 
| 22 |  |  the Clean Air Act.
 | 
| 23 |  |   (2)(i) Any term or condition of any preconstruction  | 
| 24 |  |  permits issued
pursuant to regulations approved or  | 
| 25 |  |  promulgated by USEPA under Title I of the
Clean Air  | 
| 26 |  |  Act, including Part C or D of the Clean Air Act. 
 | 
     | 
 |  | HB3341 | - 3 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |    (ii) Any term or condition as required pursuant to  | 
| 2 |  |  Section 39.5 of any
federally enforceable State  | 
| 3 |  |  operating permit issued pursuant to regulations
 | 
| 4 |  |  approved or promulgated by USEPA under Title I of the  | 
| 5 |  |  Clean Air Act, including
Part C or D of the Clean Air  | 
| 6 |  |  Act.
 | 
| 7 |  |   (3) Any standard or other requirement under Section 111  | 
| 8 |  |  of the Clean Air
Act, including Section 111(d).
 | 
| 9 |  |   (4) Any standard or other requirement under Section 112  | 
| 10 |  |  of the Clean Air
Act, including any requirement concerning  | 
| 11 |  |  accident prevention under Section
112(r)(7) of the Clean  | 
| 12 |  |  Air Act.
 | 
| 13 |  |   (5) Any standard or other requirement of the acid rain  | 
| 14 |  |  program under Title
IV of the Clean Air Act or the  | 
| 15 |  |  regulations promulgated thereunder.
 | 
| 16 |  |   (6) Any requirements established pursuant to Section  | 
| 17 |  |  504(b) or Section
114(a)(3) of the Clean Air Act.
 | 
| 18 |  |   (7) Any standard or other requirement governing solid  | 
| 19 |  |  waste incineration,
under Section 129 of the Clean Air Act.
 | 
| 20 |  |   (8) Any standard or other requirement for consumer and  | 
| 21 |  |  commercial
products, under Section 183(e) of the Clean Air  | 
| 22 |  |  Act.
 | 
| 23 |  |   (9) Any standard or other requirement for tank vessels,  | 
| 24 |  |  under Section
183(f) of the Clean Air Act.
 | 
| 25 |  |   (10) Any standard or other requirement of the program  | 
| 26 |  |  to control air
pollution from Outer Continental Shelf  | 
     | 
 |  | HB3341 | - 4 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  sources, under Section 328 of the Clean
Air Act.
 | 
| 2 |  |   (11) Any standard or other requirement of the  | 
| 3 |  |  regulations promulgated to
protect stratospheric ozone  | 
| 4 |  |  under Title VI of the Clean Air Act, unless USEPA
has  | 
| 5 |  |  determined that such requirements need not be contained in  | 
| 6 |  |  a Title V
permit.
 | 
| 7 |  |   (12) Any national ambient air quality standard or  | 
| 8 |  |  increment or visibility
requirement under Part C of Title I  | 
| 9 |  |  of the Clean Air Act, but only as it would
apply to  | 
| 10 |  |  temporary sources permitted pursuant to Section 504(e) of  | 
| 11 |  |  the Clean
Air Act.
 | 
| 12 |  |  "Applicable requirement" means all applicable Clean Air  | 
| 13 |  | Act requirements and
any other standard, limitation, or other  | 
| 14 |  | requirement contained in this Act or
regulations promulgated  | 
| 15 |  | under this Act as applicable to sources of air
contaminants  | 
| 16 |  | (including requirements that have future effective compliance
 | 
| 17 |  | dates).
 | 
| 18 |  |  "CAAPP" means the Clean Air Act Permit Program, developed  | 
| 19 |  | pursuant to Title V
of the Clean Air Act.
 | 
| 20 |  |  "CAAPP application" means an application for a CAAPP  | 
| 21 |  | permit.
 | 
| 22 |  |  "CAAPP Permit" or "permit" (unless the context suggests  | 
| 23 |  | otherwise) means any
permit issued, renewed, amended, modified  | 
| 24 |  | or revised pursuant to Title V of the
Clean Air Act.
 | 
| 25 |  |  "CAAPP source" means any source for which the owner or  | 
| 26 |  | operator is required
to obtain a CAAPP permit pursuant to  | 
     | 
 |  | HB3341 | - 5 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | subsection 2 of this Section.
 | 
| 2 |  |  "Clean Air Act" means the Clean Air Act, as now and  | 
| 3 |  | hereafter amended, 42
U.S.C. 7401, et seq.
 | 
| 4 |  |  "Designated representative" has the meaning given to it in  | 
| 5 |  | Section
402(26) of the Clean Air Act and the regulations  | 
| 6 |  | promulgated thereunder, which state
that the term "designated  | 
| 7 |  | representative" means a responsible
person or official  | 
| 8 |  | authorized by the owner or operator of a unit to represent
the  | 
| 9 |  | owner or operator in all matters pertaining to the holding,  | 
| 10 |  | transfer, or
disposition of allowances allocated to a unit, and  | 
| 11 |  | the submission of and
compliance with permits, permit  | 
| 12 |  | applications, and compliance plans for the
unit.
 | 
| 13 |  |  "Draft CAAPP permit" means the version of a CAAPP permit  | 
| 14 |  | for which public
notice and an opportunity for public comment  | 
| 15 |  | and hearing is offered by the
Agency.
 | 
| 16 |  |  "Effective date of the CAAPP" means the date that USEPA  | 
| 17 |  | approves Illinois'
CAAPP.
 | 
| 18 |  |  "Emission unit" means any part or activity of a stationary  | 
| 19 |  | source that emits
or has the potential to emit any air  | 
| 20 |  | pollutant. This term is not meant to
alter or affect the  | 
| 21 |  | definition of the term "unit" for purposes of Title IV of
the  | 
| 22 |  | Clean Air Act.
 | 
| 23 |  |  "Federally enforceable" means enforceable by USEPA.
 | 
| 24 |  |  "Final permit action" means the Agency's granting with  | 
| 25 |  | conditions, refusal to
grant, renewal of, or revision of a  | 
| 26 |  | CAAPP permit, the Agency's determination of
incompleteness of a  | 
     | 
 |  | HB3341 | - 6 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | submitted CAAPP application, or the Agency's failure to act
on  | 
| 2 |  | an application for a permit, permit renewal, or permit revision  | 
| 3 |  | within the
time specified in subsection 13, subsection 14, or  | 
| 4 |  | paragraph (j) of subsection 5 of this
Section.
 | 
| 5 |  |  "General permit" means a permit issued to cover numerous  | 
| 6 |  | similar sources in
accordance with subsection 11 of this  | 
| 7 |  | Section. 
 | 
| 8 |  |  "Major source" means a source for which emissions of one or  | 
| 9 |  | more air
pollutants meet the criteria for major status pursuant  | 
| 10 |  | to paragraph(c) of subsection 2 of
this Section.
 | 
| 11 |  |  "Maximum achievable control technology" or "MACT" means  | 
| 12 |  | the maximum degree of
reductions in emissions deemed achievable  | 
| 13 |  | under Section 112 of the Clean
Air Act.
 | 
| 14 |  |  "Owner or operator" means any person who owns, leases,  | 
| 15 |  | operates, controls, or
supervises a stationary source.
 | 
| 16 |  |  "Permit modification" means a revision to a CAAPP permit  | 
| 17 |  | that cannot be
accomplished under the provisions for  | 
| 18 |  | administrative permit amendments under
subsection 13 of this
 | 
| 19 |  | Section.
 | 
| 20 |  |  "Permit revision" means a permit modification or  | 
| 21 |  | administrative permit
amendment.
 | 
| 22 |  |  "Phase II" means the period of the national acid rain  | 
| 23 |  | program,
established under Title IV of the Clean Air Act,  | 
| 24 |  | beginning January 1,
2000, and continuing thereafter.
 | 
| 25 |  |  "Phase II acid rain permit" means the portion of a CAAPP  | 
| 26 |  | permit issued,
renewed, modified, or revised by the Agency  | 
     | 
 |  | HB3341 | - 7 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | during Phase II for an affected
source for acid deposition.
 | 
| 2 |  |  "Potential to emit" means the maximum capacity of a  | 
| 3 |  | stationary source to emit
any air pollutant under its physical  | 
| 4 |  | and operational design. Any physical or
operational limitation  | 
| 5 |  | on the capacity of a source to emit an air pollutant,
including  | 
| 6 |  | air pollution control equipment and restrictions on hours of
 | 
| 7 |  | operation or on the type or amount of material combusted,  | 
| 8 |  | stored, or processed,
shall be treated as part of its design if  | 
| 9 |  | the limitation is enforceable by
USEPA. This definition does  | 
| 10 |  | not alter or affect the use of this term for any
other purposes  | 
| 11 |  | under the Clean Air Act, or the term "capacity factor" as used
 | 
| 12 |  | in Title IV of the Clean Air Act or the regulations promulgated  | 
| 13 |  | thereunder.
 | 
| 14 |  |  "Preconstruction Permit" or "Construction Permit" means a  | 
| 15 |  | permit which is to
be obtained prior to commencing or beginning  | 
| 16 |  | actual construction or
modification of a source or emissions  | 
| 17 |  | unit.
 | 
| 18 |  |  "Proposed CAAPP permit" means the version of a CAAPP permit  | 
| 19 |  | that the Agency
proposes to issue and forwards to USEPA for  | 
| 20 |  | review in compliance with
applicable requirements of the Act  | 
| 21 |  | and regulations promulgated thereunder.
 | 
| 22 |  |  "Regulated air pollutant" means the following:
 | 
| 23 |  |   (1) Nitrogen oxides (NOx) or any volatile organic  | 
| 24 |  |  compound.
 | 
| 25 |  |   (2) Any pollutant for which a national ambient air  | 
| 26 |  |  quality standard has
been promulgated.
 | 
     | 
 |  | HB3341 | - 8 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   (3) Any pollutant that is subject to any standard  | 
| 2 |  |  promulgated under
Section 111 of the Clean Air Act.
 | 
| 3 |  |   (4) Any Class I or II substance subject to a standard  | 
| 4 |  |  promulgated
under or established by Title VI of the Clean  | 
| 5 |  |  Air Act.
 | 
| 6 |  |   (5) Any pollutant subject to a standard promulgated  | 
| 7 |  |  under Section 112 or
other requirements established under  | 
| 8 |  |  Section 112 of the Clean Air Act,
including Sections  | 
| 9 |  |  112(g), (j) and (r).
 | 
| 10 |  |    (i) Any pollutant subject to requirements under  | 
| 11 |  |  Section 112(j) of the
Clean Air Act. Any pollutant  | 
| 12 |  |  listed under Section 112(b) for which the subject
 | 
| 13 |  |  source would be major shall be considered to be  | 
| 14 |  |  regulated 18 months after the
date on which USEPA was  | 
| 15 |  |  required to promulgate an applicable standard pursuant
 | 
| 16 |  |  to Section 112(e) of the Clean Air Act, if USEPA fails  | 
| 17 |  |  to promulgate such
standard.
 | 
| 18 |  |    (ii) Any pollutant for which the requirements of  | 
| 19 |  |  Section 112(g)(2) of
the Clean Air Act have been met,  | 
| 20 |  |  but only with respect to the individual source
subject  | 
| 21 |  |  to Section 112(g)(2) requirement.
 | 
| 22 |  |   (6) Greenhouse gases.  | 
| 23 |  |  "Renewal" means the process by which a permit is reissued  | 
| 24 |  | at the end of its
term.
 | 
| 25 |  |  "Responsible official" means one of the following:
 | 
| 26 |  |   (1) For a corporation: a president, secretary,  | 
     | 
 |  | HB3341 | - 9 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  treasurer, or
vice-president of the corporation in charge  | 
| 2 |  |  of a principal business function,
or any other person who  | 
| 3 |  |  performs similar policy or decision-making functions
for  | 
| 4 |  |  the corporation, or a duly authorized representative of  | 
| 5 |  |  such person if the
representative is responsible for the  | 
| 6 |  |  overall operation of one or more
manufacturing,  | 
| 7 |  |  production, or operating facilities applying for or  | 
| 8 |  |  subject to a
permit and either (i) the facilities employ  | 
| 9 |  |  more than 250 persons or have gross
annual sales or  | 
| 10 |  |  expenditures exceeding $25 million (in second quarter 1980
 | 
| 11 |  |  dollars), or (ii) the delegation of authority to such  | 
| 12 |  |  representative is
approved in advance by the Agency.
 | 
| 13 |  |   (2) For a partnership or sole proprietorship: a general  | 
| 14 |  |  partner or the
proprietor, respectively, or in the case of  | 
| 15 |  |  a partnership in which all of the
partners are  | 
| 16 |  |  corporations, a duly authorized representative of the  | 
| 17 |  |  partnership
if the representative is responsible for the  | 
| 18 |  |  overall operation of one or more
manufacturing,  | 
| 19 |  |  production, or operating facilities applying for or  | 
| 20 |  |  subject to a
permit and either (i) the facilities employ  | 
| 21 |  |  more than 250 persons or have gross
annual sales or  | 
| 22 |  |  expenditures exceeding $25 million (in second quarter 1980
 | 
| 23 |  |  dollars), or (ii) the delegation of authority to such  | 
| 24 |  |  representative is
approved in advance by the Agency.
 | 
| 25 |  |   (3) For a municipality, State, Federal, or other public  | 
| 26 |  |  agency: either a
principal executive officer or ranking  | 
     | 
 |  | HB3341 | - 10 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  elected official. For the purposes of
this part, a  | 
| 2 |  |  principal executive officer of a Federal agency includes  | 
| 3 |  |  the chief
executive officer having responsibility for the  | 
| 4 |  |  overall operations of a
principal geographic unit of the  | 
| 5 |  |  agency (e.g., a
Regional Administrator of USEPA). 
 | 
| 6 |  |   (4) For affected sources for acid deposition:
 | 
| 7 |  |    (i) The designated representative shall be the  | 
| 8 |  |  "responsible official" in
so far as actions,  | 
| 9 |  |  standards, requirements, or prohibitions under Title  | 
| 10 |  |  IV of
the Clean Air Act or the regulations promulgated  | 
| 11 |  |  thereunder are concerned.
 | 
| 12 |  |    (ii) The designated representative may also be the  | 
| 13 |  |  "responsible
official" for any other purposes with  | 
| 14 |  |  respect to air pollution control.
 | 
| 15 |  |  "Section 502(b)(10) changes" means changes that contravene  | 
| 16 |  | express permit
terms. "Section 502(b)(10) changes" do not  | 
| 17 |  | include changes that would violate
applicable
requirements or  | 
| 18 |  | contravene federally enforceable permit terms or conditions
 | 
| 19 |  | that are monitoring (including test methods), recordkeeping,  | 
| 20 |  | reporting, or
compliance certification requirements.
 | 
| 21 |  |  "Solid waste incineration unit" means a distinct operating  | 
| 22 |  | unit of any
facility which combusts any solid waste material  | 
| 23 |  | from commercial or industrial
establishments or the general  | 
| 24 |  | public (including single and multiple residences,
hotels, and  | 
| 25 |  | motels). The term does not include incinerators or other units
 | 
| 26 |  | required to have a permit under Section 3005 of the Solid Waste  | 
     | 
 |  | HB3341 | - 11 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | Disposal Act.
The term also does not include (A) materials  | 
| 2 |  | recovery facilities (including
primary or secondary smelters)  | 
| 3 |  | which combust waste for the primary purpose of
recovering  | 
| 4 |  | metals, (B) qualifying small power production facilities, as  | 
| 5 |  | defined
in Section 3(17)(C) of the Federal Power Act (16 U.S.C.  | 
| 6 |  | 769(17)(C)), or
qualifying cogeneration facilities, as defined  | 
| 7 |  | in Section 3(18)(B) of the
Federal Power Act (16 U.S.C.  | 
| 8 |  | 796(18)(B)), which burn homogeneous waste (such as
units which  | 
| 9 |  | burn tires or used oil, but not including refuse-derived fuel)  | 
| 10 |  | for
the production of electric energy or in the case of  | 
| 11 |  | qualifying cogeneration
facilities which burn homogeneous  | 
| 12 |  | waste for the production of electric energy
and steam or forms  | 
| 13 |  | of useful energy (such as heat) which are used for
industrial,  | 
| 14 |  | commercial, heating or cooling purposes, or (C) air curtain
 | 
| 15 |  | incinerators provided that such incinerators only burn wood  | 
| 16 |  | wastes, yard waste
and clean lumber and that such air curtain  | 
| 17 |  | incinerators comply with opacity
limitations to be established  | 
| 18 |  | by the USEPA by rule.
 | 
| 19 |  |  "Source" means any stationary source (or any group of  | 
| 20 |  | stationary sources)
that
is located on one or more contiguous  | 
| 21 |  | or adjacent properties
that are under
common control of the  | 
| 22 |  | same person (or persons under common control) and
that
belongs  | 
| 23 |  | to
a single major industrial grouping. For the purposes of  | 
| 24 |  | defining "source," a
stationary source or group of stationary  | 
| 25 |  | sources shall be considered part of a
single major industrial  | 
| 26 |  | grouping if all of the pollutant emitting
activities at such
 | 
     | 
 |  | HB3341 | - 12 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | source or group of sources located on contiguous or adjacent  | 
| 2 |  | properties
and under common control belong to the
same Major  | 
| 3 |  | Group (i.e., all have the same two-digit code) as described in  | 
| 4 |  | the
Standard Industrial Classification Manual, 1987, or such  | 
| 5 |  | pollutant emitting
activities at a stationary source (or group  | 
| 6 |  | of stationary sources) located on
contiguous or adjacent  | 
| 7 |  | properties and under common control constitute a
support
 | 
| 8 |  | facility. The determination as to whether any group of  | 
| 9 |  | stationary sources is
located on contiguous or adjacent  | 
| 10 |  | properties, and/or is under common control,
and/or
whether the  | 
| 11 |  | pollutant emitting activities at such group of stationary  | 
| 12 |  | sources
constitute a support facility shall be made on a case  | 
| 13 |  | by case basis.
 | 
| 14 |  |  "Stationary source" means any building, structure,  | 
| 15 |  | facility, or installation
that emits or may emit any regulated  | 
| 16 |  | air pollutant or any pollutant listed
under Section 112(b) of  | 
| 17 |  | the Clean Air Act. "Stationary source" does not include a  | 
| 18 |  | building, structure, facility, or installation causing  | 
| 19 |  | emissions resulting directly from internal combustion engines  | 
| 20 |  | for transportation purposes or from a nonroad engine or a  | 
| 21 |  | nonroad vehicle as defined in Section 216 of the Clean Air Act. 
 | 
| 22 |  |  "Subject to regulation" has the meaning given to it in 40  | 
| 23 |  | CFR 70.2, as now or hereafter amended.  | 
| 24 |  |  "Support facility" means any stationary source (or group of  | 
| 25 |  | stationary
sources) that conveys, stores, or otherwise assists  | 
| 26 |  | to a significant extent in
the production of a principal  | 
     | 
 |  | HB3341 | - 13 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  | product at another stationary source (or group of
stationary  | 
| 2 |  | sources). A support facility shall be considered to be part of  | 
| 3 |  | the
same source as the stationary source (or group of  | 
| 4 |  | stationary sources) that it
supports regardless of the 2-digit  | 
| 5 |  | Standard Industrial Classification code for
the support  | 
| 6 |  | facility.
 | 
| 7 |  |  "USEPA" means the Administrator of the United States  | 
| 8 |  | Environmental Protection
Agency (USEPA) or a person designated  | 
| 9 |  | by the Administrator.
 | 
| 10 |  |  1.1. Exclusion From the CAAPP.
 | 
| 11 |  |   a. An owner or operator of a source which determines  | 
| 12 |  |  that the source could
be excluded from the CAAPP may seek  | 
| 13 |  |  such exclusion prior to the date that the
CAAPP application  | 
| 14 |  |  for the source is due but in no case later than 9 months
 | 
| 15 |  |  after the effective date of the CAAPP through the  | 
| 16 |  |  imposition of federally
enforceable conditions limiting  | 
| 17 |  |  the "potential to emit" of the source to a
level below the  | 
| 18 |  |  major source threshold for that source as described in
 | 
| 19 |  |  paragraph(c) of subsection 2 of this Section, within a  | 
| 20 |  |  State operating permit issued pursuant
to subsection (a) of  | 
| 21 |  |  Section 39 of this Act. After such date, an exclusion from  | 
| 22 |  |  the CAAPP may
be sought under paragraph(c) of subsection 3  | 
| 23 |  |  of this Section.
 | 
| 24 |  |   b. An owner or operator of a source seeking exclusion  | 
| 25 |  |  from the CAAPP
pursuant to paragraph (a) of this subsection  | 
     | 
 |  | HB3341 | - 14 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  must submit a permit application
consistent with the  | 
| 2 |  |  existing State permit program which specifically requests
 | 
| 3 |  |  such exclusion through the imposition of such federally  | 
| 4 |  |  enforceable conditions.
 | 
| 5 |  |   c. Upon such request, if the Agency determines that the  | 
| 6 |  |  owner or operator
of a source has met the requirements for  | 
| 7 |  |  exclusion pursuant to paragraph (a) of
this subsection and  | 
| 8 |  |  other applicable requirements for permit issuance under  | 
| 9 |  |  subsection (a) of
Section 39 of this Act, the Agency shall  | 
| 10 |  |  issue a State operating permit for
such source under  | 
| 11 |  |  subsection (a) of Section 39 of this Act, as amended, and  | 
| 12 |  |  regulations
promulgated thereunder with federally  | 
| 13 |  |  enforceable conditions limiting the
"potential to emit" of  | 
| 14 |  |  the source to a level below the major source threshold
for  | 
| 15 |  |  that source as described in paragraph(c) of subsection 2 of  | 
| 16 |  |  this Section.
 | 
| 17 |  |   d. The Agency shall provide an owner or operator of a  | 
| 18 |  |  source which may be
excluded from the CAAPP pursuant to  | 
| 19 |  |  this subsection with reasonable notice that
the owner or  | 
| 20 |  |  operator may seek such exclusion.
 | 
| 21 |  |   e. The Agency shall provide such sources with the  | 
| 22 |  |  necessary permit
application forms.
 | 
| 23 |  |  2. Applicability.
 | 
| 24 |  |   a. Sources subject to this Section shall include:
 | 
| 25 |  |    i. Any major source as defined in paragraph (c) of  | 
     | 
 |  | HB3341 | - 15 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  this subsection.
 | 
| 2 |  |    ii. Any source subject to a standard or other  | 
| 3 |  |  requirements promulgated
under Section 111 (New Source  | 
| 4 |  |  Performance Standards) or Section 112 (Hazardous
Air  | 
| 5 |  |  Pollutants) of the Clean Air Act, except that a source  | 
| 6 |  |  is not required to
obtain a permit solely because it is  | 
| 7 |  |  subject to regulations or requirements
under Section  | 
| 8 |  |  112(r) of the Clean Air Act.
 | 
| 9 |  |    iii. Any affected source for acid deposition, as  | 
| 10 |  |  defined in subsection 1
of this Section.
 | 
| 11 |  |    iv. Any other source subject to this Section under  | 
| 12 |  |  the Clean Air Act or
regulations promulgated  | 
| 13 |  |  thereunder, or applicable Board regulations.
 | 
| 14 |  |   b. Sources exempted from this Section shall include:
 | 
| 15 |  |    i. All sources listed in paragraph (a) of this  | 
| 16 |  |  subsection that are not
major sources, affected  | 
| 17 |  |  sources for acid deposition or solid waste  | 
| 18 |  |  incineration
units required to obtain a permit  | 
| 19 |  |  pursuant to Section 129(e) of the Clean Air
Act, until  | 
| 20 |  |  the source is required to obtain a CAAPP permit  | 
| 21 |  |  pursuant to the
Clean Air Act or regulations  | 
| 22 |  |  promulgated thereunder.
 | 
| 23 |  |    ii. Nonmajor sources subject to a standard or other  | 
| 24 |  |  requirements
subsequently promulgated by USEPA under  | 
| 25 |  |  Section 111 or 112 of the Clean Air Act that
are  | 
| 26 |  |  determined by USEPA to be exempt at the time a new  | 
     | 
 |  | HB3341 | - 16 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  standard is
promulgated.
 | 
| 2 |  |    iii. All sources and source categories that would  | 
| 3 |  |  be required to obtain
a permit solely because they are  | 
| 4 |  |  subject to Part 60, Subpart AAA - Standards of
 | 
| 5 |  |  Performance for New Residential Wood Heaters (40 CFR  | 
| 6 |  |  Part 60).
 | 
| 7 |  |    iv. All sources and source categories that would be  | 
| 8 |  |  required to obtain a
permit solely because they are  | 
| 9 |  |  subject to Part 61, Subpart M - National
Emission  | 
| 10 |  |  Standard for Hazardous Air Pollutants for Asbestos,  | 
| 11 |  |  Section 61.145 (40
CFR Part 61).
 | 
| 12 |  |    v. Any other source categories exempted by USEPA  | 
| 13 |  |  regulations pursuant to
Section 502(a) of the Clean Air  | 
| 14 |  |  Act.
 | 
| 15 |  |    vi. Major sources of greenhouse gas emissions  | 
| 16 |  |  required to obtain a CAAPP permit under this Section if  | 
| 17 |  |  any of the following occurs:
 | 
| 18 |  |     (A) enactment of federal legislation depriving  | 
| 19 |  |  the Administrator of the USEPA of authority to  | 
| 20 |  |  regulate greenhouse gases under the Clean Air Act; | 
| 21 |  |     (B) the issuance of any opinion, ruling,  | 
| 22 |  |  judgment, order, or decree by a federal court  | 
| 23 |  |  depriving the Administrator of the USEPA of  | 
| 24 |  |  authority to regulate greenhouse gases under the  | 
| 25 |  |  Clean Air Act; or | 
| 26 |  |     (C) action by the President of the United  | 
     | 
 |  | HB3341 | - 17 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  States or the President's authorized agent,  | 
| 2 |  |  including the Administrator of the USEPA, to  | 
| 3 |  |  repeal or withdraw the Greenhouse Gas Tailoring  | 
| 4 |  |  Rule (75 Fed. Reg. 31514, June 3, 2010).  | 
| 5 |  |    If any event listed in this subparagraph (vi)  | 
| 6 |  |  occurs, CAAPP permits issued after such event shall not  | 
| 7 |  |  impose permit terms or conditions addressing  | 
| 8 |  |  greenhouse gases during the effectiveness of any event  | 
| 9 |  |  listed in subparagraph (vi). If any event listed in  | 
| 10 |  |  this subparagraph (vi) occurs, any owner or operator  | 
| 11 |  |  with a CAAPP permit that includes terms or conditions  | 
| 12 |  |  addressing greenhouse gases may elect to submit an  | 
| 13 |  |  application to the Agency to address a revision or  | 
| 14 |  |  repeal of such terms or conditions. If any owner or  | 
| 15 |  |  operator submits such an application, the Agency shall  | 
| 16 |  |  expeditiously process the permit application in  | 
| 17 |  |  accordance with applicable laws and regulations.  | 
| 18 |  |  Nothing in this subparagraph (vi) shall relieve an  | 
| 19 |  |  owner or operator of a source from the requirement to  | 
| 20 |  |  obtain a CAAPP permit for its emissions of regulated  | 
| 21 |  |  air pollutants other than greenhouse gases, as  | 
| 22 |  |  required by this Section. 
 | 
| 23 |  |   c. For purposes of this Section the term "major source"  | 
| 24 |  |  means any source
that is:
 | 
| 25 |  |    i. A major source under Section 112 of the Clean  | 
| 26 |  |  Air Act, which is
defined as:
 | 
     | 
 |  | HB3341 | - 18 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |     A. For pollutants other than radionuclides,  | 
| 2 |  |  any stationary source
or group of stationary  | 
| 3 |  |  sources located within a contiguous area and under
 | 
| 4 |  |  common control that emits or has the potential to  | 
| 5 |  |  emit, in the aggregate, 10
tons per year (tpy) or  | 
| 6 |  |  more of any hazardous air pollutant which has been
 | 
| 7 |  |  listed pursuant to Section 112(b) of the Clean Air  | 
| 8 |  |  Act, 25 tpy or more of any
combination of such  | 
| 9 |  |  hazardous air pollutants, or such lesser quantity  | 
| 10 |  |  as USEPA
may establish by rule. Notwithstanding  | 
| 11 |  |  the preceding sentence, emissions from
any oil or  | 
| 12 |  |  gas exploration or production well (with its  | 
| 13 |  |  associated equipment)
and emissions from any  | 
| 14 |  |  pipeline compressor or pump station shall not be
 | 
| 15 |  |  aggregated with emissions from other similar  | 
| 16 |  |  units, whether or not such units
are in a  | 
| 17 |  |  contiguous area or under common control, to  | 
| 18 |  |  determine whether such
stations are major sources.
 | 
| 19 |  |     B. For radionuclides, "major source" shall  | 
| 20 |  |  have the meaning specified
by the USEPA by rule.
 | 
| 21 |  |    ii. A major stationary source of air pollutants, as  | 
| 22 |  |  defined in Section
302 of the Clean Air Act, that  | 
| 23 |  |  directly emits or has the potential to emit, 100
tpy or  | 
| 24 |  |  more of any air pollutant subject to regulation  | 
| 25 |  |  (including any major source of fugitive
emissions of  | 
| 26 |  |  any such pollutant, as determined by rule by USEPA).  | 
     | 
 |  | HB3341 | - 19 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  For purposes
of this subsection, "fugitive emissions"  | 
| 2 |  |  means those emissions which could not
reasonably pass  | 
| 3 |  |  through a stack, chimney, vent, or other
 | 
| 4 |  |  functionally-equivalent opening. The fugitive  | 
| 5 |  |  emissions of a stationary source
shall not be  | 
| 6 |  |  considered in determining whether it is a major  | 
| 7 |  |  stationary source
for the purposes of Section 302(j) of  | 
| 8 |  |  the Clean Air Act, unless the source
belongs to one of  | 
| 9 |  |  the following categories of stationary source:
 | 
| 10 |  |     A. Coal cleaning plants (with thermal dryers).
 | 
| 11 |  |     B. Kraft pulp mills.
 | 
| 12 |  |     C. Portland cement plants.
 | 
| 13 |  |     D. Primary zinc smelters.
 | 
| 14 |  |     E. Iron and steel mills.
 | 
| 15 |  |     F. Primary aluminum ore reduction plants.
 | 
| 16 |  |     G. Primary copper smelters.
 | 
| 17 |  |     H. Municipal incinerators capable of charging  | 
| 18 |  |  more than 250 tons of
refuse per day.
 | 
| 19 |  |     I. Hydrofluoric, sulfuric, or nitric acid  | 
| 20 |  |  plants.
 | 
| 21 |  |     J. Petroleum refineries.
 | 
| 22 |  |     K. Lime plants.
 | 
| 23 |  |     L. Phosphate rock processing plants.
 | 
| 24 |  |     M. Coke oven batteries.
 | 
| 25 |  |     N. Sulfur recovery plants.
 | 
| 26 |  |     O. Carbon black plants (furnace
process).
 | 
     | 
 |  | HB3341 | - 20 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |     P. Primary lead smelters.
 | 
| 2 |  |     Q. Fuel conversion plants.
 | 
| 3 |  |     R. Sintering plants.
 | 
| 4 |  |     S. Secondary metal production plants.
 | 
| 5 |  |     T. Chemical process plants.
 | 
| 6 |  |     U. Fossil-fuel boilers (or combination  | 
| 7 |  |  thereof) totaling more than 250
million British  | 
| 8 |  |  thermal units per hour heat input.
 | 
| 9 |  |     V. Petroleum storage and transfer units with a  | 
| 10 |  |  total storage capacity
exceeding 300,000 barrels.
 | 
| 11 |  |     W. Taconite ore processing plants.
 | 
| 12 |  |     X. Glass fiber processing plants.
 | 
| 13 |  |     Y. Charcoal production plants.
 | 
| 14 |  |     Z. Fossil fuel-fired steam electric plants of  | 
| 15 |  |  more than 250 million
British thermal units per  | 
| 16 |  |  hour heat input.
 | 
| 17 |  |     AA. All other stationary source categories,  | 
| 18 |  |  which as of August 7, 1980 are being regulated by a  | 
| 19 |  |  standard
promulgated under Section 111 or 112 of  | 
| 20 |  |  the Clean Air Act.
 | 
| 21 |  |     BB. Any other stationary source category  | 
| 22 |  |  designated by USEPA by rule.
 | 
| 23 |  |    iii. A major stationary source as defined in part D  | 
| 24 |  |  of Title I of the
Clean Air Act including:
 | 
| 25 |  |     A. For ozone nonattainment areas, sources with  | 
| 26 |  |  the potential to emit
100 tons or more per year of  | 
     | 
 |  | HB3341 | - 21 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  volatile organic compounds or oxides of nitrogen
 | 
| 2 |  |  in areas classified as "marginal" or "moderate",  | 
| 3 |  |  50 tons or more per year in
areas classified as  | 
| 4 |  |  "serious", 25 tons or more per year in areas  | 
| 5 |  |  classified as
"severe", and 10 tons or more per  | 
| 6 |  |  year in areas classified as "extreme"; except
that  | 
| 7 |  |  the references in this clause to 100, 50, 25, and  | 
| 8 |  |  10 tons per year of
nitrogen oxides shall not apply  | 
| 9 |  |  with respect to any source for which USEPA has
made  | 
| 10 |  |  a finding, under Section 182(f)(1) or (2) of the  | 
| 11 |  |  Clean Air Act, that
requirements otherwise  | 
| 12 |  |  applicable to such source under Section 182(f) of  | 
| 13 |  |  the
Clean Air Act do not apply. Such sources shall  | 
| 14 |  |  remain subject to the major
source criteria of  | 
| 15 |  |  subparagraph (ii) of paragraph(c) of this  | 
| 16 |  |  subsection.
 | 
| 17 |  |     B. For ozone transport regions established  | 
| 18 |  |  pursuant to Section 184 of
the Clean Air Act,  | 
| 19 |  |  sources with the potential to emit 50 tons or more  | 
| 20 |  |  per year
of volatile organic compounds (VOCs).
 | 
| 21 |  |     C. For carbon monoxide nonattainment areas (1)  | 
| 22 |  |  that are classified as
"serious", and (2) in which  | 
| 23 |  |  stationary sources contribute significantly to
 | 
| 24 |  |  carbon monoxide levels as determined under rules  | 
| 25 |  |  issued by USEPA, sources with
the potential to emit  | 
| 26 |  |  50 tons or more per year of carbon monoxide.
 | 
     | 
 |  | HB3341 | - 22 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |     D. For particulate matter (PM-10)  | 
| 2 |  |  nonattainment areas classified as
"serious",  | 
| 3 |  |  sources with the potential to emit 70 tons or more  | 
| 4 |  |  per year of
PM-10.
 | 
| 5 |  |  3. Agency Authority To Issue CAAPP Permits and Federally  | 
| 6 |  | Enforceable State
Operating Permits.
 | 
| 7 |  |   a. The Agency shall issue CAAPP permits under this  | 
| 8 |  |  Section consistent with
the Clean Air Act and regulations  | 
| 9 |  |  promulgated thereunder and this Act and
regulations  | 
| 10 |  |  promulgated thereunder.
 | 
| 11 |  |   b. The Agency shall issue CAAPP permits for fixed terms  | 
| 12 |  |  of 5 years, except
CAAPP permits issued for solid waste  | 
| 13 |  |  incineration units combusting municipal
waste which shall  | 
| 14 |  |  be issued for fixed terms of 12 years and except CAAPP
 | 
| 15 |  |  permits for affected sources for acid deposition which  | 
| 16 |  |  shall be issued for
initial terms to expire on December 31,  | 
| 17 |  |  1999, and for fixed terms of 5 years
thereafter.
 | 
| 18 |  |   c. The Agency shall have the authority to issue a State  | 
| 19 |  |  operating permit
for a source under subsection (a) of  | 
| 20 |  |  Section 39 of this Act, as amended, and regulations
 | 
| 21 |  |  promulgated thereunder, which includes federally  | 
| 22 |  |  enforceable conditions
limiting the "potential to emit" of  | 
| 23 |  |  the source to a level below the major
source threshold for  | 
| 24 |  |  that source as described in paragraph(c) of subsection 2 of  | 
| 25 |  |  this
Section, thereby excluding the source from the CAAPP,  | 
     | 
 |  | HB3341 | - 23 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  when requested by the
applicant pursuant to paragraph(u) of  | 
| 2 |  |  subsection 5 of this Section. The public notice
 | 
| 3 |  |  requirements of this Section applicable to CAAPP permits  | 
| 4 |  |  shall also apply to
the initial issuance of permits under  | 
| 5 |  |  this paragraph.
 | 
| 6 |  |   d. For purposes of this Act, a permit issued by USEPA  | 
| 7 |  |  under Section 505 of
the Clean Air Act, as now and  | 
| 8 |  |  hereafter amended, shall be deemed to be a
permit issued by  | 
| 9 |  |  the Agency pursuant to Section 39.5 of this Act.
 | 
| 10 |  |  4. Transition.
 | 
| 11 |  |   a. An owner or operator of a CAAPP source shall not be  | 
| 12 |  |  required to renew
an existing State operating permit for  | 
| 13 |  |  any emission unit at such CAAPP source
once a CAAPP  | 
| 14 |  |  application timely submitted prior to expiration of the  | 
| 15 |  |  State
operating permit has been deemed complete. For  | 
| 16 |  |  purposes other than permit
renewal, the obligation upon the  | 
| 17 |  |  owner or operator of a CAAPP source to obtain
a State  | 
| 18 |  |  operating permit is not removed upon submittal of the  | 
| 19 |  |  complete CAAPP
permit application. An owner or operator of  | 
| 20 |  |  a CAAPP source seeking to make a
modification to a source  | 
| 21 |  |  prior to the issuance of its CAAPP permit shall be
required  | 
| 22 |  |  to obtain a construction permit, operating permit, or both  | 
| 23 |  |  as required for such
modification in accordance with the  | 
| 24 |  |  State permit program under subsection (a) of Section 39 of
 | 
| 25 |  |  this Act, as amended, and regulations promulgated  | 
     | 
 |  | HB3341 | - 24 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  thereunder. The application
for such construction permit,  | 
| 2 |  |  operating permit, or both shall be considered an amendment
 | 
| 3 |  |  to the CAAPP application submitted for such source.
 | 
| 4 |  |   b. An owner or operator of a CAAPP source shall  | 
| 5 |  |  continue to operate in
accordance with the terms and  | 
| 6 |  |  conditions of its applicable State operating
permit  | 
| 7 |  |  notwithstanding the expiration of the State operating  | 
| 8 |  |  permit until the
source's CAAPP permit has been issued.
 | 
| 9 |  |   c. An owner or operator of a CAAPP source shall submit  | 
| 10 |  |  its initial CAAPP
application to the Agency no later than  | 
| 11 |  |  12 months after the effective date of
the CAAPP. The Agency  | 
| 12 |  |  may request submittal of initial CAAPP applications
during  | 
| 13 |  |  this 12-month period according to a schedule set forth  | 
| 14 |  |  within Agency
procedures, however, in no event shall the  | 
| 15 |  |  Agency require such submittal
earlier than 3 months after  | 
| 16 |  |  such effective date of the CAAPP. An owner or
operator may  | 
| 17 |  |  voluntarily submit its initial CAAPP application prior to  | 
| 18 |  |  the date
required within this paragraph or applicable  | 
| 19 |  |  procedures, if any, subsequent to
the date the Agency  | 
| 20 |  |  submits the CAAPP to USEPA for approval.
 | 
| 21 |  |   d. The Agency shall act on initial CAAPP applications  | 
| 22 |  |  in accordance with paragraph (j) of
subsection 5 of this  | 
| 23 |  |  Section.
 | 
| 24 |  |   e. For purposes of this Section, the term "initial  | 
| 25 |  |  CAAPP application"
shall mean the first CAAPP application  | 
| 26 |  |  submitted for a source existing as of
the effective date of  | 
     | 
 |  | HB3341 | - 25 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  the CAAPP.
 | 
| 2 |  |   f. The Agency shall provide owners or operators of  | 
| 3 |  |  CAAPP sources with at
least 3 months advance notice of the  | 
| 4 |  |  date on which their applications are
required to be  | 
| 5 |  |  submitted. In determining which sources shall be subject to
 | 
| 6 |  |  early submittal, the Agency shall include among its  | 
| 7 |  |  considerations the
complexity of the permit application,  | 
| 8 |  |  and the burden that such early submittal
will have on the  | 
| 9 |  |  source.
 | 
| 10 |  |   g. The CAAPP permit shall upon becoming effective  | 
| 11 |  |  supersede the State
operating permit.
 | 
| 12 |  |   h. The Agency shall have the authority to adopt  | 
| 13 |  |  procedural rules, in
accordance with the Illinois  | 
| 14 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 15 |  |  necessary, to implement this subsection. 
 | 
| 16 |  |  5. Applications and Completeness.
 | 
| 17 |  |   a. An owner or operator of a CAAPP source shall submit  | 
| 18 |  |  its complete CAAPP
application consistent with the Act and  | 
| 19 |  |  applicable regulations.
 | 
| 20 |  |   b. An owner or operator of a CAAPP source shall submit  | 
| 21 |  |  a single complete
CAAPP application covering all emission  | 
| 22 |  |  units at that source.
 | 
| 23 |  |   c. To be deemed complete, a CAAPP application must  | 
| 24 |  |  provide all
information, as requested in Agency  | 
| 25 |  |  application forms, sufficient to evaluate
the subject  | 
     | 
 |  | HB3341 | - 26 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  source and its application and to determine all applicable
 | 
| 2 |  |  requirements, pursuant to the Clean Air Act, and  | 
| 3 |  |  regulations thereunder, this
Act and regulations  | 
| 4 |  |  thereunder. Such Agency application forms shall be
 | 
| 5 |  |  finalized and made available prior to the date on which any  | 
| 6 |  |  CAAPP application
is required.
 | 
| 7 |  |   d. An owner or operator of a CAAPP source shall submit,  | 
| 8 |  |  as part of its
complete CAAPP application, a compliance  | 
| 9 |  |  plan, including a schedule of
compliance, describing how  | 
| 10 |  |  each emission unit will comply with all applicable
 | 
| 11 |  |  requirements. Any such schedule of compliance shall be  | 
| 12 |  |  supplemental to, and
shall not sanction noncompliance  | 
| 13 |  |  with, the applicable requirements on which it
is based.
 | 
| 14 |  |   e. Each submitted CAAPP application shall be certified  | 
| 15 |  |  for truth,
accuracy, and completeness by a responsible  | 
| 16 |  |  official in accordance with
applicable regulations.
 | 
| 17 |  |   f. The Agency shall provide notice to a CAAPP applicant  | 
| 18 |  |  as to whether a
submitted CAAPP application is complete.  | 
| 19 |  |  Unless the Agency notifies the
applicant of  | 
| 20 |  |  incompleteness, within 60 days after receipt of the CAAPP
 | 
| 21 |  |  application, the application shall be deemed complete. The  | 
| 22 |  |  Agency may request
additional information as needed to make  | 
| 23 |  |  the completeness determination. The
Agency may to the  | 
| 24 |  |  extent practicable provide the applicant with a reasonable
 | 
| 25 |  |  opportunity to correct deficiencies prior to a final  | 
| 26 |  |  determination of
completeness.
 | 
     | 
 |  | HB3341 | - 27 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   g. If after the determination of completeness the  | 
| 2 |  |  Agency finds that
additional information is necessary to  | 
| 3 |  |  evaluate or take final action on the
CAAPP application, the  | 
| 4 |  |  Agency may request in writing such information from the
 | 
| 5 |  |  source with a reasonable deadline for response.
 | 
| 6 |  |   h. If the owner or operator of a CAAPP source submits a  | 
| 7 |  |  timely and
complete CAAPP application, the source's  | 
| 8 |  |  failure to have a CAAPP permit shall
not be a violation of  | 
| 9 |  |  this Section until the Agency takes final action on the
 | 
| 10 |  |  submitted CAAPP application, provided, however, where the  | 
| 11 |  |  applicant fails to
submit the requested information under  | 
| 12 |  |  paragraph(g) of this subsection 5 within the time frame
 | 
| 13 |  |  specified by the Agency, this protection shall cease to  | 
| 14 |  |  apply.
 | 
| 15 |  |   i. Any applicant who fails to submit any relevant facts  | 
| 16 |  |  necessary to
evaluate the subject source and its CAAPP  | 
| 17 |  |  application or who has submitted
incorrect information in a  | 
| 18 |  |  CAAPP application shall, upon becoming aware of such
 | 
| 19 |  |  failure or incorrect submittal, submit supplementary facts  | 
| 20 |  |  or correct
information to the Agency. In addition, an  | 
| 21 |  |  applicant shall provide to the
Agency additional  | 
| 22 |  |  information as necessary to address any requirements which
 | 
| 23 |  |  become applicable to the source subsequent to the date the  | 
| 24 |  |  applicant submitted
its complete CAAPP application but  | 
| 25 |  |  prior to release of the draft CAAPP permit.
 | 
| 26 |  |   j. The Agency shall issue or deny the CAAPP permit  | 
     | 
 |  | HB3341 | - 28 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  within 18 months after
the date of receipt of the complete  | 
| 2 |  |  CAAPP application, with the following
exceptions: (i)  | 
| 3 |  |  permits for affected sources for acid deposition shall be
 | 
| 4 |  |  issued or denied within 6 months after receipt of a  | 
| 5 |  |  complete application in
accordance with subsection 17 of  | 
| 6 |  |  this Section; (ii) the Agency shall act on
initial CAAPP  | 
| 7 |  |  applications within 24 months after the date of receipt of  | 
| 8 |  |  the
complete CAAPP application; (iii) the Agency shall act  | 
| 9 |  |  on complete applications
containing early reduction  | 
| 10 |  |  demonstrations under Section 112(i)(5) of the Clean
Air Act  | 
| 11 |  |  within 9 months of receipt of the complete CAAPP  | 
| 12 |  |  application.
 | 
| 13 |  |   Where the Agency does not take final action on the  | 
| 14 |  |  permit within the
required time period, the permit shall  | 
| 15 |  |  not be deemed issued; rather, the
failure to act shall be  | 
| 16 |  |  treated as a final permit action for purposes of
judicial  | 
| 17 |  |  review pursuant to Sections 40.2 and 41 of this Act.
 | 
| 18 |  |   k. The submittal of a complete CAAPP application shall  | 
| 19 |  |  not affect the
requirement that any source have a  | 
| 20 |  |  preconstruction permit under Title I of the
Clean Air Act.
 | 
| 21 |  |   l. Unless a timely and complete renewal application has  | 
| 22 |  |  been submitted
consistent with this subsection, a CAAPP  | 
| 23 |  |  source operating upon the expiration
of its CAAPP permit  | 
| 24 |  |  shall be deemed to be operating without a CAAPP permit.
 | 
| 25 |  |  Such operation is prohibited under this Act.
 | 
| 26 |  |   m. Permits being renewed shall be subject to the same  | 
     | 
 |  | HB3341 | - 29 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  procedural
requirements, including those for public  | 
| 2 |  |  participation and federal review and
objection, that apply  | 
| 3 |  |  to original permit issuance.
 | 
| 4 |  |   n. For purposes of permit renewal, a timely application  | 
| 5 |  |  is one that is
submitted no less than 9 months prior to the  | 
| 6 |  |  date of permit expiration.
 | 
| 7 |  |   o. The terms and conditions of a CAAPP permit shall  | 
| 8 |  |  remain in effect until
the issuance of a CAAPP renewal  | 
| 9 |  |  permit provided a timely and complete CAAPP
application has  | 
| 10 |  |  been submitted.
 | 
| 11 |  |   p. The owner or operator of a CAAPP source seeking a  | 
| 12 |  |  permit shield
pursuant to paragraph(j) of subsection 7 of  | 
| 13 |  |  this Section shall request such permit shield in
the CAAPP  | 
| 14 |  |  application regarding that source.
 | 
| 15 |  |   q. The Agency shall make available to the public all  | 
| 16 |  |  documents submitted
by the applicant to the Agency,  | 
| 17 |  |  including each CAAPP application, compliance
plan  | 
| 18 |  |  (including the schedule of compliance), and emissions or  | 
| 19 |  |  compliance
monitoring report, with the exception of  | 
| 20 |  |  information entitled to confidential
treatment pursuant to  | 
| 21 |  |  Section 7 of this Act.
 | 
| 22 |  |   r. The Agency shall use the standardized forms required  | 
| 23 |  |  under Title IV of
the Clean Air Act and regulations  | 
| 24 |  |  promulgated thereunder for affected sources
for acid  | 
| 25 |  |  deposition.
 | 
| 26 |  |   s. An owner or operator of a CAAPP source may include  | 
     | 
 |  | HB3341 | - 30 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  within its CAAPP
application a request for permission to  | 
| 2 |  |  operate during a startup, malfunction,
or breakdown  | 
| 3 |  |  consistent with applicable Board regulations.
 | 
| 4 |  |   t. An owner or operator of a CAAPP source, in
order to  | 
| 5 |  |  utilize the operational flexibility provided under
 | 
| 6 |  |  paragraph(l) of subsection 7 of this Section, must request  | 
| 7 |  |  such use and
provide the necessary information within its  | 
| 8 |  |  CAAPP application.
 | 
| 9 |  |   u. An owner or operator of a CAAPP source which seeks  | 
| 10 |  |  exclusion from the
CAAPP through the imposition of  | 
| 11 |  |  federally enforceable conditions, pursuant to
paragraph(c)  | 
| 12 |  |  of subsection 3 of this Section, must request such  | 
| 13 |  |  exclusion within a CAAPP
application submitted consistent  | 
| 14 |  |  with this subsection on or after the date that
the CAAPP  | 
| 15 |  |  application for the source is due. Prior to such date, but  | 
| 16 |  |  in no case
later than 9 months after the effective date of  | 
| 17 |  |  the CAAPP, such owner or
operator may request the  | 
| 18 |  |  imposition of federally enforceable conditions
pursuant to  | 
| 19 |  |  paragraph(b) of subsection 1.1 of this Section.
 | 
| 20 |  |   v. CAAPP applications shall contain accurate  | 
| 21 |  |  information on allowable
emissions to implement the fee  | 
| 22 |  |  provisions of subsection 18 of this Section.
 | 
| 23 |  |   w. An owner or operator of a CAAPP source shall submit  | 
| 24 |  |  within its CAAPP
application emissions information  | 
| 25 |  |  regarding all regulated air pollutants
emitted at that  | 
| 26 |  |  source consistent with applicable Agency procedures.  | 
     | 
 |  | HB3341 | - 31 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  Emissions
information regarding insignificant activities  | 
| 2 |  |  or emission levels, as
determined by the Agency pursuant to  | 
| 3 |  |  Board regulations,
may be submitted as a list within the  | 
| 4 |  |  CAAPP application.
The Agency shall propose regulations to  | 
| 5 |  |  the Board defining insignificant
activities or emission  | 
| 6 |  |  levels, consistent with federal regulations, if any,
no  | 
| 7 |  |  later than 18 months after the effective date of this  | 
| 8 |  |  amendatory Act of
1992, consistent with Section 112(n)(1)  | 
| 9 |  |  of the Clean Air Act. The
Board shall adopt final  | 
| 10 |  |  regulations defining insignificant activities or
emission  | 
| 11 |  |  levels no later than 9 months after the date of the  | 
| 12 |  |  Agency's proposal.
 | 
| 13 |  |   x. The owner or operator of a new CAAPP source shall  | 
| 14 |  |  submit its complete
CAAPP application consistent with this  | 
| 15 |  |  subsection within 12 months after
commencing operation of  | 
| 16 |  |  such source.
The owner or operator of an existing source  | 
| 17 |  |  that has been excluded from the
provisions of this Section  | 
| 18 |  |  under subsection 1.1 or paragraph (c) of subsection 3 of
 | 
| 19 |  |  this Section and that becomes subject to the CAAPP solely  | 
| 20 |  |  due to a change in
operation at the source shall submit its  | 
| 21 |  |  complete CAAPP application consistent
with this subsection  | 
| 22 |  |  at least 180 days before commencing operation in
accordance  | 
| 23 |  |  with the change in operation.
 | 
| 24 |  |   y. The Agency shall have the authority to adopt  | 
| 25 |  |  procedural rules, in
accordance with the Illinois  | 
| 26 |  |  Administrative Procedure Act, as the Agency deems
 | 
     | 
 |  | HB3341 | - 32 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  necessary to implement this subsection. 
 | 
| 2 |  |  6. Prohibitions.
 | 
| 3 |  |   a. It shall be unlawful for any person to violate any  | 
| 4 |  |  terms or conditions
of a permit issued under this Section,  | 
| 5 |  |  to operate any CAAPP source except in
compliance with a  | 
| 6 |  |  permit issued by the Agency under this Section or to  | 
| 7 |  |  violate
any other applicable requirements. All terms and  | 
| 8 |  |  conditions of a permit issued
under this Section are  | 
| 9 |  |  enforceable by USEPA and citizens under the Clean Air
Act,  | 
| 10 |  |  except those, if any, that are specifically designated as  | 
| 11 |  |  not being
federally enforceable in the permit pursuant to  | 
| 12 |  |  paragraph(m) of subsection 7 of this Section.
 | 
| 13 |  |   b. After the applicable CAAPP permit or renewal  | 
| 14 |  |  application submittal
date, as specified in subsection 5 of  | 
| 15 |  |  this Section, no person shall operate a
CAAPP source  | 
| 16 |  |  without a CAAPP permit unless the complete CAAPP permit or  | 
| 17 |  |  renewal
application for such source has been timely  | 
| 18 |  |  submitted to the Agency.
 | 
| 19 |  |   c. No owner or operator of a CAAPP source shall cause  | 
| 20 |  |  or threaten or allow
the continued operation of an emission  | 
| 21 |  |  source during malfunction or breakdown
of the emission  | 
| 22 |  |  source or related air pollution control equipment if such
 | 
| 23 |  |  operation would cause a violation of the standards or  | 
| 24 |  |  limitations applicable to
the source, unless the CAAPP  | 
| 25 |  |  permit granted to the source provides for such
operation  | 
     | 
 |  | HB3341 | - 33 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  consistent with this Act and applicable Board regulations.
 | 
| 2 |  |  7. Permit Content.
 | 
| 3 |  |   a. All CAAPP permits shall contain emission  | 
| 4 |  |  limitations and standards and
other enforceable terms and  | 
| 5 |  |  conditions, including but not limited to
operational  | 
| 6 |  |  requirements, and schedules for achieving compliance at  | 
| 7 |  |  the
earliest reasonable date, which are or will be required  | 
| 8 |  |  to accomplish the
purposes and provisions of this Act and  | 
| 9 |  |  to assure compliance with all
applicable requirements.
 | 
| 10 |  |   b. The Agency shall include among such conditions  | 
| 11 |  |  applicable monitoring,
reporting, record keeping and  | 
| 12 |  |  compliance certification requirements, as
authorized by  | 
| 13 |  |  paragraphs (d), (e), and (f) of this subsection, that the  | 
| 14 |  |  Agency deems
necessary to assure compliance with the Clean  | 
| 15 |  |  Air Act, the regulations
promulgated thereunder, this Act,  | 
| 16 |  |  and applicable Board regulations. When
monitoring,  | 
| 17 |  |  reporting, record keeping, and compliance certification
 | 
| 18 |  |  requirements are specified within the Clean Air Act,  | 
| 19 |  |  regulations promulgated
thereunder, this Act, or  | 
| 20 |  |  applicable regulations, such requirements shall be
 | 
| 21 |  |  included within the CAAPP permit. The Board shall have  | 
| 22 |  |  authority to promulgate
additional regulations where  | 
| 23 |  |  necessary to accomplish the purposes of the Clean
Air Act,  | 
| 24 |  |  this Act, and regulations promulgated thereunder.
 | 
| 25 |  |   c. The Agency shall assure, within such conditions, the  | 
     | 
 |  | HB3341 | - 34 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  use of terms, test
methods, units, averaging periods, and  | 
| 2 |  |  other statistical conventions consistent
with the  | 
| 3 |  |  applicable emission limitations, standards, and other  | 
| 4 |  |  requirements
contained in the permit.
 | 
| 5 |  |   d. To meet the requirements of this subsection with  | 
| 6 |  |  respect to monitoring,
the permit shall:
 | 
| 7 |  |    i. Incorporate and identify all applicable  | 
| 8 |  |  emissions monitoring and
analysis procedures or test  | 
| 9 |  |  methods required under the Clean Air Act,
regulations  | 
| 10 |  |  promulgated thereunder, this Act, and applicable Board  | 
| 11 |  |  regulations,
including any procedures and methods  | 
| 12 |  |  promulgated by USEPA pursuant to Section
504(b) or  | 
| 13 |  |  Section 114 (a)(3) of the Clean Air Act.
 | 
| 14 |  |    ii. Where the applicable requirement does not  | 
| 15 |  |  require periodic testing
or instrumental or  | 
| 16 |  |  noninstrumental monitoring (which may consist of
 | 
| 17 |  |  recordkeeping designed to serve as monitoring),  | 
| 18 |  |  require periodic monitoring
sufficient to yield  | 
| 19 |  |  reliable data from the relevant time period that is
 | 
| 20 |  |  representative of the source's compliance with the  | 
| 21 |  |  permit, as reported pursuant
to paragraph (f) of this  | 
| 22 |  |  subsection. The Agency may determine that
 | 
| 23 |  |  recordkeeping requirements are sufficient to meet the  | 
| 24 |  |  requirements of this
subparagraph.
 | 
| 25 |  |    iii. As necessary, specify requirements concerning  | 
| 26 |  |  the use, maintenance,
and when appropriate,  | 
     | 
 |  | HB3341 | - 35 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  installation of monitoring equipment or methods.
 | 
| 2 |  |   e. To meet the requirements of this subsection with  | 
| 3 |  |  respect to record
keeping, the permit shall incorporate and  | 
| 4 |  |  identify all applicable recordkeeping
requirements and  | 
| 5 |  |  require, where applicable, the following:
 | 
| 6 |  |    i. Records of required monitoring information that  | 
| 7 |  |  include the
following:
 | 
| 8 |  |     A. The date, place and time of sampling or  | 
| 9 |  |  measurements.
 | 
| 10 |  |     B. The date(s) analyses were performed.
 | 
| 11 |  |     C. The company or entity that performed the  | 
| 12 |  |  analyses.
 | 
| 13 |  |     D. The analytical techniques or methods used.
 | 
| 14 |  |     E. The results of such analyses.
 | 
| 15 |  |     F. The operating conditions as existing at the  | 
| 16 |  |  time of sampling or
measurement.
 | 
| 17 |  |    ii.    Retention of records of all monitoring data  | 
| 18 |  |  and support
information for a period of at least 5  | 
| 19 |  |  years from the date of the monitoring
sample,  | 
| 20 |  |  measurement, report, or application. Support  | 
| 21 |  |  information includes all
calibration and maintenance  | 
| 22 |  |  records, original strip-chart recordings for
 | 
| 23 |  |  continuous monitoring instrumentation, and copies of  | 
| 24 |  |  all reports required by
the permit.
 | 
| 25 |  |   f. To meet the requirements of this subsection with  | 
| 26 |  |  respect to reporting,
the permit shall incorporate and  | 
     | 
 |  | HB3341 | - 36 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  identify all applicable reporting requirements
and require  | 
| 2 |  |  the following:
 | 
| 3 |  |    i. Submittal of reports of any required monitoring  | 
| 4 |  |  every 6 months. More
frequent submittals may be  | 
| 5 |  |  requested by the Agency if such submittals are
 | 
| 6 |  |  necessary to assure compliance with this Act or  | 
| 7 |  |  regulations promulgated by the
Board thereunder. All  | 
| 8 |  |  instances of deviations from permit requirements must  | 
| 9 |  |  be
clearly identified in such reports. All required  | 
| 10 |  |  reports must be certified by
a responsible official  | 
| 11 |  |  consistent with subsection 5 of this Section.
 | 
| 12 |  |    ii. Prompt reporting of deviations from permit  | 
| 13 |  |  requirements, including
those attributable to upset  | 
| 14 |  |  conditions as defined in the permit, the probable
cause  | 
| 15 |  |  of such deviations, and any corrective actions or  | 
| 16 |  |  preventive measures
taken.
 | 
| 17 |  |   g. Each CAAPP permit issued under subsection 10 of this  | 
| 18 |  |  Section shall
include a condition prohibiting emissions  | 
| 19 |  |  exceeding any allowances that the
source lawfully holds  | 
| 20 |  |  under Title IV of the Clean Air Act or the regulations
 | 
| 21 |  |  promulgated thereunder, consistent with subsection 17 of  | 
| 22 |  |  this Section and
applicable regulations, if any.
 | 
| 23 |  |   h. All CAAPP permits shall state that, where another  | 
| 24 |  |  applicable
requirement of the Clean Air Act is more  | 
| 25 |  |  stringent than any applicable
requirement of regulations  | 
| 26 |  |  promulgated under Title IV of the Clean Air Act,
both  | 
     | 
 |  | HB3341 | - 37 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  provisions shall be incorporated into the permit and shall  | 
| 2 |  |  be State and
federally enforceable.
 | 
| 3 |  |   i. Each CAAPP permit issued under subsection 10 of this  | 
| 4 |  |  Section shall
include a severability clause to ensure the  | 
| 5 |  |  continued validity of the various
permit requirements in  | 
| 6 |  |  the event of a challenge to any portions of the permit.
 | 
| 7 |  |   j. The following shall apply with respect to owners or  | 
| 8 |  |  operators
requesting a permit shield:
 | 
| 9 |  |    i. The Agency shall include in a CAAPP permit, when  | 
| 10 |  |  requested by an
applicant pursuant to paragraph(p) of  | 
| 11 |  |  subsection 5 of this Section, a provision stating that
 | 
| 12 |  |  compliance with the conditions of the permit shall be  | 
| 13 |  |  deemed compliance with
applicable requirements which  | 
| 14 |  |  are applicable as of the date of release of
the  | 
| 15 |  |  proposed permit, provided that:
 | 
| 16 |  |     A. The applicable requirement is specifically  | 
| 17 |  |  identified within the
permit; or
 | 
| 18 |  |     B. The Agency in acting on the CAAPP  | 
| 19 |  |  application or revision
determines in writing that  | 
| 20 |  |  other requirements specifically identified are not
 | 
| 21 |  |  applicable to the source, and the permit includes  | 
| 22 |  |  that determination or a
concise summary thereof.
 | 
| 23 |  |    ii. The permit shall identify the requirements for  | 
| 24 |  |  which the source is
shielded. The shield shall not  | 
| 25 |  |  extend to applicable requirements which are
 | 
| 26 |  |  promulgated after the date of release of the proposed  | 
     | 
 |  | HB3341 | - 38 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  permit unless the permit
has been modified to reflect  | 
| 2 |  |  such new requirements.
 | 
| 3 |  |    iii. A CAAPP permit which does not expressly  | 
| 4 |  |  indicate the existence of a
permit shield shall not  | 
| 5 |  |  provide such a shield.
 | 
| 6 |  |    iv. Nothing in this paragraph or in a CAAPP permit  | 
| 7 |  |  shall alter or affect
the following:
 | 
| 8 |  |     A. The provisions of Section 303 (emergency  | 
| 9 |  |  powers) of the Clean Air
Act, including USEPA's  | 
| 10 |  |  authority under that section.
 | 
| 11 |  |     B. The liability of an owner or operator of a  | 
| 12 |  |  source for any violation
of applicable  | 
| 13 |  |  requirements prior to or at the time of permit  | 
| 14 |  |  issuance.
 | 
| 15 |  |     C. The applicable requirements of the acid  | 
| 16 |  |  rain program consistent
with Section 408(a) of the  | 
| 17 |  |  Clean Air Act.
 | 
| 18 |  |     D. The ability of USEPA to obtain information  | 
| 19 |  |  from a source pursuant
to Section 114  | 
| 20 |  |  (inspections, monitoring, and entry) of the Clean  | 
| 21 |  |  Air Act.
 | 
| 22 |  |   k. Each CAAPP permit shall include an emergency  | 
| 23 |  |  provision providing an
affirmative defense of emergency to  | 
| 24 |  |  an action brought for noncompliance with
technology-based  | 
| 25 |  |  emission limitations under a CAAPP permit if the following
 | 
| 26 |  |  conditions are met through properly signed,  | 
     | 
 |  | HB3341 | - 39 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  contemporaneous operating logs, or
other relevant  | 
| 2 |  |  evidence:
 | 
| 3 |  |    i. An emergency occurred and the permittee can  | 
| 4 |  |  identify the cause(s) of
the emergency.
 | 
| 5 |  |    ii. The permitted facility was at the time being  | 
| 6 |  |  properly operated.
 | 
| 7 |  |    iii. The permittee submitted notice of the  | 
| 8 |  |  emergency to the Agency
within 2 working days after the  | 
| 9 |  |  time when emission limitations were exceeded due
to the  | 
| 10 |  |  emergency. This notice must contain a detailed  | 
| 11 |  |  description of the
emergency, any steps taken to  | 
| 12 |  |  mitigate emissions, and corrective actions taken.
 | 
| 13 |  |    iv. During the period of the emergency the  | 
| 14 |  |  permittee took all reasonable
steps to minimize levels  | 
| 15 |  |  of emissions that exceeded the emission limitations,
 | 
| 16 |  |  standards, or requirements in the permit.
 | 
| 17 |  |   For purposes of this subsection, "emergency" means any  | 
| 18 |  |  situation arising
from sudden and reasonably unforeseeable  | 
| 19 |  |  events beyond the control of the
source, such as an act of  | 
| 20 |  |  God, that requires immediate corrective action to
restore  | 
| 21 |  |  normal operation, and that causes the source to exceed a
 | 
| 22 |  |  technology-based emission limitation under the permit, due  | 
| 23 |  |  to unavoidable
increases in emissions attributable to the  | 
| 24 |  |  emergency. An emergency shall not
include noncompliance to  | 
| 25 |  |  the extent caused by improperly designed equipment,
lack of  | 
| 26 |  |  preventative maintenance, careless or improper operation,  | 
     | 
 |  | HB3341 | - 40 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  or operation
error.
 | 
| 2 |  |   In any enforcement proceeding, the permittee seeking  | 
| 3 |  |  to establish the
occurrence of an emergency has the burden  | 
| 4 |  |  of proof. This provision is in
addition to any emergency or  | 
| 5 |  |  upset provision contained in any applicable
requirement.  | 
| 6 |  |  This provision does not relieve a permittee of any  | 
| 7 |  |  reporting
obligations under existing federal or state laws  | 
| 8 |  |  or regulations.
 | 
| 9 |  |   l. The Agency shall include in each permit issued under  | 
| 10 |  |  subsection 10 of this Section:
 | 
| 11 |  |    i. Terms and conditions for reasonably anticipated  | 
| 12 |  |  operating scenarios
identified by the source in its  | 
| 13 |  |  application. The permit terms and
conditions for each  | 
| 14 |  |  such operating scenario shall meet all applicable
 | 
| 15 |  |  requirements and the requirements of this Section.
 | 
| 16 |  |     A. Under this subparagraph, the source must  | 
| 17 |  |  record in a log at the
permitted facility a record  | 
| 18 |  |  of the scenario under which it is operating
 | 
| 19 |  |  contemporaneously with making a change from one  | 
| 20 |  |  operating scenario to another.
 | 
| 21 |  |     B. The permit shield described in paragraph(j)  | 
| 22 |  |  of subsection 7 of this Section
shall extend to all  | 
| 23 |  |  terms and conditions under each such operating  | 
| 24 |  |  scenario.
 | 
| 25 |  |    ii. Where requested by an applicant, all terms and  | 
| 26 |  |  conditions allowing
for trading of emissions increases  | 
     | 
 |  | HB3341 | - 41 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  and decreases between different emission
units at the  | 
| 2 |  |  CAAPP source, to the extent that the applicable  | 
| 3 |  |  requirements
provide for trading of such emissions  | 
| 4 |  |  increases and decreases without a
case-by-case  | 
| 5 |  |  approval of each emissions trade. Such terms and  | 
| 6 |  |  conditions:
 | 
| 7 |  |     A. Shall include all terms required under this  | 
| 8 |  |  subsection to determine
compliance;
 | 
| 9 |  |     B. Must meet all applicable requirements;
 | 
| 10 |  |     C. Shall extend the permit shield described in  | 
| 11 |  |  paragraph(j) of subsection 7 of this
Section to all  | 
| 12 |  |  terms and conditions that allow such increases and  | 
| 13 |  |  decreases in
emissions.
 | 
| 14 |  |   m. The Agency shall specifically designate as not being  | 
| 15 |  |  federally
enforceable under the Clean Air Act any terms and  | 
| 16 |  |  conditions included in the
permit that are not specifically  | 
| 17 |  |  required under the Clean Air Act or federal
regulations  | 
| 18 |  |  promulgated thereunder. Terms or conditions so designated  | 
| 19 |  |  shall be
subject to all applicable state requirements,  | 
| 20 |  |  except the requirements of
subsection 7 (other than this  | 
| 21 |  |  paragraph, paragraph q of subsection 7,
subsections 8  | 
| 22 |  |  through 11, and subsections 13 through 16 of this Section.  | 
| 23 |  |  The
Agency shall, however, include such terms and  | 
| 24 |  |  conditions in the CAAPP permit
issued to the source.
 | 
| 25 |  |   n. Each CAAPP permit issued under subsection 10 of this  | 
| 26 |  |  Section shall
specify and reference the origin of and  | 
     | 
 |  | HB3341 | - 42 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  authority for each term or condition,
and identify any  | 
| 2 |  |  difference in form as compared to the applicable  | 
| 3 |  |  requirement
upon which the term or condition is based.
 | 
| 4 |  |   o. Each CAAPP permit issued under subsection 10 of this  | 
| 5 |  |  Section shall
include provisions stating the following:
 | 
| 6 |  |    i. Duty to comply. The permittee must comply with  | 
| 7 |  |  all terms and
conditions of the CAAPP permit. Any  | 
| 8 |  |  permit noncompliance constitutes a
violation of the  | 
| 9 |  |  Clean Air Act and the Act, and is grounds for any or  | 
| 10 |  |  all of
the following: enforcement action; permit  | 
| 11 |  |  termination, revocation and
reissuance, or  | 
| 12 |  |  modification; or denial of a permit renewal  | 
| 13 |  |  application.
 | 
| 14 |  |    ii. Need to halt or reduce activity not a defense.  | 
| 15 |  |  It shall not be a
defense for a permittee in an  | 
| 16 |  |  enforcement action that it would have been
necessary to  | 
| 17 |  |  halt or reduce the permitted activity in order to  | 
| 18 |  |  maintain
compliance with the conditions of this  | 
| 19 |  |  permit.
 | 
| 20 |  |    iii. Permit actions. The permit may be modified,  | 
| 21 |  |  revoked, reopened, and
reissued, or terminated for  | 
| 22 |  |  cause in accordance with the applicable subsections
of  | 
| 23 |  |  Section 39.5 of this Act. The filing of a request by  | 
| 24 |  |  the permittee for a
permit modification, revocation  | 
| 25 |  |  and reissuance, or termination, or of a
notification of  | 
| 26 |  |  planned changes or anticipated noncompliance does not  | 
     | 
 |  | HB3341 | - 43 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  stay any
permit condition.
 | 
| 2 |  |    iv. Property rights. The permit does not convey any  | 
| 3 |  |  property rights of
any sort, or any exclusive  | 
| 4 |  |  privilege.
 | 
| 5 |  |    v. Duty to provide information. The permittee  | 
| 6 |  |  shall furnish to the
Agency within a reasonable time  | 
| 7 |  |  specified by the Agency any information that
the Agency  | 
| 8 |  |  may request in writing to determine whether cause  | 
| 9 |  |  exists for
modifying, revoking and reissuing, or  | 
| 10 |  |  terminating the permit or to determine
compliance with  | 
| 11 |  |  the permit. Upon request, the permittee shall also  | 
| 12 |  |  furnish to
the Agency copies of records required to be  | 
| 13 |  |  kept by the permit or, for
information claimed to be  | 
| 14 |  |  confidential, the permittee may furnish such records
 | 
| 15 |  |  directly to USEPA along with a claim of  | 
| 16 |  |  confidentiality.
 | 
| 17 |  |    vi. Duty to pay fees. The permittee must pay fees  | 
| 18 |  |  to the Agency
consistent with the fee schedule approved  | 
| 19 |  |  pursuant to subsection 18 of this
Section, and submit  | 
| 20 |  |  any information relevant thereto.
 | 
| 21 |  |    vii. Emissions trading. No permit revision shall  | 
| 22 |  |  be required for
increases in emissions allowed under  | 
| 23 |  |  any approved economic incentives,
marketable permits,  | 
| 24 |  |  emissions trading, and other similar programs or  | 
| 25 |  |  processes
for changes that are provided for in the  | 
| 26 |  |  permit and that are authorized by the
applicable  | 
     | 
 |  | HB3341 | - 44 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  requirement.
 | 
| 2 |  |   p. Each CAAPP permit issued under subsection 10 of this  | 
| 3 |  |  Section shall
contain the following elements with respect  | 
| 4 |  |  to compliance:
 | 
| 5 |  |    i. Compliance certification, testing, monitoring,  | 
| 6 |  |  reporting, and record
keeping requirements sufficient  | 
| 7 |  |  to assure compliance with the terms and
conditions of  | 
| 8 |  |  the permit. Any document (including reports) required  | 
| 9 |  |  by a CAAPP
permit shall contain a certification by a  | 
| 10 |  |  responsible official that meets the
requirements of  | 
| 11 |  |  subsection 5 of this Section and applicable  | 
| 12 |  |  regulations.
 | 
| 13 |  |    ii. Inspection and entry requirements that  | 
| 14 |  |  necessitate that, upon
presentation of credentials and  | 
| 15 |  |  other documents as may be required by law and
in  | 
| 16 |  |  accordance with constitutional limitations, the  | 
| 17 |  |  permittee shall allow the
Agency, or an authorized  | 
| 18 |  |  representative to perform the following:
 | 
| 19 |  |     A. Enter upon the permittee's premises where a  | 
| 20 |  |  CAAPP source is located
or emissions-related  | 
| 21 |  |  activity is conducted, or where records must be  | 
| 22 |  |  kept under
the conditions of the permit.
 | 
| 23 |  |     B. Have access to and copy, at reasonable  | 
| 24 |  |  times, any records that must
be kept under the  | 
| 25 |  |  conditions of the permit.
 | 
| 26 |  |     C. Inspect at reasonable times any facilities,  | 
     | 
 |  | HB3341 | - 45 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  equipment (including
monitoring and air pollution  | 
| 2 |  |  control equipment), practices, or operations
 | 
| 3 |  |  regulated or required under the permit.
 | 
| 4 |  |     D. Sample or monitor any substances or  | 
| 5 |  |  parameters at any location:
 | 
| 6 |  |      1. As authorized by the Clean Air Act, at  | 
| 7 |  |  reasonable times, for
the purposes of assuring  | 
| 8 |  |  compliance with the CAAPP permit or applicable
 | 
| 9 |  |  requirements; or
 | 
| 10 |  |      2. As otherwise authorized by this Act.
 | 
| 11 |  |    iii. A schedule of compliance consistent with  | 
| 12 |  |  subsection 5 of this
Section and applicable  | 
| 13 |  |  regulations.
 | 
| 14 |  |    iv. Progress reports consistent with an applicable  | 
| 15 |  |  schedule of
compliance pursuant to paragraph(d) of  | 
| 16 |  |  subsection 5 of this Section and applicable
 | 
| 17 |  |  regulations to be submitted semiannually, or more  | 
| 18 |  |  frequently if the Agency
determines that such more  | 
| 19 |  |  frequent submittals are necessary for compliance with
 | 
| 20 |  |  the Act or regulations promulgated by the Board  | 
| 21 |  |  thereunder. Such progress
reports shall contain the  | 
| 22 |  |  following:
 | 
| 23 |  |     A. Required dates for achieving the  | 
| 24 |  |  activities, milestones, or
compliance required by  | 
| 25 |  |  the schedule of compliance and dates when such
 | 
| 26 |  |  activities, milestones or compliance were  | 
     | 
 |  | HB3341 | - 46 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  achieved.
 | 
| 2 |  |     B. An explanation of why any dates in the  | 
| 3 |  |  schedule of compliance were
not or will not be met,  | 
| 4 |  |  and any preventive or corrective measures adopted.
 | 
| 5 |  |    v. Requirements for compliance certification with  | 
| 6 |  |  terms and conditions
contained in the permit,  | 
| 7 |  |  including emission limitations, standards, or work
 | 
| 8 |  |  practices. Permits shall include each of the  | 
| 9 |  |  following:
 | 
| 10 |  |     A. The frequency (annually or more frequently  | 
| 11 |  |  as specified in any
applicable requirement or by  | 
| 12 |  |  the Agency pursuant to written procedures) of
 | 
| 13 |  |  submissions of compliance certifications.
 | 
| 14 |  |     B. A means for assessing or monitoring the  | 
| 15 |  |  compliance of the source
with its emissions  | 
| 16 |  |  limitations, standards, and work practices.
 | 
| 17 |  |     C. A requirement that the compliance  | 
| 18 |  |  certification include the
following:
 | 
| 19 |  |      1. The identification of each term or  | 
| 20 |  |  condition contained in the
permit that is the  | 
| 21 |  |  basis of the certification.
 | 
| 22 |  |      2. The compliance status.
 | 
| 23 |  |      3. Whether compliance was continuous or  | 
| 24 |  |  intermittent.
 | 
| 25 |  |      4. The method(s) used for determining the  | 
| 26 |  |  compliance status of the
source, both  | 
     | 
 |  | HB3341 | - 47 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  currently and over the reporting period  | 
| 2 |  |  consistent with subsection
7 of this Section.
 | 
| 3 |  |     D. A requirement that all compliance  | 
| 4 |  |  certifications be submitted to
USEPA as well as to  | 
| 5 |  |  the Agency.
 | 
| 6 |  |     E. Additional requirements as may be specified  | 
| 7 |  |  pursuant to Sections
114(a)(3) and 504(b) of the  | 
| 8 |  |  Clean Air Act.
 | 
| 9 |  |     F. Other provisions as the Agency may require.
 | 
| 10 |  |   q. If the owner or operator of CAAPP source can  | 
| 11 |  |  demonstrate in its
CAAPP application, including an  | 
| 12 |  |  application for a significant modification,
that an  | 
| 13 |  |  alternative emission limit would be equivalent to that  | 
| 14 |  |  contained in the
applicable Board regulations, the Agency  | 
| 15 |  |  shall include the alternative
emission limit in the CAAPP  | 
| 16 |  |  permit, which shall supersede the
emission limit
set forth  | 
| 17 |  |  in the applicable Board regulations, and shall include  | 
| 18 |  |  conditions
that insure that the resulting emission limit is  | 
| 19 |  |  quantifiable, accountable,
enforceable, and based on  | 
| 20 |  |  replicable procedures.
 | 
| 21 |  |  8. Public Notice; Affected State Review.
 | 
| 22 |  |   a. The Agency shall provide notice to the public,  | 
| 23 |  |  including an opportunity
for public comment and a hearing,  | 
| 24 |  |  on each draft CAAPP permit for issuance,
renewal or  | 
| 25 |  |  significant modification, subject to Section 7.1 and  | 
| 26 |  |  subsection (a) of Section 7 of this
Act. 
 | 
     | 
 |  | HB3341 | - 48 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   b. The Agency shall prepare a draft CAAPP permit and a  | 
| 2 |  |  statement that sets
forth the legal and factual basis for  | 
| 3 |  |  the draft CAAPP permit conditions,
including references to  | 
| 4 |  |  the applicable statutory or regulatory provisions. The
 | 
| 5 |  |  Agency shall provide this statement to any person who  | 
| 6 |  |  requests it.
 | 
| 7 |  |   c. The Agency shall give notice of each draft CAAPP  | 
| 8 |  |  permit to the
applicant and to any affected State on or  | 
| 9 |  |  before the time that the Agency has
provided notice to the  | 
| 10 |  |  public, except as otherwise provided in this Act.
 | 
| 11 |  |   d. The Agency, as part of its submittal of a proposed  | 
| 12 |  |  permit to USEPA
(or as soon as possible after the submittal  | 
| 13 |  |  for minor permit modification
procedures allowed under  | 
| 14 |  |  subsection 14 of this Section), shall notify USEPA
and any  | 
| 15 |  |  affected State in writing of any refusal of the Agency to  | 
| 16 |  |  accept all
of the recommendations for the proposed permit  | 
| 17 |  |  that an affected State
submitted during the public or  | 
| 18 |  |  affected State review period. The notice
shall include the  | 
| 19 |  |  Agency's reasons for not accepting the recommendations.
 | 
| 20 |  |  The Agency is not required to accept recommendations that  | 
| 21 |  |  are not based on
applicable requirements or the  | 
| 22 |  |  requirements of this Section.
 | 
| 23 |  |   e. The Agency shall make available to the public any  | 
| 24 |  |  CAAPP permit
application, compliance plan (including the  | 
| 25 |  |  schedule of compliance), CAAPP
permit, and emissions or  | 
| 26 |  |  compliance monitoring report. If an owner or operator
of a  | 
     | 
 |  | HB3341 | - 49 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  CAAPP source is required to submit information entitled to  | 
| 2 |  |  protection from
disclosure under Section 7.1 and  | 
| 3 |  |  subsection (a) of Section 7 of this Act, the owner or  | 
| 4 |  |  operator
shall submit such information separately. The  | 
| 5 |  |  requirements of
Section 7.1 and subsection (a) of Section 7  | 
| 6 |  |  of this Act shall apply to such information, which shall  | 
| 7 |  |  not be
included in a CAAPP permit unless required by law.  | 
| 8 |  |  The contents of a CAAPP
permit shall not be entitled to  | 
| 9 |  |  protection under Section 7.1 and subsection (a) of Section  | 
| 10 |  |  7 of
this Act.
 | 
| 11 |  |   f. The Agency shall have the authority to adopt  | 
| 12 |  |  procedural rules, in
accordance with the Illinois  | 
| 13 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 14 |  |  necessary, to implement this subsection. 
 | 
| 15 |  |   g. If requested by the permit applicant, the Agency  | 
| 16 |  |  shall provide the permit applicant with a copy of the draft  | 
| 17 |  |  CAAPP permit prior to any public review period. If  | 
| 18 |  |  requested by the permit applicant, the Agency shall provide  | 
| 19 |  |  the permit applicant with a copy of the final CAAPP permit  | 
| 20 |  |  prior to issuance of the CAAPP permit. 
 | 
| 21 |  |  9. USEPA Notice and Objection.
 | 
| 22 |  |   a. The Agency shall provide to USEPA for its review a  | 
| 23 |  |  copy of each CAAPP
application (including any application  | 
| 24 |  |  for permit modification), statement of
basis as provided in  | 
| 25 |  |  paragraph(b) of subsection 8 of this Section, proposed  | 
     | 
 |  | HB3341 | - 50 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  CAAPP permit,
CAAPP permit, and, if the Agency does not  | 
| 2 |  |  incorporate any affected State's
recommendations on a  | 
| 3 |  |  proposed CAAPP permit, a written statement of this
decision  | 
| 4 |  |  and its reasons for not accepting the recommendations,  | 
| 5 |  |  except as
otherwise provided in this Act or by agreement  | 
| 6 |  |  with USEPA. To the extent
practicable, the preceding  | 
| 7 |  |  information shall be provided in computer readable
format  | 
| 8 |  |  compatible with USEPA's national database management  | 
| 9 |  |  system.
 | 
| 10 |  |   b. The Agency shall not issue the proposed CAAPP permit  | 
| 11 |  |  if USEPA objects
in writing within 45 days after receipt of  | 
| 12 |  |  the proposed CAAPP permit and all
necessary supporting  | 
| 13 |  |  information.
 | 
| 14 |  |   c. If USEPA objects in writing to the issuance of the  | 
| 15 |  |  proposed CAAPP
permit within the 45-day period, the Agency  | 
| 16 |  |  shall respond in writing and may
revise and resubmit the  | 
| 17 |  |  proposed CAAPP permit in response to the stated
objection,  | 
| 18 |  |  to the extent supported by the record, within 90 days after  | 
| 19 |  |  the date
of the objection. Prior to submitting a revised  | 
| 20 |  |  permit to USEPA, the Agency
shall provide the applicant and  | 
| 21 |  |  any person who participated in the public
comment process,  | 
| 22 |  |  pursuant to subsection 8 of this Section, with a 10-day  | 
| 23 |  |  period
to comment on any revision which the Agency is  | 
| 24 |  |  proposing to make to the permit
in response to USEPA's  | 
| 25 |  |  objection in accordance with Agency procedures.
 | 
| 26 |  |   d. Any USEPA objection under this subsection,  | 
     | 
 |  | HB3341 | - 51 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  according to the Clean Air
Act, will include a statement of  | 
| 2 |  |  reasons for the objection and a description of
the terms  | 
| 3 |  |  and conditions that must be in the permit, in order to  | 
| 4 |  |  adequately
respond to the objections. Grounds for a USEPA  | 
| 5 |  |  objection include the failure
of the Agency to: (1) submit  | 
| 6 |  |  the items and notices required under this
subsection; (2)  | 
| 7 |  |  submit any other information necessary to adequately  | 
| 8 |  |  review the
proposed CAAPP permit; or (3) process the permit  | 
| 9 |  |  under subsection 8 of this
Section except for minor permit  | 
| 10 |  |  modifications.
 | 
| 11 |  |   e. If USEPA does not object in writing to issuance of a  | 
| 12 |  |  permit under this
subsection, any person may petition USEPA  | 
| 13 |  |  within 60 days after expiration of
the 45-day review period  | 
| 14 |  |  to make such objection.
 | 
| 15 |  |   f. If the permit has not yet been issued and USEPA  | 
| 16 |  |  objects to the permit
as a result of a petition, the Agency  | 
| 17 |  |  shall not issue the permit until USEPA's
objection has been  | 
| 18 |  |  resolved. The Agency shall provide a 10-day comment period
 | 
| 19 |  |  in accordance with paragraph c of this subsection. A  | 
| 20 |  |  petition does not,
however, stay the effectiveness of a  | 
| 21 |  |  permit or its requirements if the permit
was issued after  | 
| 22 |  |  expiration of the 45-day review period and prior to a USEPA
 | 
| 23 |  |  objection.
 | 
| 24 |  |   g. If the Agency has issued a permit after expiration  | 
| 25 |  |  of the 45-day review
period and prior to receipt of a USEPA  | 
| 26 |  |  objection under this subsection in
response to a petition  | 
     | 
 |  | HB3341 | - 52 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  submitted pursuant to paragraph e of this subsection,
the  | 
| 2 |  |  Agency may, upon receipt of an objection from USEPA, revise  | 
| 3 |  |  and resubmit
the permit to USEPA pursuant to this  | 
| 4 |  |  subsection after providing a 10-day
comment period in  | 
| 5 |  |  accordance with paragraph c of this subsection. If the  | 
| 6 |  |  Agency
fails to submit a revised permit in response to the  | 
| 7 |  |  objection, USEPA shall
modify, terminate or revoke the  | 
| 8 |  |  permit. In any case, the source will not be in
violation of  | 
| 9 |  |  the requirement to have submitted a timely and complete
 | 
| 10 |  |  application.
 | 
| 11 |  |   h. The Agency shall have the authority to adopt  | 
| 12 |  |  procedural rules, in
accordance with the Illinois  | 
| 13 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 14 |  |  necessary, to implement this subsection.
 | 
| 15 |  |  10. Final Agency Action.
 | 
| 16 |  |   a. The Agency shall issue a CAAPP permit, permit  | 
| 17 |  |  modification, or permit
renewal if all of the following  | 
| 18 |  |  conditions are met:
 | 
| 19 |  |    i. The applicant has submitted a complete and  | 
| 20 |  |  certified application for
a permit, permit  | 
| 21 |  |  modification, or permit renewal consistent with  | 
| 22 |  |  subsections 5
and 14 of this Section, as applicable,  | 
| 23 |  |  and applicable regulations.
 | 
| 24 |  |    ii. The applicant has submitted with its complete  | 
| 25 |  |  application an
approvable compliance plan, including a  | 
     | 
 |  | HB3341 | - 53 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  schedule for achieving compliance,
consistent with  | 
| 2 |  |  subsection 5 of this Section and applicable  | 
| 3 |  |  regulations.
 | 
| 4 |  |    iii. The applicant has timely paid the fees  | 
| 5 |  |  required pursuant to
subsection 18 of this Section and  | 
| 6 |  |  applicable regulations.
 | 
| 7 |  |    iv. The Agency has received a complete CAAPP  | 
| 8 |  |  application and, if
necessary, has requested and  | 
| 9 |  |  received additional information from the applicant
 | 
| 10 |  |  consistent with subsection 5 of this Section and  | 
| 11 |  |  applicable regulations.
 | 
| 12 |  |    v. The Agency has complied with all applicable  | 
| 13 |  |  provisions regarding
public notice and affected State  | 
| 14 |  |  review consistent with subsection 8 of this
Section and  | 
| 15 |  |  applicable regulations.
 | 
| 16 |  |    vi. The Agency has provided a copy of each CAAPP  | 
| 17 |  |  application, or summary
thereof, pursuant to agreement  | 
| 18 |  |  with USEPA and proposed CAAPP permit required
under  | 
| 19 |  |  subsection 9 of this Section to USEPA, and USEPA has  | 
| 20 |  |  not objected to the
issuance of the permit in  | 
| 21 |  |  accordance with the Clean Air Act and 40 CFR Part 70.
 | 
| 22 |  |   b. The Agency shall have the authority to deny a CAAPP  | 
| 23 |  |  permit, permit
modification, or permit renewal if the  | 
| 24 |  |  applicant has not complied with the
requirements of  | 
| 25 |  |  subparagraphs (i) through (iv) of paragraph (a) of this  | 
| 26 |  |  subsection or if USEPA
objects to its issuance.
 | 
     | 
 |  | HB3341 | - 54 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   c. i. Prior to denial of a CAAPP permit, permit  | 
| 2 |  |  modification, or permit
renewal under this Section,  | 
| 3 |  |  the Agency shall notify the applicant of the
possible  | 
| 4 |  |  denial and the reasons for the denial.
 | 
| 5 |  |    ii. Within such notice, the Agency shall specify an  | 
| 6 |  |  appropriate date by
which the applicant shall  | 
| 7 |  |  adequately respond to the Agency's notice. Such date
 | 
| 8 |  |  shall not exceed 15 days from the date the notification  | 
| 9 |  |  is received by the
applicant. The Agency may grant a  | 
| 10 |  |  reasonable extension for good cause
shown.
 | 
| 11 |  |    iii. Failure by the applicant to adequately  | 
| 12 |  |  respond by the date
specified in the notification or by  | 
| 13 |  |  any granted extension date shall be grounds
for denial  | 
| 14 |  |  of the permit.
 | 
| 15 |  |    For purposes of obtaining judicial review under  | 
| 16 |  |  Sections 40.2 and 41 of
this Act, the Agency shall  | 
| 17 |  |  provide to USEPA and each applicant, and, upon
request,  | 
| 18 |  |  to affected States, any person who participated in the  | 
| 19 |  |  public comment
process, and any other person who could  | 
| 20 |  |  obtain judicial review under Sections
40.2 and 41 of  | 
| 21 |  |  this Act, a copy of each CAAPP permit or notification  | 
| 22 |  |  of denial
pertaining to that party.
 | 
| 23 |  |   d. The Agency shall have the authority to adopt  | 
| 24 |  |  procedural rules, in
accordance with the Illinois  | 
| 25 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 26 |  |  necessary, to implement this subsection.
 | 
     | 
 |  | HB3341 | - 55 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  11. General Permits.
 | 
| 2 |  |   a. The Agency may issue a general permit covering  | 
| 3 |  |  numerous similar
sources, except for affected sources for  | 
| 4 |  |  acid deposition unless otherwise
provided in regulations  | 
| 5 |  |  promulgated under Title IV of the Clean Air Act.
 | 
| 6 |  |   b. The Agency shall identify, in any general permit,  | 
| 7 |  |  criteria by which
sources may qualify for the general  | 
| 8 |  |  permit.
 | 
| 9 |  |   c. CAAPP sources that would qualify for a general  | 
| 10 |  |  permit must apply for
coverage under the terms of the  | 
| 11 |  |  general permit or must apply for a CAAPP permit
consistent  | 
| 12 |  |  with subsection 5 of this Section and applicable  | 
| 13 |  |  regulations.
 | 
| 14 |  |   d. The Agency shall comply with the public comment and  | 
| 15 |  |  hearing provisions
of this Section as well as the USEPA and  | 
| 16 |  |  affected State review procedures prior
to issuance of a  | 
| 17 |  |  general
permit.
 | 
| 18 |  |   e. When granting a subsequent request by a qualifying  | 
| 19 |  |  CAAPP source for
coverage under the terms of a general  | 
| 20 |  |  permit, the Agency shall not be required
to repeat the  | 
| 21 |  |  public notice and comment procedures. The granting of such
 | 
| 22 |  |  request shall not be considered a final permit action for  | 
| 23 |  |  purposes of judicial
review.
 | 
| 24 |  |   f. The Agency may not issue a general permit to cover  | 
| 25 |  |  any discrete
emission unit at a CAAPP source if another  | 
     | 
 |  | HB3341 | - 56 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  CAAPP permit covers emission units
at the source.
 | 
| 2 |  |   g. The Agency shall have the authority to adopt  | 
| 3 |  |  procedural rules, in
accordance with the Illinois  | 
| 4 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 5 |  |  necessary, to implement this subsection. 
 | 
| 6 |  |  12. Operational Flexibility.
 | 
| 7 |  |   a. An owner or operator of a CAAPP source may make  | 
| 8 |  |  changes at the CAAPP
source without requiring a prior  | 
| 9 |  |  permit revision, consistent with
subparagraphs (i) through  | 
| 10 |  |  (iii) of paragraph (a) of this subsection, so long as the
 | 
| 11 |  |  changes are not modifications under any provision of Title  | 
| 12 |  |  I of the Clean
Air Act and they do not exceed the emissions  | 
| 13 |  |  allowable under the permit
(whether expressed therein as a  | 
| 14 |  |  rate of emissions or in terms of total
emissions), provided  | 
| 15 |  |  that the owner or operator of the CAAPP source
provides  | 
| 16 |  |  USEPA and the Agency with written notification as required  | 
| 17 |  |  below in
advance of the proposed changes, which shall be a  | 
| 18 |  |  minimum of 7 days, unless
otherwise provided by the Agency  | 
| 19 |  |  in applicable regulations regarding
emergencies. The owner  | 
| 20 |  |  or operator of a CAAPP source and the Agency shall
each  | 
| 21 |  |  attach such notice to their copy of the relevant permit.
 | 
| 22 |  |    i. An owner or operator of a CAAPP source may make
 | 
| 23 |  |  Section 502 (b) (10) changes without a permit revision,  | 
| 24 |  |  if the
changes are not modifications under any  | 
| 25 |  |  provision of Title I of the Clean
Air Act and the  | 
     | 
 |  | HB3341 | - 57 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  changes do not exceed the emissions allowable under the
 | 
| 2 |  |  permit (whether expressed therein as a rate of  | 
| 3 |  |  emissions or in terms of total emissions).
 | 
| 4 |  |     A. For each such change, the written  | 
| 5 |  |  notification required above shall
include a brief  | 
| 6 |  |  description of the change within the source, the  | 
| 7 |  |  date on
which the change will occur, any change in  | 
| 8 |  |  emissions, and any permit term
or condition that is  | 
| 9 |  |  no longer applicable as a result of the change.
 | 
| 10 |  |     B. The permit shield described in paragraph(j)  | 
| 11 |  |  of subsection 7 of this Section shall
not apply to  | 
| 12 |  |  any change made pursuant to this subparagraph.
 | 
| 13 |  |    ii. An owner or operator of a CAAPP source may  | 
| 14 |  |  trade increases and
decreases in emissions in the CAAPP  | 
| 15 |  |  source, where the applicable
implementation plan  | 
| 16 |  |  provides for such emission trades without requiring a
 | 
| 17 |  |  permit revision. This provision is available in those  | 
| 18 |  |  cases where the
permit does not already provide for  | 
| 19 |  |  such emissions trading.
 | 
| 20 |  |     A. Under this subparagraph(ii) of paragraph  | 
| 21 |  |  (a) of this subsection, the written notification  | 
| 22 |  |  required
above shall include such information as  | 
| 23 |  |  may be required by the provision in
the applicable  | 
| 24 |  |  implementation plan authorizing the emissions  | 
| 25 |  |  trade,
including at a minimum, when the proposed  | 
| 26 |  |  changes will occur, a description
of each such  | 
     | 
 |  | HB3341 | - 58 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  change, any change in emissions, the permit  | 
| 2 |  |  requirements with
which the source will comply  | 
| 3 |  |  using the emissions trading provisions of the
 | 
| 4 |  |  applicable implementation plan, and the pollutants  | 
| 5 |  |  emitted subject to the
emissions trade. The notice  | 
| 6 |  |  shall also refer to the provisions in the
 | 
| 7 |  |  applicable implementation plan with which the  | 
| 8 |  |  source will comply and
provide for the emissions  | 
| 9 |  |  trade.
 | 
| 10 |  |     B. The permit shield described in paragraph(j)  | 
| 11 |  |  of subsection 7 of this Section shall
not apply to  | 
| 12 |  |  any change made pursuant to subparagraph (ii) of  | 
| 13 |  |  paragraph (a) of this subsection.
Compliance with  | 
| 14 |  |  the permit requirements that the source will meet  | 
| 15 |  |  using the
emissions trade shall be determined  | 
| 16 |  |  according to the requirements of the
applicable  | 
| 17 |  |  implementation plan authorizing the emissions  | 
| 18 |  |  trade.
 | 
| 19 |  |    iii. If requested within a CAAPP application, the  | 
| 20 |  |  Agency shall issue a
CAAPP permit which contains terms  | 
| 21 |  |  and conditions, including all terms
required under  | 
| 22 |  |  subsection 7 of this Section to determine compliance,
 | 
| 23 |  |  allowing for the trading of emissions increases and  | 
| 24 |  |  decreases at the CAAPP
source solely for the purpose of  | 
| 25 |  |  complying with a federally-enforceable
emissions cap  | 
| 26 |  |  that is established in the permit independent of  | 
     | 
 |  | HB3341 | - 59 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  otherwise
applicable requirements. The owner or  | 
| 2 |  |  operator of a CAAPP source shall include
in its CAAPP  | 
| 3 |  |  application proposed replicable procedures and permit  | 
| 4 |  |  terms that
ensure the emissions trades are  | 
| 5 |  |  quantifiable and enforceable. The permit shall
also  | 
| 6 |  |  require compliance with all applicable requirements.
 | 
| 7 |  |     A. Under this subparagraph(iii) of paragraph  | 
| 8 |  |  (a), the written notification required
above shall  | 
| 9 |  |  state when the change will occur and shall describe  | 
| 10 |  |  the changes
in emissions that will result and how  | 
| 11 |  |  these increases and decreases in
emissions will  | 
| 12 |  |  comply with the terms and conditions of the permit.
 | 
| 13 |  |     B. The permit shield described in paragraph(j)  | 
| 14 |  |  of subsection 7 of this Section shall
extend to  | 
| 15 |  |  terms and conditions that allow such increases and  | 
| 16 |  |  decreases in
emissions.
 | 
| 17 |  |   b. An owner or operator of a CAAPP source may make  | 
| 18 |  |  changes that are not
addressed or prohibited by the permit,  | 
| 19 |  |  other than those which are subject to
any requirements  | 
| 20 |  |  under Title IV of the Clean Air Act or are modifications  | 
| 21 |  |  under
any provisions of Title I of the Clean Air Act,  | 
| 22 |  |  without a permit
revision, in accordance with the following  | 
| 23 |  |  requirements:
 | 
| 24 |  |    (i) Each such change shall meet all applicable  | 
| 25 |  |  requirements and shall
not violate any existing permit  | 
| 26 |  |  term or condition;
 | 
     | 
 |  | HB3341 | - 60 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |    (ii) Sources must provide contemporaneous written  | 
| 2 |  |  notice to the Agency
and USEPA of each such change,  | 
| 3 |  |  except for changes that qualify as insignificant
under  | 
| 4 |  |  provisions adopted by the Agency or the Board. Such  | 
| 5 |  |  written notice shall
describe each such change,  | 
| 6 |  |  including the date, any change in emissions,
 | 
| 7 |  |  pollutants emitted, and any applicable requirement  | 
| 8 |  |  that would apply as a result
of the change;
 | 
| 9 |  |    (iii) The change shall not qualify for the shield  | 
| 10 |  |  described in paragraph
(j) of subsection 7 of this  | 
| 11 |  |  Section; and
 | 
| 12 |  |    (iv) The permittee shall keep a record describing  | 
| 13 |  |  changes made at the
source that result in emissions of  | 
| 14 |  |  a regulated air pollutant subject to an
applicable  | 
| 15 |  |  Clean Air Act requirement, but not otherwise regulated  | 
| 16 |  |  under the
permit, and the emissions resulting from  | 
| 17 |  |  those changes.
 | 
| 18 |  |   c. The Agency shall have the authority to adopt  | 
| 19 |  |  procedural rules, in
accordance with the Illinois  | 
| 20 |  |  Administrative Procedure Act, as the Agency
deems  | 
| 21 |  |  necessary to implement this subsection.
 | 
| 22 |  |  13. Administrative Permit Amendments.
 | 
| 23 |  |   a. The Agency shall take final action on a
request for  | 
| 24 |  |  an administrative permit amendment within 60 days after  | 
| 25 |  |  receipt of the
request. Neither notice nor an opportunity  | 
     | 
 |  | HB3341 | - 61 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  for public and affected State
comment shall be required for  | 
| 2 |  |  the Agency to incorporate such revisions,
provided it  | 
| 3 |  |  designates the permit revisions as having been made  | 
| 4 |  |  pursuant to
this subsection.
 | 
| 5 |  |   b. The Agency shall submit a copy of the revised permit  | 
| 6 |  |  to USEPA.
 | 
| 7 |  |   c. For purposes of this Section the term  | 
| 8 |  |  "administrative permit amendment"
shall be defined as a  | 
| 9 |  |  permit revision that can accomplish one or more of
the
 | 
| 10 |  |  changes described below:
 | 
| 11 |  |    i. Corrects typographical errors;
 | 
| 12 |  |    ii. Identifies a change in the name, address, or  | 
| 13 |  |  phone number of any
person identified in the permit, or  | 
| 14 |  |  provides a similar minor administrative
change at the  | 
| 15 |  |  source;
 | 
| 16 |  |    iii. Requires more frequent monitoring or  | 
| 17 |  |  reporting by the permittee;
 | 
| 18 |  |    iv. Allows for a change in ownership or operational  | 
| 19 |  |  control of a source
where the Agency determines that no  | 
| 20 |  |  other change in the permit is necessary,
provided that  | 
| 21 |  |  a written agreement containing a specific date for  | 
| 22 |  |  transfer of
permit responsibility, coverage, and  | 
| 23 |  |  liability between the current and new
permittees has  | 
| 24 |  |  been submitted to the Agency;
 | 
| 25 |  |    v. Incorporates into the CAAPP permit the  | 
| 26 |  |  requirements from
preconstruction review permits  | 
     | 
 |  | HB3341 | - 62 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  authorized under a USEPA-approved program,
provided  | 
| 2 |  |  the program meets procedural and compliance  | 
| 3 |  |  requirements substantially
equivalent to those  | 
| 4 |  |  contained in this Section;
 | 
| 5 |  |    vi. (Blank); or
 | 
| 6 |  |    vii. Any other type of change which USEPA has  | 
| 7 |  |  determined as part of
the
approved CAAPP permit program  | 
| 8 |  |  to be similar to those included in this
subsection.
 | 
| 9 |  |   d. The Agency shall, upon taking final action granting  | 
| 10 |  |  a request for
an administrative permit amendment, allow  | 
| 11 |  |  coverage by the permit shield in
paragraph(j) of subsection  | 
| 12 |  |  7 of this Section for administrative permit amendments made
 | 
| 13 |  |  pursuant to subparagraph(v) of paragraph (c) of this  | 
| 14 |  |  subsection which meet the relevant
requirements for  | 
| 15 |  |  significant permit modifications.
 | 
| 16 |  |   e. Permit revisions and modifications, including  | 
| 17 |  |  administrative amendments
and automatic amendments  | 
| 18 |  |  (pursuant to Sections 408(b) and 403(d) of the Clean
Air  | 
| 19 |  |  Act or regulations promulgated thereunder), for purposes  | 
| 20 |  |  of the acid rain
portion of the permit shall be governed by  | 
| 21 |  |  the regulations promulgated under
Title IV of the Clean Air  | 
| 22 |  |  Act. Owners or operators of affected sources for
acid  | 
| 23 |  |  deposition shall have the flexibility to amend their  | 
| 24 |  |  compliance plans as
provided in the regulations  | 
| 25 |  |  promulgated under Title IV of the Clean Air Act.
 | 
| 26 |  |   f. The CAAPP source may implement the changes addressed  | 
     | 
 |  | HB3341 | - 63 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  in the
request for an administrative permit amendment  | 
| 2 |  |  immediately upon submittal of
the request.
 | 
| 3 |  |   g. The Agency shall have the authority to adopt  | 
| 4 |  |  procedural rules, in
accordance with the Illinois  | 
| 5 |  |  Administrative Procedure Act, as the Agency
deems  | 
| 6 |  |  necessary, to implement this subsection.
 | 
| 7 |  |  14. Permit Modifications.
 | 
| 8 |  |   a. Minor permit modification procedures.
 | 
| 9 |  |    i. The Agency shall review a permit modification  | 
| 10 |  |  using the "minor
permit" modification procedures only  | 
| 11 |  |  for those permit modifications that:
 | 
| 12 |  |     A. Do not violate any applicable requirement;
 | 
| 13 |  |     B. Do not involve significant changes to  | 
| 14 |  |  existing monitoring,
reporting, or recordkeeping  | 
| 15 |  |  requirements in the permit;
 | 
| 16 |  |     C. Do not require a case-by-case determination  | 
| 17 |  |  of an emission
limitation or other standard, or a  | 
| 18 |  |  source-specific determination of ambient
impacts,  | 
| 19 |  |  or a visibility or increment analysis;
 | 
| 20 |  |     D. Do not seek to establish or change a permit  | 
| 21 |  |  term or condition
for which there is no  | 
| 22 |  |  corresponding underlying requirement and which  | 
| 23 |  |  avoids an
applicable requirement to which the  | 
| 24 |  |  source would otherwise be subject. Such
terms and  | 
| 25 |  |  conditions include:
 | 
     | 
 |  | HB3341 | - 64 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |      1. A federally enforceable emissions cap  | 
| 2 |  |  assumed to avoid
classification as a  | 
| 3 |  |  modification under any provision of Title I of  | 
| 4 |  |  the Clean
Air Act; and
 | 
| 5 |  |      2. An alternative emissions limit approved  | 
| 6 |  |  pursuant to regulations
promulgated under  | 
| 7 |  |  Section 112(i)(5) of the Clean Air Act;
 | 
| 8 |  |     E. Are not modifications under any provision  | 
| 9 |  |  of Title I of the Clean
Air Act; and
 | 
| 10 |  |     F. Are not required to be processed as a  | 
| 11 |  |  significant modification.
 | 
| 12 |  |    ii. Notwithstanding subparagraph(i) of paragraph  | 
| 13 |  |  (a) and subparagraph(ii) of paragraph (b) of this  | 
| 14 |  |  subsection,
minor permit modification procedures may  | 
| 15 |  |  be used for permit modifications
involving the use of  | 
| 16 |  |  economic incentives, marketable permits, emissions
 | 
| 17 |  |  trading, and other similar approaches, to the extent  | 
| 18 |  |  that such minor permit
modification procedures are  | 
| 19 |  |  explicitly provided for in an applicable
 | 
| 20 |  |  implementation plan or in applicable requirements  | 
| 21 |  |  promulgated by USEPA.
 | 
| 22 |  |    iii. An applicant requesting the use of minor  | 
| 23 |  |  permit modification
procedures shall meet the  | 
| 24 |  |  requirements of subsection 5 of this Section and
shall  | 
| 25 |  |  include the following in its application:
 | 
| 26 |  |     A. A description of the change, the emissions  | 
     | 
 |  | HB3341 | - 65 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  resulting from the
change,
and any new applicable  | 
| 2 |  |  requirements that will apply if the change occurs;
 | 
| 3 |  |     B. The source's suggested draft permit;
 | 
| 4 |  |     C. Certification by a responsible official,  | 
| 5 |  |  consistent with
paragraph(e) of subsection 5 of  | 
| 6 |  |  this Section and applicable regulations, that the  | 
| 7 |  |  proposed
modification meets the criteria for use  | 
| 8 |  |  of minor permit modification
procedures and a  | 
| 9 |  |  request that such procedures be used; and
 | 
| 10 |  |     D. Completed forms for the Agency to use to  | 
| 11 |  |  notify USEPA and affected
States as required under  | 
| 12 |  |  subsections 8 and 9 of this Section.
 | 
| 13 |  |    iv. Within 5 working days after receipt of a  | 
| 14 |  |  complete permit modification
application, the Agency  | 
| 15 |  |  shall notify USEPA and affected States of the
requested  | 
| 16 |  |  permit modification in accordance with subsections 8  | 
| 17 |  |  and 9 of
this Section. The Agency promptly shall send  | 
| 18 |  |  any notice required under
paragraph(d) of subsection 8  | 
| 19 |  |  of this Section to USEPA.
 | 
| 20 |  |    v. The Agency may not issue a final permit  | 
| 21 |  |  modification until after the
45-day review period for  | 
| 22 |  |  USEPA or until USEPA has notified the Agency that
USEPA  | 
| 23 |  |  will not object to the issuance of the permit  | 
| 24 |  |  modification, whichever
comes first, although the  | 
| 25 |  |  Agency can approve the permit modification prior to
 | 
| 26 |  |  that time. Within 90 days after the Agency's receipt of  | 
     | 
 |  | HB3341 | - 66 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  an application under the
minor permit modification  | 
| 2 |  |  procedures or 15 days after the end of USEPA's 45-day
 | 
| 3 |  |  review period under subsection 9 of this Section,  | 
| 4 |  |  whichever is later, the
Agency shall:
 | 
| 5 |  |     A. Issue the permit modification as proposed;
 | 
| 6 |  |     B. Deny the permit modification application;
 | 
| 7 |  |     C. Determine that the requested modification  | 
| 8 |  |  does not meet the minor
permit modification  | 
| 9 |  |  criteria and should be reviewed under the  | 
| 10 |  |  significant
modification procedures; or
 | 
| 11 |  |     D. Revise the draft permit modification and  | 
| 12 |  |  transmit to USEPA the new
proposed permit  | 
| 13 |  |  modification as required by subsection 9 of this  | 
| 14 |  |  Section.
 | 
| 15 |  |    vi. Any CAAPP source may make the change proposed  | 
| 16 |  |  in its minor permit
modification application  | 
| 17 |  |  immediately after it files such application. After
the  | 
| 18 |  |  CAAPP source makes the change allowed by the preceding  | 
| 19 |  |  sentence, and
until the Agency takes any of the actions  | 
| 20 |  |  specified in items(A) through(C) of subparagraph (v)  | 
| 21 |  |  of paragraph (a) of this subsection, the source must  | 
| 22 |  |  comply with
both the applicable requirements governing  | 
| 23 |  |  the change and the proposed
permit terms and  | 
| 24 |  |  conditions. During this time period, the source need  | 
| 25 |  |  not
comply with the existing permit terms and  | 
| 26 |  |  conditions it seeks to modify.
If the source fails to  | 
     | 
 |  | HB3341 | - 67 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  comply with its proposed permit terms and conditions
 | 
| 2 |  |  during this time period, the existing permit terms and  | 
| 3 |  |  conditions which it
seeks to modify may be enforced  | 
| 4 |  |  against it.
 | 
| 5 |  |    vii. The permit shield under paragraph (j) of  | 
| 6 |  |  subsection 7 of this Section may not
extend to minor  | 
| 7 |  |  permit modifications.
 | 
| 8 |  |    viii. If a construction permit is required,  | 
| 9 |  |  pursuant to subsection (a) of Section 39 of
this Act  | 
| 10 |  |  and regulations thereunder, for a change for which the  | 
| 11 |  |  minor
permit modification procedures are applicable,  | 
| 12 |  |  the source may request that
the processing of the  | 
| 13 |  |  construction permit application be consolidated with
 | 
| 14 |  |  the processing of the application for the minor permit  | 
| 15 |  |  modification. In
such cases, the provisions of this  | 
| 16 |  |  Section, including those within
subsections 5, 8, and  | 
| 17 |  |  9, shall apply and the Agency shall act on such
 | 
| 18 |  |  applications pursuant to subparagraph(v) of paragraph  | 
| 19 |  |  (a) of subsection 14 of this Section. The source may  | 
| 20 |  |  make the
proposed change immediately after filing its  | 
| 21 |  |  application for the minor
permit modification. Nothing  | 
| 22 |  |  in this subparagraph shall otherwise affect
the  | 
| 23 |  |  requirements and procedures applicable to construction  | 
| 24 |  |  permits.
 | 
| 25 |  |   b. Group Processing of Minor Permit Modifications.
 | 
| 26 |  |    i. Where requested by an applicant within its  | 
     | 
 |  | HB3341 | - 68 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  application, the
Agency shall process groups of a  | 
| 2 |  |  source's applications for certain
modifications  | 
| 3 |  |  eligible for minor permit modification processing in
 | 
| 4 |  |  accordance with the provisions of this paragraph (b).
 | 
| 5 |  |    ii. Permit modifications may be processed in  | 
| 6 |  |  accordance with the
procedures for group processing,  | 
| 7 |  |  for those modifications:
 | 
| 8 |  |     A. Which meet the criteria for minor permit  | 
| 9 |  |  modification procedures
under subparagraph(i) of  | 
| 10 |  |  paragraph (a) of subsection 14 of this Section; and
 | 
| 11 |  |     B. That collectively are below 10 percent of  | 
| 12 |  |  the emissions allowed by
the permit for the  | 
| 13 |  |  emissions unit for which change is requested, 20  | 
| 14 |  |  percent
of the applicable definition of major  | 
| 15 |  |  source set forth in subsection 2 of
this Section,  | 
| 16 |  |  or 5 tons per year, whichever is least.
 | 
| 17 |  |    iii. An applicant requesting the use of group  | 
| 18 |  |  processing procedures
shall
meet the requirements of  | 
| 19 |  |  subsection 5 of this Section and shall include the
 | 
| 20 |  |  following in its application:
 | 
| 21 |  |     A. A description of the change, the emissions  | 
| 22 |  |  resulting from the
change, and any new applicable  | 
| 23 |  |  requirements that will apply if the change
occurs.
 | 
| 24 |  |     B. The source's suggested draft permit.
 | 
| 25 |  |     C. Certification by a responsible official  | 
| 26 |  |  consistent with paragraph
(e) of subsection 5 of  | 
     | 
 |  | HB3341 | - 69 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  this Section, that the proposed modification meets  | 
| 2 |  |  the criteria for
use of group processing  | 
| 3 |  |  procedures and a request that such procedures be  | 
| 4 |  |  used.
 | 
| 5 |  |     D. A list of the source's other pending  | 
| 6 |  |  applications awaiting group
processing, and a  | 
| 7 |  |  determination of whether the requested  | 
| 8 |  |  modification,
aggregated with these other  | 
| 9 |  |  applications, equals or exceeds the threshold
set  | 
| 10 |  |  under item(B) of subparagraph (ii) of paragraph  | 
| 11 |  |  (b) of this subsection.
 | 
| 12 |  |     E. Certification, consistent with paragraph(e)  | 
| 13 |  |  of subsection 5 of this Section, that the source  | 
| 14 |  |  has
notified USEPA of the proposed modification.  | 
| 15 |  |  Such notification need only
contain a brief  | 
| 16 |  |  description of the requested modification.
 | 
| 17 |  |     F. Completed forms for the Agency to use to  | 
| 18 |  |  notify USEPA and affected
states as required under  | 
| 19 |  |  subsections 8 and 9 of this Section.
 | 
| 20 |  |    iv. On a quarterly basis or within 5 business days  | 
| 21 |  |  after receipt of an
application demonstrating that the  | 
| 22 |  |  aggregate of a source's pending
applications equals or  | 
| 23 |  |  exceeds the threshold level set forth within item
(B)  | 
| 24 |  |  of subparagraph (ii) of paragraph (b) of this  | 
| 25 |  |  subsection, whichever is earlier, the
Agency shall  | 
| 26 |  |  promptly notify USEPA and affected States of the  | 
     | 
 |  | HB3341 | - 70 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  requested
permit modifications in accordance with  | 
| 2 |  |  subsections 8 and 9 of this
Section. The Agency shall  | 
| 3 |  |  send any notice required under paragraph(d) of  | 
| 4 |  |  subsection 8 of
this Section to USEPA.
 | 
| 5 |  |    v. The provisions of subparagraph(v) of paragraph  | 
| 6 |  |  (a) of this subsection shall apply
to modifications  | 
| 7 |  |  eligible for group processing, except that the Agency
 | 
| 8 |  |  shall take one of the actions specified in items(A)  | 
| 9 |  |  through
(D) of subparagraph (v) of paragraph (a) of  | 
| 10 |  |  this subsection within 180 days after receipt of the  | 
| 11 |  |  application
or 15 days after the end of USEPA's 45-day  | 
| 12 |  |  review period under subsection 9
of this Section,  | 
| 13 |  |  whichever is later.
 | 
| 14 |  |    vi. The provisions of subparagraph(vi) of  | 
| 15 |  |  paragraph (a) of this subsection shall
apply to  | 
| 16 |  |  modifications for group processing.
 | 
| 17 |  |    vii. The provisions of paragraph(j) of subsection  | 
| 18 |  |  7 of this Section shall not
apply to
modifications  | 
| 19 |  |  eligible for group processing.
 | 
| 20 |  |   c. Significant Permit Modifications.
 | 
| 21 |  |    i. Significant modification procedures shall be  | 
| 22 |  |  used for applications
requesting significant permit  | 
| 23 |  |  modifications and for those applications that do
not  | 
| 24 |  |  qualify as either minor permit modifications or as  | 
| 25 |  |  administrative permit
amendments.
 | 
| 26 |  |    ii. Every significant change in existing  | 
     | 
 |  | HB3341 | - 71 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  monitoring permit terms or
conditions and every  | 
| 2 |  |  relaxation of reporting or recordkeeping requirements
 | 
| 3 |  |  shall be considered significant. A modification shall  | 
| 4 |  |  also be considered
significant if in the judgment of  | 
| 5 |  |  the Agency action on an application for
modification  | 
| 6 |  |  would require decisions to be made on technically  | 
| 7 |  |  complex issues.
Nothing herein shall be construed to  | 
| 8 |  |  preclude the permittee from making changes
consistent  | 
| 9 |  |  with this Section that would render existing permit  | 
| 10 |  |  compliance terms
and conditions irrelevant.
 | 
| 11 |  |    iii. Significant permit modifications must meet  | 
| 12 |  |  all the requirements of
this Section, including those  | 
| 13 |  |  for applications (including completeness review),
 | 
| 14 |  |  public participation, review by affected States, and  | 
| 15 |  |  review by USEPA applicable
to initial permit issuance  | 
| 16 |  |  and permit renewal. The Agency shall take final
action  | 
| 17 |  |  on significant permit modifications within 9 months  | 
| 18 |  |  after receipt of a
complete application.
 | 
| 19 |  |   d. The Agency shall have the authority to adopt  | 
| 20 |  |  procedural rules, in
accordance with the Illinois  | 
| 21 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 22 |  |  necessary, to implement this subsection. 
 | 
| 23 |  |  15. Reopenings for Cause by the Agency.
 | 
| 24 |  |   a. Each issued CAAPP permit shall include provisions  | 
| 25 |  |  specifying the
conditions under which the permit will be  | 
     | 
 |  | HB3341 | - 72 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  reopened prior to the expiration of
the permit. Such  | 
| 2 |  |  revisions shall be made as expeditiously as practicable. A
 | 
| 3 |  |  CAAPP permit shall be reopened and revised under any of the  | 
| 4 |  |  following
circumstances, in accordance with procedures  | 
| 5 |  |  adopted by the Agency:
 | 
| 6 |  |    i. Additional requirements under the Clean Air Act  | 
| 7 |  |  become applicable to
a major CAAPP source for which 3  | 
| 8 |  |  or more years remain on the original term of
the  | 
| 9 |  |  permit. Such a reopening shall be completed not later  | 
| 10 |  |  than 18 months after
the promulgation of the applicable  | 
| 11 |  |  requirement. No such revision is required
if the  | 
| 12 |  |  effective date of the requirement is later than the  | 
| 13 |  |  date on which the
permit is due to expire.
 | 
| 14 |  |    ii. Additional requirements (including excess  | 
| 15 |  |  emissions requirements)
become applicable to an  | 
| 16 |  |  affected source for acid deposition under the acid rain
 | 
| 17 |  |  program. Excess emissions offset plans shall be deemed  | 
| 18 |  |  to be incorporated into
the permit upon approval by  | 
| 19 |  |  USEPA.
 | 
| 20 |  |    iii. The Agency or USEPA determines that the permit  | 
| 21 |  |  contains a material
mistake or that inaccurate  | 
| 22 |  |  statements were made in establishing the emissions
 | 
| 23 |  |  standards, limitations, or other terms or conditions  | 
| 24 |  |  of the permit.
 | 
| 25 |  |    iv. The Agency or USEPA determines that the permit  | 
| 26 |  |  must be revised or
revoked to assure compliance with  | 
     | 
 |  | HB3341 | - 73 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  the applicable requirements.
 | 
| 2 |  |   b. In the event that the Agency determines that there  | 
| 3 |  |  are grounds for
revoking a CAAPP permit, for cause,  | 
| 4 |  |  consistent with paragraph a of this
subsection, it shall  | 
| 5 |  |  file a petition before the Board
setting forth the basis  | 
| 6 |  |  for such revocation. In any such proceeding, the
Agency  | 
| 7 |  |  shall have the burden of establishing that the permit  | 
| 8 |  |  should be
revoked under the standards set forth in this Act  | 
| 9 |  |  and the Clean Air Act.
Any such proceeding shall be  | 
| 10 |  |  conducted pursuant to the Board's procedures
for  | 
| 11 |  |  adjudicatory hearings and the Board shall render its  | 
| 12 |  |  decision within
120 days of the filing of the petition. The  | 
| 13 |  |  Agency shall take final action to
revoke and reissue a  | 
| 14 |  |  CAAPP permit consistent with the Board's order.
 | 
| 15 |  |   c. Proceedings regarding a reopened CAAPP permit shall  | 
| 16 |  |  follow the same
procedures as apply to initial permit  | 
| 17 |  |  issuance and shall affect only those
parts of the permit  | 
| 18 |  |  for which cause to reopen exists.
 | 
| 19 |  |   d. Reopenings under paragraph (a) of this subsection  | 
| 20 |  |  shall not be
initiated before a notice of such intent is  | 
| 21 |  |  provided to the CAAPP source by the
Agency at least 30 days  | 
| 22 |  |  in advance of the date that the permit is to be
reopened,  | 
| 23 |  |  except that the Agency may provide a shorter time period in  | 
| 24 |  |  the case
of an emergency.
 | 
| 25 |  |   e. The Agency shall have the authority to adopt  | 
| 26 |  |  procedural rules, in
accordance with the Illinois  | 
     | 
 |  | HB3341 | - 74 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 2 |  |  necessary, to implement this subsection.
 | 
| 3 |  |  16. Reopenings for Cause by USEPA.
 | 
| 4 |  |   a. When USEPA finds that cause exists to terminate,  | 
| 5 |  |  modify, or revoke and
reissue a CAAPP permit pursuant to  | 
| 6 |  |  subsection 15 of this Section, and
thereafter notifies the  | 
| 7 |  |  Agency and the permittee of such finding in writing,
the  | 
| 8 |  |  Agency shall forward to USEPA and the permittee a proposed  | 
| 9 |  |  determination of
termination, modification, or revocation  | 
| 10 |  |  and reissuance as appropriate, in
accordance with  | 
| 11 |  |  paragraph (b) of this subsection. The Agency's proposed
 | 
| 12 |  |  determination shall be in accordance with the record, the  | 
| 13 |  |  Clean Air Act,
regulations promulgated thereunder, this  | 
| 14 |  |  Act and regulations promulgated
thereunder. Such proposed  | 
| 15 |  |  determination shall not affect the permit or
constitute a  | 
| 16 |  |  final permit action for purposes of this Act or the  | 
| 17 |  |  Administrative
Review Law. The Agency shall forward to  | 
| 18 |  |  USEPA such proposed determination
within 90 days after  | 
| 19 |  |  receipt of the notification from USEPA. If additional time
 | 
| 20 |  |  is necessary to submit the proposed determination, the  | 
| 21 |  |  Agency shall request a
90-day extension from USEPA and  | 
| 22 |  |  shall submit the proposed determination within
180 days  | 
| 23 |  |  after receipt of notification from USEPA.
 | 
| 24 |  |    b. i. Prior to the Agency's submittal to USEPA of a  | 
| 25 |  |  proposed
determination to terminate or revoke and  | 
     | 
 |  | HB3341 | - 75 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  reissue the permit, the Agency shall
file a petition  | 
| 2 |  |  before the Board setting forth USEPA's objection, the  | 
| 3 |  |  permit
record, the Agency's proposed determination,  | 
| 4 |  |  and the justification for its
proposed determination.  | 
| 5 |  |  The Board shall conduct a hearing pursuant to the rules
 | 
| 6 |  |  prescribed by Section 32 of this Act, and the burden of  | 
| 7 |  |  proof shall be on the
Agency.
 | 
| 8 |  |    ii. After due consideration of the written and oral  | 
| 9 |  |  statements, the
testimony and arguments that shall be  | 
| 10 |  |  submitted at hearing, the Board shall
issue and enter  | 
| 11 |  |  an interim order for the proposed determination, which  | 
| 12 |  |  shall
set forth all changes, if any, required in the  | 
| 13 |  |  Agency's proposed determination.
The interim order  | 
| 14 |  |  shall comply with the requirements for final orders as  | 
| 15 |  |  set
forth in Section 33 of this Act. Issuance of an  | 
| 16 |  |  interim order by the Board
under this paragraph,  | 
| 17 |  |  however, shall not affect the permit status and does  | 
| 18 |  |  not
constitute a final action for purposes of this Act  | 
| 19 |  |  or the Administrative Review
Law.
 | 
| 20 |  |    iii. The Board shall cause a copy of its interim  | 
| 21 |  |  order to be served upon
all parties to the proceeding  | 
| 22 |  |  as well as upon USEPA. The Agency shall submit
the  | 
| 23 |  |  proposed determination to USEPA in accordance with the  | 
| 24 |  |  Board's Interim
Order within 180 days after receipt of  | 
| 25 |  |  the notification from USEPA.
 | 
| 26 |  |   c. USEPA shall review the proposed determination to  | 
     | 
 |  | HB3341 | - 76 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  terminate,
modify, or revoke and reissue the permit within  | 
| 2 |  |  90 days after receipt.
 | 
| 3 |  |    i. When USEPA reviews the proposed determination  | 
| 4 |  |  to terminate or revoke
and reissue and does not object,  | 
| 5 |  |  the Board shall, within 7 days after receipt of
USEPA's  | 
| 6 |  |  final approval, enter the interim order as a final  | 
| 7 |  |  order. The final
order may be appealed as provided by  | 
| 8 |  |  Title XI of this Act. The Agency shall
take final  | 
| 9 |  |  action in accordance with the Board's final order.
 | 
| 10 |  |    ii. When USEPA reviews such proposed determination
 | 
| 11 |  |  to terminate or revoke and reissue and objects, the  | 
| 12 |  |  Agency shall submit
USEPA's objection and the Agency's  | 
| 13 |  |  comments and recommendation on the objection
to the  | 
| 14 |  |  Board and permittee. The Board shall review its interim  | 
| 15 |  |  order in
response to USEPA's objection and the Agency's  | 
| 16 |  |  comments and recommendation and
issue a final order in  | 
| 17 |  |  accordance with Sections 32 and 33 of this Act. The
 | 
| 18 |  |  Agency shall, within 90 days after receipt of such  | 
| 19 |  |  objection, respond to
USEPA's objection in accordance  | 
| 20 |  |  with the Board's final order.
 | 
| 21 |  |    iii. When USEPA reviews such proposed  | 
| 22 |  |  determination to modify and
objects, the Agency shall,  | 
| 23 |  |  within 90 days after receipt of the objection,
resolve  | 
| 24 |  |  the objection and modify the permit in accordance with  | 
| 25 |  |  USEPA's
objection, based upon the record, the Clean Air  | 
| 26 |  |  Act, regulations promulgated
thereunder, this Act, and  | 
     | 
 |  | HB3341 | - 77 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  regulations promulgated thereunder.
 | 
| 2 |  |   d. If the Agency fails to submit the proposed  | 
| 3 |  |  determination pursuant to
paragraph a of this subsection or  | 
| 4 |  |  fails to resolve any USEPA objection
pursuant to paragraph  | 
| 5 |  |  c of this subsection, USEPA will terminate, modify, or
 | 
| 6 |  |  revoke and reissue the permit.
 | 
| 7 |  |   e. The Agency shall have the authority to adopt  | 
| 8 |  |  procedural rules, in
accordance with the Illinois  | 
| 9 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 10 |  |  necessary, to implement this subsection.
 | 
| 11 |  |  17. Title IV; Acid Rain Provisions.
 | 
| 12 |  |   a. The Agency shall act on initial CAAPP applications  | 
| 13 |  |  for affected
sources for acid deposition in accordance with  | 
| 14 |  |  this Section and Title V of
the Clean Air Act and  | 
| 15 |  |  regulations promulgated thereunder, except as
modified by  | 
| 16 |  |  Title IV of the Clean Air Act and regulations promulgated
 | 
| 17 |  |  thereunder. The Agency shall issue initial CAAPP permits to  | 
| 18 |  |  the affected
sources for acid deposition which shall become  | 
| 19 |  |  effective no earlier than
January 1, 1995, and which shall  | 
| 20 |  |  terminate on December 31, 1999, in
accordance with this  | 
| 21 |  |  Section. Subsequent CAAPP permits issued to affected
 | 
| 22 |  |  sources for acid deposition shall be issued for a fixed  | 
| 23 |  |  term of 5 years.
Title IV of the Clean Air Act and  | 
| 24 |  |  regulations promulgated thereunder,
including but not  | 
| 25 |  |  limited to 40 C.F.R. Part 72, as now or hereafter amended,
 | 
     | 
 |  | HB3341 | - 78 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  are
applicable to and enforceable under this Act.
 | 
| 2 |  |   b. A designated representative of an affected source  | 
| 3 |  |  for acid deposition
shall submit a timely and complete  | 
| 4 |  |  Phase II acid rain permit application and
compliance plan  | 
| 5 |  |  to the Agency, not later than January 1, 1996, that meets  | 
| 6 |  |  the
requirements of Titles IV and V of the Clean Air Act  | 
| 7 |  |  and regulations. The
Agency shall act on the Phase II acid  | 
| 8 |  |  rain permit application and compliance
plan in accordance  | 
| 9 |  |  with this Section and Title V of the Clean Air Act and
 | 
| 10 |  |  regulations promulgated thereunder, except as modified by  | 
| 11 |  |  Title IV of the Clean
Air Act and regulations promulgated  | 
| 12 |  |  thereunder. The Agency shall issue the
Phase II acid rain  | 
| 13 |  |  permit to an affected source for acid deposition no later
 | 
| 14 |  |  than December 31, 1997, which shall become effective on  | 
| 15 |  |  January 1, 2000, in
accordance with this Section, except as  | 
| 16 |  |  modified by Title IV and regulations
promulgated  | 
| 17 |  |  thereunder; provided that the designated representative of  | 
| 18 |  |  the
source submitted a timely and complete Phase II permit  | 
| 19 |  |  application and
compliance plan to the Agency that meets  | 
| 20 |  |  the requirements of Title IV and V of
the Clean Air Act and  | 
| 21 |  |  regulations.
 | 
| 22 |  |   c. Each Phase II acid rain permit issued in accordance  | 
| 23 |  |  with this
subsection shall have a fixed term of 5 years.  | 
| 24 |  |  Except as provided in paragraph
b above, the Agency shall  | 
| 25 |  |  issue or deny a Phase II acid rain permit within 18
months  | 
| 26 |  |  of receiving a complete Phase II permit application and  | 
     | 
 |  | HB3341 | - 79 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  compliance plan.
 | 
| 2 |  |   d. A designated representative of a new unit, as  | 
| 3 |  |  defined in Section 402 of
the Clean Air Act, shall submit a  | 
| 4 |  |  timely and complete Phase II acid rain permit
application  | 
| 5 |  |  and compliance plan that meets the requirements of Titles  | 
| 6 |  |  IV and V
of the Clean Air Act and its regulations. The  | 
| 7 |  |  Agency shall act on the new
unit's Phase II acid rain  | 
| 8 |  |  permit application and compliance plan in accordance
with  | 
| 9 |  |  this Section and Title V of the Clean Air Act and its  | 
| 10 |  |  regulations, except
as modified by Title IV of the Clean  | 
| 11 |  |  Air Act and its regulations. The Agency
shall reopen the  | 
| 12 |  |  new unit's CAAPP permit for cause to incorporate the  | 
| 13 |  |  approved
Phase II acid rain permit in accordance with this  | 
| 14 |  |  Section. The Phase II acid
rain permit for the new unit  | 
| 15 |  |  shall become effective no later than the date
required  | 
| 16 |  |  under Title IV of the Clean Air Act and its regulations.
 | 
| 17 |  |   e. A designated representative of an affected source  | 
| 18 |  |  for acid deposition
shall submit a timely and complete  | 
| 19 |  |  Title IV NOx permit application to the
Agency, not later  | 
| 20 |  |  than January 1, 1998, that meets the requirements of Titles
 | 
| 21 |  |  IV and V of the Clean Air Act and its regulations. The  | 
| 22 |  |  Agency shall reopen the
Phase II acid rain permit for cause  | 
| 23 |  |  and incorporate the approved NOx provisions
into the Phase  | 
| 24 |  |  II acid rain permit not later than January 1, 1999, in
 | 
| 25 |  |  accordance with this Section, except as modified by Title  | 
| 26 |  |  IV of the Clean Air
Act and regulations promulgated  | 
     | 
 |  | HB3341 | - 80 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  thereunder. Such reopening shall not affect the
term of the  | 
| 2 |  |  Phase II acid rain permit.
 | 
| 3 |  |   f. The designated representative of the affected  | 
| 4 |  |  source for acid
deposition shall renew the initial CAAPP  | 
| 5 |  |  permit and Phase II acid rain permit
in accordance with  | 
| 6 |  |  this Section and Title V of the Clean Air Act and
 | 
| 7 |  |  regulations promulgated thereunder, except as modified by  | 
| 8 |  |  Title IV of the Clean
Air Act and regulations promulgated  | 
| 9 |  |  thereunder.
 | 
| 10 |  |   g. In the case of an affected source for acid  | 
| 11 |  |  deposition for which a
complete Phase II acid rain permit  | 
| 12 |  |  application and compliance plan are timely
received under  | 
| 13 |  |  this subsection, the complete permit application and  | 
| 14 |  |  compliance
plan, including amendments thereto, shall be  | 
| 15 |  |  binding on the owner, operator and
designated  | 
| 16 |  |  representative, all affected units for acid deposition at  | 
| 17 |  |  the
affected source, and any other unit, as defined in  | 
| 18 |  |  Section 402 of the Clean Air
Act, governed by the Phase II  | 
| 19 |  |  acid rain permit application and shall be
enforceable as an  | 
| 20 |  |  acid rain permit for purposes of Titles IV and V of the  | 
| 21 |  |  Clean
Air Act, from the date of submission of the acid rain  | 
| 22 |  |  permit application until
a Phase II acid rain permit is  | 
| 23 |  |  issued or denied by the Agency.
 | 
| 24 |  |   h. The Agency shall not include or implement any  | 
| 25 |  |  measure which would
interfere with or modify the  | 
| 26 |  |  requirements of Title IV of the Clean Air Act
or  | 
     | 
 |  | HB3341 | - 81 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  regulations promulgated thereunder.
 | 
| 2 |  |   i. Nothing in this Section shall be construed as  | 
| 3 |  |  affecting allowances or
USEPA's decision regarding an  | 
| 4 |  |  excess emissions offset plan, as set forth in
Title IV of  | 
| 5 |  |  the Clean Air Act or regulations promulgated thereunder.
 | 
| 6 |  |    i. No permit revision shall be required for  | 
| 7 |  |  increases in emissions that
are authorized by  | 
| 8 |  |  allowances acquired pursuant to the acid rain program,
 | 
| 9 |  |  provided that such increases do not require a permit  | 
| 10 |  |  revision under any other
applicable requirement.
 | 
| 11 |  |    ii. No limit shall be placed on the number of  | 
| 12 |  |  allowances held by the
source. The source may not,  | 
| 13 |  |  however, use allowances as a defense to
noncompliance  | 
| 14 |  |  with any other applicable requirement.
 | 
| 15 |  |    iii. Any such allowance shall be accounted for  | 
| 16 |  |  according to the
procedures established in regulations  | 
| 17 |  |  promulgated under Title IV of the Clean
Air Act.
 | 
| 18 |  |   j. To the extent that the federal regulations  | 
| 19 |  |  promulgated under Title
IV,
including but not limited to 40  | 
| 20 |  |  C.F.R. Part 72, as now or hereafter amended,
are  | 
| 21 |  |  inconsistent with the federal regulations promulgated  | 
| 22 |  |  under Title V, the
federal regulations promulgated under  | 
| 23 |  |  Title IV shall take precedence.
 | 
| 24 |  |   k. The USEPA may intervene as a matter of right in any  | 
| 25 |  |  permit appeal
involving a Phase II acid rain permit  | 
| 26 |  |  provision or denial of a Phase II acid
rain permit.
 | 
     | 
 |  | HB3341 | - 82 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   l. It is unlawful for any owner or operator
to violate  | 
| 2 |  |  any terms or conditions of a Phase II acid rain permit
 | 
| 3 |  |  issued under this subsection, to operate any affected  | 
| 4 |  |  source for acid
deposition except in compliance with a  | 
| 5 |  |  Phase II acid rain permit issued by the
Agency under this  | 
| 6 |  |  subsection, or to violate any other applicable  | 
| 7 |  |  requirements.
 | 
| 8 |  |   m. The designated representative of an affected source  | 
| 9 |  |  for acid
deposition shall submit to the Agency the data and  | 
| 10 |  |  information submitted
quarterly to USEPA, pursuant to 40  | 
| 11 |  |  CFR 75.64, concurrently with the submission
to USEPA. The  | 
| 12 |  |  submission shall be in the same electronic format as  | 
| 13 |  |  specified by
USEPA.
 | 
| 14 |  |   n. The Agency shall act on any petition for exemption  | 
| 15 |  |  of a new unit or
retired unit, as those terms are defined  | 
| 16 |  |  in Section 402 of the Clean Air Act,
from the requirements  | 
| 17 |  |  of the acid rain program in accordance with Title IV of
the  | 
| 18 |  |  Clean Air Act and its regulations.
 | 
| 19 |  |   o. The Agency shall have the authority to adopt  | 
| 20 |  |  procedural rules, in
accordance with the Illinois  | 
| 21 |  |  Administrative Procedure Act, as the Agency
deems  | 
| 22 |  |  necessary to implement this subsection.
 | 
| 23 |  |  18. Fee Provisions.
 | 
| 24 |  |   a. A source subject to this Section or excluded under  | 
| 25 |  |  subsection 1.1 or paragraph (c) of subsection 3
of this  | 
     | 
 |  | HB3341 | - 83 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  Section, shall pay a fee as provided in this paragraph (a)  | 
| 2 |  |  of
subsection 18. However, a source that has been excluded  | 
| 3 |  |  from the provisions
of this Section under subsection 1.1 or  | 
| 4 |  |  under paragraph (c) of subsection 3 of this Section
because  | 
| 5 |  |  the source emits less than 25 tons per year of any  | 
| 6 |  |  combination of
regulated air pollutants, except greenhouse  | 
| 7 |  |  gases, shall pay fees in accordance with paragraph (1) of
 | 
| 8 |  |  subsection (b) of Section 9.6.
 | 
| 9 |  |    i. The fee for a source allowed to emit less than  | 
| 10 |  |  100 tons per year
of any combination of regulated air  | 
| 11 |  |  pollutants, except greenhouse gases, shall be $1,800
 | 
| 12 |  |  per year, and that fee shall increase, beginning  | 
| 13 |  |  January 1, 2012, to $2,150 per year.
 | 
| 14 |  |    ii. The fee for a source allowed to emit 100 tons  | 
| 15 |  |  or more per year of
any combination of regulated air  | 
| 16 |  |  pollutants, except greenhouse gases and those  | 
| 17 |  |  regulated air
pollutants excluded in paragraph(f) of  | 
| 18 |  |  this subsection 18, shall be as follows:
 | 
| 19 |  |     A. The Agency shall assess a fee of $18 per
 | 
| 20 |  |  ton, per year for
the allowable emissions of  | 
| 21 |  |  regulated air pollutants subject to this  | 
| 22 |  |  subparagraph (ii) of paragraph (a) of subsection  | 
| 23 |  |  18, and that fee shall increase, beginning January  | 
| 24 |  |  1, 2012, to $21.50 per ton, per year. These fees  | 
| 25 |  |  shall be used by the Agency and
the Board to
fund  | 
| 26 |  |  the activities required by Title V of the Clean Air  | 
     | 
 |  | HB3341 | - 84 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  Act including such
activities as may be carried out  | 
| 2 |  |  by other State or local agencies pursuant to
 | 
| 3 |  |  paragraph
(d) of this subsection. The amount of  | 
| 4 |  |  such fee shall be based on
the
information supplied  | 
| 5 |  |  by the applicant in its complete CAAPP permit
 | 
| 6 |  |  application or in the CAAPP permit if the permit  | 
| 7 |  |  has been granted and shall be
determined by the  | 
| 8 |  |  amount of emissions that the source is allowed to  | 
| 9 |  |  emit
annually, provided however, that the maximum  | 
| 10 |  |  fee for a CAAPP permit under this subparagraph (ii)  | 
| 11 |  |  of paragraph (a) of subsection 18 is $250,000, and  | 
| 12 |  |  increases, beginning January 1, 2012, to $294,000.  | 
| 13 |  |  Beginning January 1, 2012, the maximum fee under  | 
| 14 |  |  this subparagraph (ii) of paragraph (a) of  | 
| 15 |  |  subsection 18 for a source that has been excluded  | 
| 16 |  |  under subsection 1.1 of this Section or under  | 
| 17 |  |  paragraph (c) of subsection 3 of this Section is  | 
| 18 |  |  $4,112. The Agency shall provide as part
of the  | 
| 19 |  |  permit
application form required under subsection  | 
| 20 |  |  5 of this Section a separate fee
calculation form  | 
| 21 |  |  which will allow the applicant to identify the  | 
| 22 |  |  allowable
emissions and calculate the fee. In no  | 
| 23 |  |  event
shall the Agency raise the amount of  | 
| 24 |  |  allowable emissions requested by the
applicant  | 
| 25 |  |  unless such increases are required to demonstrate  | 
| 26 |  |  compliance with
terms of a CAAPP permit.
 | 
     | 
 |  | HB3341 | - 85 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |     Notwithstanding the above, any applicant may  | 
| 2 |  |  seek a change in its
permit which would result in  | 
| 3 |  |  increases in allowable emissions due to an
 | 
| 4 |  |  increase in the hours of operation or production  | 
| 5 |  |  rates of an emission unit
or units and such a  | 
| 6 |  |  change shall be consistent with the
construction  | 
| 7 |  |  permit requirements of the existing State permit  | 
| 8 |  |  program, under subsection (a) of
Section 39 of this  | 
| 9 |  |  Act and applicable provisions of this Section.  | 
| 10 |  |  Where a
construction permit is required, the  | 
| 11 |  |  Agency shall expeditiously grant such
construction  | 
| 12 |  |  permit and shall, if necessary, modify the CAAPP  | 
| 13 |  |  permit based on
the same application.
 | 
| 14 |  |     B. The applicant or
permittee may pay the fee  | 
| 15 |  |  annually or semiannually for those fees
greater  | 
| 16 |  |  than $5,000.
However, any applicant paying a fee  | 
| 17 |  |  equal to or greater than $100,000 shall
pay the  | 
| 18 |  |  full amount on July 1, for the subsequent fiscal  | 
| 19 |  |  year, or pay 50% of
the fee on July 1 and the  | 
| 20 |  |  remaining 50% by the next January 1. The Agency may
 | 
| 21 |  |  change any annual billing date upon reasonable  | 
| 22 |  |  notice, but shall prorate the
new bill so that the  | 
| 23 |  |  permittee or applicant does not pay more than its  | 
| 24 |  |  required
fees for the fee period for which payment  | 
| 25 |  |  is made.
 | 
| 26 |  |   b. (Blank).
 | 
     | 
 |  | HB3341 | - 86 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   c. (Blank).
 | 
| 2 |  |   d. There is hereby created in the State Treasury a  | 
| 3 |  |  special fund to be
known as the "CAA Permit Fund". All  | 
| 4 |  |  Funds collected by the Agency pursuant
to this subsection  | 
| 5 |  |  shall be deposited into the Fund. The General Assembly
 | 
| 6 |  |  shall appropriate monies from this Fund to the Agency and  | 
| 7 |  |  to the Board to
carry out their obligations under this  | 
| 8 |  |  Section. The General Assembly may
also authorize monies to  | 
| 9 |  |  be granted by the Agency from this Fund to other
State and  | 
| 10 |  |  local agencies which perform duties related to the CAAPP.
 | 
| 11 |  |  Interest generated on the monies deposited in this Fund  | 
| 12 |  |  shall be returned to
the Fund. 
 | 
| 13 |  |   e. The Agency shall have the authority to adopt  | 
| 14 |  |  procedural rules, in
accordance with the Illinois  | 
| 15 |  |  Administrative Procedure Act, as the Agency
deems  | 
| 16 |  |  necessary to implement this subsection.
 | 
| 17 |  |   f. For purposes of this subsection, the term "regulated  | 
| 18 |  |  air pollutant"
shall have the meaning given to it under  | 
| 19 |  |  subsection 1 of this Section but
shall exclude the  | 
| 20 |  |  following:
 | 
| 21 |  |    i. carbon monoxide;
 | 
| 22 |  |    ii. any Class I or II substance which is a  | 
| 23 |  |  regulated air pollutant
solely because it is listed  | 
| 24 |  |  pursuant to Section 602 of the Clean Air Act;
and
 | 
| 25 |  |    iii. any pollutant that is a regulated air  | 
| 26 |  |  pollutant solely because
it is subject to a standard or  | 
     | 
 |  | HB3341 | - 87 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  regulation under Section 112(r) of the Clean
Air Act  | 
| 2 |  |  based on the emissions allowed in the permit effective  | 
| 3 |  |  in that
calendar year, at the time the applicable bill  | 
| 4 |  |  is generated.
 | 
| 5 |  |  19. Air Toxics Provisions.
 | 
| 6 |  |   a. In the event that the USEPA fails to promulgate in a  | 
| 7 |  |  timely manner
a standard pursuant to Section 112(d) of the  | 
| 8 |  |  Clean Air Act, the Agency
shall have the authority to issue  | 
| 9 |  |  permits, pursuant to Section 112(j) of
the Clean Air Act  | 
| 10 |  |  and regulations promulgated thereunder, which contain
 | 
| 11 |  |  emission limitations which are equivalent to the emission  | 
| 12 |  |  limitations that
would apply to a source if an emission  | 
| 13 |  |  standard had been
promulgated in a timely manner by USEPA  | 
| 14 |  |  pursuant to Section 112(d).
Provided, however, that the  | 
| 15 |  |  owner or operator of a source shall have the
opportunity to  | 
| 16 |  |  submit to the Agency a proposed emission limitation which  | 
| 17 |  |  it
determines to be equivalent to the emission limitations  | 
| 18 |  |  that would apply to
such source if an emission standard had  | 
| 19 |  |  been promulgated in a timely manner
by USEPA. If the Agency  | 
| 20 |  |  refuses to include the emission limitation
proposed by the  | 
| 21 |  |  owner or operator in a CAAPP permit, the owner or operator
 | 
| 22 |  |  may petition the Board to establish whether the emission  | 
| 23 |  |  limitation
proposal submitted by the owner or operator  | 
| 24 |  |  provides for emission
limitations which are equivalent to  | 
| 25 |  |  the emission limitations that would
apply to the source if  | 
     | 
 |  | HB3341 | - 88 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  the emission standard had been promulgated by USEPA
in a  | 
| 2 |  |  timely manner. The Board shall determine whether the  | 
| 3 |  |  emission
limitation proposed by the owner or operator or an  | 
| 4 |  |  alternative emission
limitation proposed by the Agency  | 
| 5 |  |  provides for the level of control
required under Section  | 
| 6 |  |  112 of the Clean Air Act, or shall otherwise
establish an  | 
| 7 |  |  appropriate emission limitation, pursuant to Section 112  | 
| 8 |  |  of
the Clean Air Act.
 | 
| 9 |  |   b. Any Board proceeding brought under paragraph (a) or  | 
| 10 |  |  (e)
of this subsection shall be conducted according to the  | 
| 11 |  |  Board's
procedures for adjudicatory hearings and the Board  | 
| 12 |  |  shall render its
decision within 120 days of the filing of  | 
| 13 |  |  the petition. Any such decision
shall be subject to review  | 
| 14 |  |  pursuant to Section 41 of this Act. Where
USEPA promulgates  | 
| 15 |  |  an applicable emission standard prior to the issuance of
 | 
| 16 |  |  the CAAPP permit, the Agency shall include in the permit  | 
| 17 |  |  the promulgated
standard, provided that the source shall  | 
| 18 |  |  have the compliance period
provided under Section 112(i) of  | 
| 19 |  |  the Clean Air Act. Where USEPA promulgates an
applicable  | 
| 20 |  |  standard subsequent to the issuance of the CAAPP permit,  | 
| 21 |  |  the Agency
shall revise such permit upon the next renewal  | 
| 22 |  |  to reflect the promulgated
standard, providing a  | 
| 23 |  |  reasonable time for the applicable source to comply with
 | 
| 24 |  |  the standard, but no longer than 8 years after the date on  | 
| 25 |  |  which the source is
first required to comply with the  | 
| 26 |  |  emissions limitation established under this
subsection.
 | 
     | 
 |  | HB3341 | - 89 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   c. The Agency shall have the authority to implement and  | 
| 2 |  |  enforce complete
or partial emission standards promulgated  | 
| 3 |  |  by USEPA pursuant to Section 112(d),
and standards  | 
| 4 |  |  promulgated by USEPA pursuant to Sections 112(f), 112(h),  | 
| 5 |  |  112(m),
and 112(n), and may accept delegation of authority  | 
| 6 |  |  from USEPA to implement and
enforce Section 112(l) and  | 
| 7 |  |  requirements for the prevention and detection of
 | 
| 8 |  |  accidental releases pursuant to Section 112(r) of the Clean  | 
| 9 |  |  Air Act.
 | 
| 10 |  |   d. The Agency shall have the authority to issue permits  | 
| 11 |  |  pursuant to
Section 112(i)(5) of the Clean Air Act.
 | 
| 12 |  |   e. The Agency has the authority to implement Section  | 
| 13 |  |  112(g) of
the Clean Air Act consistent with the Clean Air  | 
| 14 |  |  Act and federal regulations
promulgated thereunder. If the  | 
| 15 |  |  Agency refuses to include the emission
limitations  | 
| 16 |  |  proposed in an application submitted by an owner or  | 
| 17 |  |  operator for a
case-by-case maximum achievable control  | 
| 18 |  |  technology (MACT) determination, the
owner or operator may  | 
| 19 |  |  petition the Board to determine whether the emission
 | 
| 20 |  |  limitation proposed by the owner or operator or an  | 
| 21 |  |  alternative emission
limitation proposed by the Agency  | 
| 22 |  |  provides for a level of control required by
Section 112 of  | 
| 23 |  |  the Clean Air Act, or to otherwise establish an appropriate
 | 
| 24 |  |  emission limitation under Section 112 of the Clean Air Act.
 | 
| 25 |  |  20. Small Business.
 | 
     | 
 |  | HB3341 | - 90 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |   a. For purposes of this subsection:
 | 
| 2 |  |   "Program" is the Small Business Stationary Source  | 
| 3 |  |  Technical and
Environmental Compliance Assistance Program  | 
| 4 |  |  created within this State pursuant
to Section 507 of the  | 
| 5 |  |  Clean Air Act and guidance promulgated thereunder, to
 | 
| 6 |  |  provide technical assistance and compliance information to  | 
| 7 |  |  small business
stationary sources;
 | 
| 8 |  |   "Small Business Assistance Program" is a component of  | 
| 9 |  |  the Program
responsible for providing sufficient  | 
| 10 |  |  communications with small businesses
through the  | 
| 11 |  |  collection and dissemination of information to small  | 
| 12 |  |  business
stationary sources; and
 | 
| 13 |  |   "Small Business Stationary Source" means a stationary  | 
| 14 |  |  source that:
 | 
| 15 |  |    1. is owned or operated by a person that employs  | 
| 16 |  |  100 or fewer
individuals;
 | 
| 17 |  |    2. is a small business concern as defined in the  | 
| 18 |  |  "Small Business Act";
 | 
| 19 |  |    3. is not a major source as that term is defined in  | 
| 20 |  |  subsection 2 of this
Section;
 | 
| 21 |  |    4. does not emit 50 tons or more per year of any  | 
| 22 |  |  regulated air
pollutant, except greenhouse gases; and
 | 
| 23 |  |    5. emits less than 75 tons per year of all  | 
| 24 |  |  regulated pollutants, except greenhouse gases.
 | 
| 25 |  |   b. The Agency shall adopt and submit to USEPA, after  | 
| 26 |  |  reasonable notice and
opportunity for public comment, as a  | 
     | 
 |  | HB3341 | - 91 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  revision to the Illinois state
implementation plan, plans  | 
| 2 |  |  for establishing the Program.
 | 
| 3 |  |   c. The Agency shall have the authority to enter into  | 
| 4 |  |  such contracts
and agreements as the Agency deems necessary  | 
| 5 |  |  to carry out the purposes of
this subsection.
 | 
| 6 |  |   d. The Agency may establish such procedures as it may  | 
| 7 |  |  deem necessary
for the purposes of implementing and  | 
| 8 |  |  executing its responsibilities under
this subsection.
 | 
| 9 |  |   e. There shall be appointed a Small Business Ombudsman  | 
| 10 |  |  (hereinafter in
this subsection referred to as  | 
| 11 |  |  "Ombudsman") to monitor the Small Business
Assistance  | 
| 12 |  |  Program. The Ombudsman shall be a nonpartisan designated  | 
| 13 |  |  official,
with the ability to independently assess whether  | 
| 14 |  |  the goals of the Program are
being met.
 | 
| 15 |  |   f. The State Ombudsman Office shall be located in an  | 
| 16 |  |  existing Ombudsman
office within the State or in any State  | 
| 17 |  |  Department.
 | 
| 18 |  |   g. There is hereby created a State Compliance Advisory  | 
| 19 |  |  Panel (hereinafter
in this subsection referred to as  | 
| 20 |  |  "Panel") for determining the overall
effectiveness of the  | 
| 21 |  |  Small Business Assistance Program within this State.
 | 
| 22 |  |   h. The selection of Panel members shall be by the  | 
| 23 |  |  following method:
 | 
| 24 |  |    1. The Governor shall select two members who are  | 
| 25 |  |  not owners or
representatives of owners of small  | 
| 26 |  |  business stationary sources to represent the
general  | 
     | 
 |  | HB3341 | - 92 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  public;
 | 
| 2 |  |    2. The Director of the Agency shall select one  | 
| 3 |  |  member to represent the
Agency; and
 | 
| 4 |  |    3. The State Legislature shall select four members  | 
| 5 |  |  who are owners or
representatives of owners of small  | 
| 6 |  |  business stationary sources. Both the
majority and  | 
| 7 |  |  minority leadership in both Houses of the Legislature  | 
| 8 |  |  shall
appoint one member of the panel.
 | 
| 9 |  |   i. Panel members should serve without compensation but  | 
| 10 |  |  will receive full
reimbursement for expenses including  | 
| 11 |  |  travel and per diem as authorized within
this State.
 | 
| 12 |  |   j. The Panel shall select its own Chair by a majority  | 
| 13 |  |  vote. The Chair may
meet and consult with the Ombudsman and  | 
| 14 |  |  the head of the Small Business
Assistance Program in  | 
| 15 |  |  planning the activities for the Panel.
 | 
| 16 |  |  21. Temporary Sources.
 | 
| 17 |  |   a. The Agency may issue a single permit authorizing  | 
| 18 |  |  emissions from similar
operations by the same source owner  | 
| 19 |  |  or operator at multiple temporary
locations, except for  | 
| 20 |  |  sources which are affected sources for acid deposition
 | 
| 21 |  |  under Title IV of the Clean Air Act.
 | 
| 22 |  |   b. The applicant must demonstrate that the operation is  | 
| 23 |  |  temporary and will
involve at least one change of location  | 
| 24 |  |  during the term of the permit.
 | 
| 25 |  |   c. Any such permit shall meet all applicable  | 
     | 
 |  | HB3341 | - 93 - | LRB099 10047 MGM 30270 b |  
  | 
| 
 | 
| 1 |  |  requirements of this Section
and applicable regulations,  | 
| 2 |  |  and include conditions assuring compliance with all
 | 
| 3 |  |  applicable requirements at all authorized locations and  | 
| 4 |  |  requirements that the
owner or operator notify the Agency  | 
| 5 |  |  at least 10 days in advance of each change
in location.
 | 
| 6 |  |  22. Solid Waste Incineration Units.
 | 
| 7 |  |   a. A CAAPP permit for a solid waste incineration unit  | 
| 8 |  |  combusting municipal
waste subject to standards  | 
| 9 |  |  promulgated under Section 129(e) of the Clean Air
Act shall  | 
| 10 |  |  be issued for a period of 12 years and shall be reviewed  | 
| 11 |  |  every 5
years, unless the Agency requires more frequent  | 
| 12 |  |  review through Agency
procedures.
 | 
| 13 |  |   b. During the review in paragraph (a) of this  | 
| 14 |  |  subsection, the Agency shall
fully review the previously  | 
| 15 |  |  submitted CAAPP permit application and
corresponding  | 
| 16 |  |  reports subsequently submitted to determine whether the  | 
| 17 |  |  source is
in compliance with all applicable requirements.
 | 
| 18 |  |   c. If the Agency determines that the source is not in  | 
| 19 |  |  compliance with all
applicable requirements it shall  | 
| 20 |  |  revise the CAAPP permit as appropriate.
 | 
| 21 |  |   d. The Agency shall have the authority to adopt  | 
| 22 |  |  procedural rules, in
accordance with the Illinois  | 
| 23 |  |  Administrative Procedure Act, as the Agency deems
 | 
| 24 |  |  necessary, to implement this subsection.
 | 
| 25 |  | (Source: P.A. 97-95, eff. 7-12-11.)
 |